Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 9, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoshone NF- South Zone - Rock Creek Culvert

Awarded
AG-82X9-S-09-0143Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Shoshone NF- South Zone - Rock Creek Culvert project, managed by the Department of Agriculture's Rocky Mountain Regional Office, involves the replacement of two existing 5-foot diameter corrugated metal pipe culverts with a new precast concrete box culvert measuring 25 feet wide by 28 feet span, including wingwalls. The scope of work encompasses a full range of civil engineering tasks, including clearing, temporary stream diversion, structure excavation, streambed simulation, backfilling, and road template reconstruction. Additionally, the contractor is responsible for soil erosion and pollution control, aggregate surfacing, waste disposal, and the installation of construction signage. Under solicitation AG-82X9-S-09-0143, the selected contractor is required to provide all necessary labor, materials, equipment, tools, and transportation to complete the project in Lander, Wyoming. All work must be performed in accordance with the provided plans, manufacturer shop drawings, and the established Standard and Supplemental Specifications.

General Info

Contract to replace two metal culverts with one concrete box culvert in Wyoming.

Contract Value

$202,952

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Approximately 30 miles south of Lander, WY on Hwy 28. Turn north onto the Louis Lake Loop Rd (FSR #300) and proceed 5 miles. Th, LANDER, WY, 82520, USA

Set-Aside

NONE

Award Issued Date

Documents

6
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
DOC, High priority: read this firstspecifications
High
DOC, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 7:00 PM UTC to 5:00 PM UTC on Jun 30, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA
Contacts
David H. Johnson

Full Description

Show more
The work shall consist of removing and disposing of two existing 5-foot diameter corrugated metal pipe culverts; clearing; constructing a temporary stream diversion; structure excavation; furnishing and installing 25-foot wide by 28-foot span precast concrete box culvert and wingwalls; furnishing and placing streambed simulation material; backfill; providing the associated soil erosion and pollution control; aggregate surfacing; road template reconstruction; waste material disposal; providing and installing construction signs; and clean-up. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and shallperform all work required to complete the project as shown on the plans, shown on the manufacturer's shop drawings, and as described in the Standard Specifications (FP-03) and Supplemental Specifications.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS