Shoring Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Shoring Installation involves the placement of temporary or permanent shoring systems to support the roadway on SR 70 for Caltrans District 3 in the Marysville/Sacramento area. The scope of work includes the installation of shoring walls, supports, and soil nails utilizing materials such as steel shoring, timber lagging, and hydraulic shores. The selected contractor is responsible for delivering a fully installed and verified shoring system. A critical requirement for this project is that the contractor must hold valid OSHA shoring and trenching certification. The project is categorized under NAICS code 238990 and was posted on June 18, 2026.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of 03-1N550.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
BUT 70 Viaduct DO
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
