Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Sidewalk Repair Program - Package No. 85

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sidewalk Repair Program - Package No. 85 is a project managed by the City of Los Angeles Bureau of Engineering to repair existing sidewalks at twenty-two specific access request sites. This initiative is performed to fulfill the city's obligations under the Willits Settlement Agreement and focuses on the removal of Americans with Disabilities Act (ADA) access barriers as identified by residents with disabilities. The scope of work is limited to barrier removal and adjacent work conducted in accordance with applicable ADA accessibility requirements. Notably, the project includes the removal of two street trees at 3936 S Hill St, which requires separate discretionary approval from the Board of Public Works or the Bureau of Street Services, Urban Forestry Division. The project was approved on May 20, 2026, and is classified as a forecast with NAICS code 237310. It has been determined to be statutorily exempt from the California Environmental Quality Act (CEQA) under Public Resources Code Section 21080(b)(7), as the repairs are necessary for the hosting and carrying out of the Olympic and Paralympic Games and do not involve the construction of new facilities. Administrative oversight is provided by the Bureau of Engineering, with David Nguyen serving as the primary point of contact. The project benefits the general public and local businesses by improving accessibility across various locations in Los Angeles.

General Info

Repairing ADA-compliant sidewalks in Los Angeles, removing two trees at 3936 S Hill St, exempt from CEQA.

Agency

California → City of Los Angeles

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts

Full Description

Show more
The Sidewalk Repair Program - Package No. 85 (Project) consists of the repair of existing sidewalks pursuant to the City of Los Angeles’ obligations under the Willits Settlement Agreement (U.S. Dist. Court Case No. CV10-05782 CBM [RZX]). The scope of work is limited to the removal of the specific Americans with Disabilities Act (ADA) access barrier(s) and adjacent work for the purpose of barrier removal, as identified by requestor/resident with a disability, in accordance with the applicable accessibility requirements, including those required by the ADA. The beneficiaries of the Project include the public and local businesses. The Project includes the removal of two street trees: Two at Site 6167 at 3936 S Hill St. Both need to be removed as part of the sidewalk repair which would require separate discretionary approval by the Bureau of Street Services, Urban Forestry Division or the Board of Public Works. Please see the project description continuation in the narrative for more details. The Bureau of Engineering determined the project was exempt from the California Environmental Quality Act (CEQA) and approved the project on May 20, 2026.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, civil works, and surface improvements. Specific requirements encompass land surveying, site clearing, shoring, asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additionally, the project requires environmental and support services including storm water pollution prevention (SWPPP), quality control, and the supply of ready mix and precast concrete. This opportunity is specifically targeted toward qualified Small Business (SB), Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and a shared use path, including HMA paving, storm sewer improvements, and the installation of manholes and catch basins. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter. The engineer's estimate for the project is 1,111,000 dollars, and the work will be entirely funded by the City of Zeeland. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. Bids will be evaluated on a unit price basis, and only bidders prequalified by the City of Zeeland will have their proposals opened. Submissions must include a proposal guarantee in the form of a bid bond or certified check for five percent of the bid amount. The successful contractor will be required to provide performance and lien bonds for 100 percent of the contract value, as well as certification of Workmen's Compensation Insurance. All work must adhere to MDOT Standard Specifications for Construction and be performed by a licensed DC contractor under the direction of the project engineer.
Moore & Bruggink, Inc

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
2026 St. Mary¿s Dr. Storm Improvements & Paving
Solicitation # PE-66212-NONST-2027-000000036
The 2026 St. Marys Dr. Storm Improvements and Paving project, issued by the City of Waycross, Georgia, focuses on critical infrastructure upgrades and road resurfacing on St. Marys Dr. The scope of work includes the removal and replacement of 30 linear feet of 24-inch RCP with 30-inch RCP, the replacement of two double wing catch basins, and the installation of approximately 100 linear feet of curb and gutter. Additionally, the project requires sealing connections for two 15-inch HDPE storm pipes protruding into a 30-inch CMP. Paving improvements consist of approximately 2700 linear feet of milling and overlay, including an open-graded interlayer, asphalt leveling course, pavement striping, and patching, supported by traffic and erosion control measures. This project is funded through LMIG and requires all bidding contractors to be licensed by the State of Georgia. Bidders must be registered with Quest/ESG Engineering, Inc. as having purchased the complete bidding documents, which are available digitally via QuestCDN. Sealed bids must be submitted to the City Manager's Office by December 10, 2026, at 2:00 PM. Bids must include a bid bond or certified cashier's check for at least 5% of the base bid. The successful awardee will be required to provide performance and payment bonds each equal to 100% of the contract price.
City of Waycross

POSTED

about 6 hours ago

DEADLINE

in 30 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS