Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Tennessee was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoring System Design and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract requires the design, submission for approval, and installation of tieback shoring systems to support deep excavations in proximity to rail infrastructure, with the critical constraint of ensuring no disturbance to the track alignment during any phase of work. The scope demands specialized engineering expertise to develop geotechnical solutions that safeguard rail operations while enabling safe and stable excavation, likely involving precise load calculations, real-time monitoring, and coordination with rail authorities to maintain service continuity. The project is categorized as a subcontract under NAICS code 238910, indicating it relates to other specialty trade contractors, and is associated with the Tennessee Department of Transportation, specifically for a location in Cocke County. All work must be executed under strict compliance with safety and regulatory standards to protect both infrastructure and public safety. The solicitation was posted on May 8, 2026, with the same date listed as the response deadline, suggesting either a technical error or an urgent, possibly single-stage, contracting process. The_place of performance is specified as Cocke, with no further address details provided, but the context implies the work will occur near active rail lines requiring meticulous planning and execution. As a subcontract, this opportunity is intended for a specialized firm with proven experience in rail-adjacent shoring, likely requiring prior certifications, liability coverage, and demonstrated success in similar high-risk environments. The absence of a point of contact or set-aside designation implies the bid is open to qualified contractors without preferential treatment, and the online link directs to a portal for proposal submission through the agency’s official bidding platform.

General Info

Design and install tieback shoring near rail lines in Cocke County without disturbing track alignment.

Place of Performance

Cocke, TN, USA

Set-Aside

NONE

Documents

This scope was carved out of CN261034.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 010 CN261034

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → TDOT
ContactsNo contacts available
OfficeN/A
Organization / AgencyTennessee → TDOT
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, submit for approval, and install tieback shoring systems for deep excavations near rail infrastructure without disturbing track alignment.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS