Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sidewalk Removal and Replacement (Concrete Work)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the full removal and replacement of 4-inch thick Portland Cement Concrete sidewalk panels at 137 designated locations within West Sacramento. Work includes all necessary procedures such as sawcutting around existing panels, complete demolition, preparation of the subgrade, and installation of a Class II aggregate base before pouring new concrete in accordance with City Standard Detail 202. The project requires precise adherence to engineering specifications to ensure durability and compliance with municipal standards. All tasks must be completed on-site at the identified locations, with no flexibility in method or material substitution. This subcontract opportunity is open for bidding under NAICS code 238910 and has a response deadline of September 4, 2026. The solicitation is managed by the City of West Sacramento in California, with the work taking place exclusively within the 95691 zip code area. Bidders must be prepared to coordinate logistics for multiple discrete sites and meet all labor, safety, and quality control requirements associated with public infrastructure replacement. The posting is available through the BidAmerica platform, and prospective contractors should review all technical and procedural details prior to submission.

General Info

Replace 4-inch concrete sidewalks at 137 locations in West Sacramento per city standards by September 4, 2026.

Place of Performance

West Sacramento, CA, 95691, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-027-ITB.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CFD Sidewalk Replacement 2026

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of West Sacramento
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full removal and replacement of 4-inch thick Portland Cement Concrete (PCC) sidewalk panels at 137 locations, including sawcutting, demolition, subgrade prep, Class II aggregate base placement, and concrete pouring per City Standard Detail 202.

More opportunities from California → City of West Sacramento

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS