Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Sidewalk Repair Program - Package No. 81

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sidewalk Repair Program - Package No. 81 is a project undertaken by the City of Los Angeles to fulfill obligations under the Willits Settlement Agreement, specifically addressing ADA access barriers at twelve designated sidewalk locations across Council Districts 1, 4, 8, 9, 13, and 14. The work involves targeted removal of barriers causing accessibility issues, adjacent sidewalk repairs, installation of compliant curb ramps, and the removal of two street trees at 149 W and 151 W 78th Street, which requires separate discretionary approval from the Bureau of Street Services or the Board of Public Works. The project was determined exempt from the California Environmental Quality Act under Classes 1 and 32 categorical exemptions, with formal approval granted on September 26, 2025. All work must conform to the City’s Standard Specifications for Public Works Construction (Greenbook), Bureau of Engineering Standard Plans, Los Angeles Municipal Code, ADA accessibility standards, and the Willits Sidewalk Repairs Regulatory Compliance Measures and Best Practices. Inspection and acceptance occur at the project sites by the City’s Bureau of Engineering and Department of Public Works, ensuring alignment with all applicable codes and guidelines. No formal contract value, pricing details, or line-item information is provided, and the project is currently in a forecast phase with no solicitation number or award mechanism specified. The project is managed by the Bureau of Engineering, with David Nguyen as the primary point of contact, and all environmental documentation, including four technical memoranda and a project checklist, is on file with the agency. There are no identified contract clauses, special requirements, evaluation factors, or procurement instructions beyond compliance with municipal and ADA standards, and no funding mechanisms, invoicing procedures, or federal acquisition regulations are applied.

General Info

City of Los Angeles repairs sidewalks and installs ADA-compliant ramps at 12 locations under Willits Agreement.

Agency

California → City of Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

(1)

Sidewalk Repair Program - Package No. 81 CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts

Full Description

Show more
The Sidewalk Repair Program - Package No. 81 (Project) consists of the repair of existing sidewalks pursuant to the City of Los Angeles’ obligations under the Willits Settlement Agreement (U.S. Dist. Court Case No. CV10-05782 CBM [RZX]). The scope of work is limited to the removal of the specific Americans with Disabilities Act (ADA) access barrier(s) and adjacent work for the purpose of barrier removal, as identified by requestor/resident with a disability, in accordance with the applicable accessibility requirements, including those required by the ADA. The beneficiaries of the Project include the public and local businesses. The Project includes the removal of two street trees: One at Site 8008 at 149 W 78th St and one at Site 8008 at 151 W 78th St. Both need to be removed as part of the sidewalk repair which would require separate discretionary approval by the Bureau of Street Services, Urban Forestry Division or the Board of Public Works. Please see the project description continuation in the narrative for more details. The Bureau of Engineering 0 The Board of Public Works determined the project was exempt from the California Environmental Quality Act (CEQA) and approved the project on September 26, 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details