Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Flooring Substrate Preparation and Moisture Mitigation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of West Sacramento involves flooring substrate preparation and moisture mitigation for recreation center projects. The selected contractor will be responsible for cleaning substrates through methods such as sandblasting, steel shot-blasting, scarifying, or water blasting, and installing Vapor Emission Treatment Systems in accordance with Section 09 05 61. A critical component of the scope includes conducting moisture and alkalinity testing using Wagner Rapid RH probes to ensure compliance with ASTM F1869, F710, and F2170 standards, ultimately delivering a certified, moisture-controlled substrate. The project is located in West Sacramento, California, under NAICS code 238310. Interested parties must submit their responses by the deadline of December 4, 2026.

General Info

Flooring substrate preparation and moisture mitigation for West Sacramento recreation centers by December 2026.

Place of Performance

West Sacramento, CA, 95691, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-082-RFP.

The full solicitation package (21 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Architectural And Engineering Design Services — Rec Center Locker Room Renovation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 15 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 21 documents on the prime contractFrom Architectural And Engineering Design Services — Rec Center Locker Room Renovation
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of West Sacramento
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs surface preparation and installs vapor barriers for prime contractors on City of West Sacramento recreation center projects. Cleans substrates via sandblasting, steel shot-blasting, scarifying, or water blasting and installs Vapor Emission Treatment Systems per Section 09 05 61. Conducts moisture and alkalinity testing using Wagner Rapid RH probes per ASTM F1869, F710, and F2170. Delivers a certified, moisture-controlled substrate.

Similar Contracts

Same NAICS industry code

NAICS: 238310
New
SLED
Drywall Removal, Treatment, and Repair HHSC RAS Office
Solicitation # HHS0018211
The Texas Health and Human Services Commission (HHSC) is soliciting competitive bids for the inspection, removal, treatment, and repair of drywall at the HHSC RAS Admin Office located at 11307 Rozell St., San Antonio, TX. The project is necessitated by an ice maker leak and covers rooms 1700, 1013, 1014, and 1015. The scope of work includes site preparation with 6-mil plastic sheeting and zip walls, demolition of damaged drywall, treatment of framing with EPA-registered antimicrobial wash, and the installation of matching R-value insulation and new drywall. Final deliverables include professionally finished, textured, and painted walls, with all furniture and equipment returned to their original layout. Award will be based on the best value to the State, considering price, the ability to meet performance requirements, and past vendor performance. Bidders must provide an all-inclusive price and adhere to strict performance standards, including a four-hour response time for standard service calls and a one-hour on-site response for emergencies. Contractors are required to conduct Texas Department of Public Safety criminal and sex offender background checks for all personnel and utilize the E-Verify system. Mandatory requirements include maintaining specific commercial general liability, auto, and professional liability insurance, and complying with the Buy Texas program. Responses must be submitted on a single USB drive by the deadline, including signed solicitation affirmations and addendum acknowledgments.
Health and Human Services Commission

POSTED

about 19 hours ago

DEADLINE

in 13 days
View Details

More opportunities from California → City of West Sacramento

Same awarding agency

NAICS: 238190
SLED
City Hall Second Floor Door Replacements
Solicitation # 26-097-ITB
The City of West Sacramento is seeking bids for the City Hall Second Floor Door Replacements project, which involves replacing two existing half-swing doors at the public permitting counter with two new full-height, lockable interior doors. The scope of work includes the demolition and disposal of existing doors, installation of solid-core wood doors with hap glass vision lites and hollow metal frames, and the patching and refinishing of affected counters, flooring, and walls to match existing finishes. A critical component of the project is the preparation for badge access control on the main door, including electrified strike prep, door position switch prep, power transfer paths, and conduit with pull strings. All work must comply with the California Building Code, and the contractor is responsible for obtaining all necessary permits and coordinating inspections. The contract will be awarded to the lowest responsive and responsible bidder, with an estimated project value of 8,500 dollars. Bids must be submitted electronically via the City's e-Procurement Portal by November 24, 2026. The successful contractor must provide a Performance Bond and a Payment Bond each totaling 100 percent of the bid price and must adhere to prevailing wage requirements, including DIR registration. Once a Notice to Proceed is issued, the contractor has thirty working days to complete the project and must submit a detailed work schedule within ten days of contract execution. There is no set-aside status for this solicitation.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

15 days ago

DEADLINE

in 4 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS