This Solicitation opportunity from California was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Turlock is soliciting proposals for Project No. CP 23-035 / CML-5165(102), titled Signal Coordination on Christoffersen Parkway. The project involves the implementation of traffic signal timing and coordination across multiple intersections, including Christoffersen Parkway at Walnut Road, Olive Avenue, Colorado Avenue, Berkeley Avenue, Crowell Road, Kilroy Road, Fosberg Road, Geer Road, and Golden State Boulevard. The scope of work includes mobilization, temporary traffic control, the installation of 2070LX traffic signal controllers with Omni eX software, signal head replacement, and the installation of seven conflict monitor units. An additive bid alternate for a Transit Signal Priority System is also included. The engineer's estimate for the project is 160,000.00 dollars.
Proposals are due by 3:00 pm on September 3, 2026, via the OpenGov Procurement Portal. The contract will be awarded to the lowest responsible and responsive bidder. Eligible contractors must hold a General Engineering Contractor (A) or Electrical Contractor (C-10) license. Key requirements include a bid bond of at least 10 percent of the total bid, and upon award, performance and payment bonds equal to 100 percent of the contract price. The project adheres to California and Federal prevailing wage rates, Buy America requirements for steel and iron, and Disadvantaged Business Enterprise (DBE) participation tracking. Work must commence within ten working days of the Notice to Proceed, with substantial completion required within twenty-five working days and final completion within thirty working days. Final acceptance is contingent upon the submission of acceptable as-built drawings to the City Engineer.
General Info
Signal coordination project in Turlock, CA, valued at $160,000, due September 3, 2026.
HighAI Summary for Bidder's Bond for City of Turlock Project: This document is a Bidder's Bond for a construction project for the City of Turlock, California. It binds the bidder and surety to a penal sum of 10% of the total bid amount, guaranteeing the bidder will enter into a contract and provide performance and payment bonds if awarded the contract. The bond ensures payment for labor and materials and includes provisions for legal costs if suit is brought. The document requires signatures and seals from both the bidder and surety, along with acknowledgments and a certified power of attorney for the surety's attorney-in-fact.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for CA20260018 California Prevailing Wage Rates July 14, 2026: This document is the California prevailing wage determination CA20260018, published on July 14, 2026, with modifications up to number 6 dated 07/14/2026. It covers wage rates and fringe benefits for various construction trades including asbestos removal workers, boilermakers, bricklayers, carpenters, divers, and others across multiple California counties. The document specifies rates for building, heavy, highway, and dredging construction projects, providing detailed classifications and area-specific wage data essential for federal and state construction contracts in California.
PDF
PDF, High priority: read this firsttraffic-signal-timing-plan
HighAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Colorado Ave - 2025-06-26: This Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Colorado Avenue in the City of Turlock is approved on June 26, 2025. Prepared by GHD and based on the California Manual on Uniform Traffic Control Devices, version 3.3, dated June 21, 2024, it details operation modes, phase sequences, unit setups, and device mappings for traffic signal control. The document includes technical specifications for signal timing, startup phases, and input/output configurations to ensure safe and efficient traffic flow. Minor temporary adjustments are permitted only with proper documentation and City Engineer approval.
PDF
PDF, High priority: read this firsttraffic-signal-timing-plan
HighAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Olive Ave - 2025-06-26: This Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Olive Avenue in the City of Turlock is approved on June 26, 2025. It is developed in accordance with the California Manual on Uniform Traffic Control Devices (CA MUTCD) and includes detailed operational modes, phase sequences, input/output mappings, and timing parameters for traffic signal control. The document is stamped and signed by the City Engineer, William D. Morris, and provides instructions for authorized personnel on adjustments and maintenance. The plan aims to ensure safe and efficient traffic flow with synchronized timing along W Christoffersen Parkway from N Golden State Blvd to N Berkeley Ave.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for City Project CP 23-035 Signal Coordination on Christoffersen Parkway Proposal: This document is a Request for Proposal (RFP) for City Project No. CP 23-035 / CML-5165(102) titled 'Signal Coordination on Christoffersen Parkway' in Turlock, California. Issued by the City Engineer, William D. Morris, it includes the Notice to Contractors, Proposal instructions, Agreement sample, and Special Provisions. The document outlines submission requirements, licensing, bid security, prevailing wage rates, insurance requirements, and contract conditions. Proposals are due by 3:00 pm on September 3, 2026, via the OpenGov Procurement Portal. It contains critical procurement details such as bid forms, scope of work, federal and state wage determinations, and contract execution terms.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Exhibit 12-B Bidder’s List of Subcontractors: Local Assistance Procedures Manual Exhibit 12-B, Bidder’s List of Subcontractors (DBE and NON-DBE), January 2021. This form is used by bidders on public works projects to list subcontractors who will perform work over the stated threshold and to identify DBE status, certification details, subcontract amounts, license numbers, and annual gross receipts. Part 2 also requires listing subcontractors who provided quotes or bids but were not selected. Includes distribution instructions and federal project number fields.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Exhibit 15-H Proposer/Contractor Good Faith Efforts: Local Assistance Procedures Manual Exhibit 15-H (May 2020), a 3-page form for proposers/contractors to document good faith efforts to meet a 0.00% DBE goal on a federal-aid project. It requests publication and solicitation records, work items offered to DBEs, rejected DBE information, outreach efforts, assistance related to plans/specs, bonding and insurance, contacts with agencies/organizations, and any additional supporting data. Used with cost proposal due date or bid opening submissions.
PDF
PDF, High priority: read this first1 page · subcontractors-listing
HighAI Summary for Subcontractors Listing Form for California Public Contract: This document is a subcontractors listing form pursuant to California Public Contract Code 4100. It requires the prime contractor to list each subcontractor who will perform work or labor or render services in the construction project if their contract amount exceeds 0.5% of the prime contractor's total bid or $10,000, whichever is greater. The form prohibits changes or substitutions after bid opening except as allowed by law and disallows listing multiple subcontractors for the same work item with 'and/or'. If no subcontractors are involved, the bidder must write 'NONE'. The form includes fields for subcontractor name, license number, DIR number, address, work items, and percentage of work to be performed.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Affidavit of Non-Collusion for Bid Submission: This affidavit is a sworn statement by the bidder affirming that the bid submitted is genuine and not collusive or sham. The bidder declares no collusion, conspiracy, or agreement with others to submit a sham bid or to refrain from bidding, ensuring fair competition. The document includes a jurat section for notarization under Government Code Section 8202, with spaces for the notary public's signature, printed name, and seal, confirming the bidder's identity and oath.
PDF
PDF, Low prioritycontract-document
LowAI Summary for City of Turlock Public Improvement Agreement CP 23-035 Signal Coordination: This Public Improvement Agreement dated August 11, 2026, is between the City of Turlock and a contractor for the construction of Signal Coordination on Christoffersen Parkway, City Project No. CP 23-035 / CML-5165(102). It outlines contract documents, term, scope of work, contract price, and related provisions. The agreement incorporates contractor's proposal, bonds, insurance, and city specifications. The contract price is to be determined and may be adjusted by change orders. The document sets forth the responsibilities, modifications, and performance requirements for the project under city supervision.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy and Crowell Rd - 2025-06-26: This document is the Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Crowell Road in the City of Turlock. Approved on June 26, 2025, it is prepared by GHD and follows the California Manual on Uniform Traffic Control Devices (CA MUTCD). The plan includes detailed operation modes, phase sequences, input/output mappings, and timing parameters for traffic signal control. It authorizes minor temporary adjustments by maintenance personnel under specific conditions and requires City Engineer approval for permanent changes. The document version is Omni Ex Version 3.3, dated June 21, 2024, and contains technical data for traffic signal programming and maintenance.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy and Walnut Rd - 2025-06-26: This document is the City of Turlock Traffic Signal Timing Plan for the intersection of Christoffersen Parkway and Walnut Road, approved on June 26, 2025. It includes detailed traffic signal operation modes, phase sequences, input/output mappings, and configuration parameters prepared by GHD. The plan follows the California Manual on Uniform Traffic Control Devices and authorizes minor temporary adjustments by maintenance personnel. The document is version 3.3 and provides technical details for maintaining safe and efficient traffic flow at the specified intersection.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Berkeley Ave - 2025-06-26: This Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Berkeley Avenue in the City of Turlock is approved on June 26, 2025. Prepared by GHD and based on the California Manual on Uniform Traffic Control Devices, version 3.3, dated June 21, 2024. The document details operation modes, unit setup, phase sequences, input mappings, and channel configurations for traffic signal control to maintain safe and efficient traffic flow. It includes technical parameters for signal phases, pedestrian calls, and device setups, with authorization by the City Engineer.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Fosberg Rd - 2025-06-26: This document is the Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Fosberg Road in the City of Turlock. Approved on June 26, 2025, it was prepared by GHD and follows the California Manual on Uniform Traffic Control Devices (CA MUTCD). The plan includes detailed operation modes, phase sequences, input/output mappings, and timing parameters for traffic signal control. It is intended to guide traffic signal maintenance and adjustments to ensure safe and efficient traffic flow at the specified location.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Geer Rd - 2025-06-26: This document is the Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Geer Road in the City of Turlock, approved on June 26, 2025. It includes detailed timing parameters, phase sequences, input/output mappings, and operational modes for traffic signal control equipment. The plan is prepared by GHD and follows the California Manual on Uniform Traffic Control Devices (CA MUTCD) standards. It authorizes minor temporary adjustments by maintenance personnel and requires City Engineer approval for permanent changes.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Golden State Blvd - 2025-06-26: This document is the Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Golden State Boulevard in the City of Turlock. Approved on June 26, 2025, it was prepared by GHD and follows the California Manual on Uniform Traffic Control Devices (CA MUTCD). The plan includes detailed operation modes, phase sequences, phase parameters, and input mappings for traffic signal controllers. It authorizes minor temporary adjustments by maintenance personnel and requires City Engineer approval for permanent changes. The document serves as a technical guide for traffic signal timing and maintenance at the specified intersection.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan - Christoffersen Pkwy & Mountain View Rd - 2025-06-26: This document is the Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Mountain View Road in the City of Turlock. Approved on June 26, 2025, it was prepared by GHD and follows the California Manual on Uniform Traffic Control Devices (CA MUTCD). The plan includes detailed operational modes, phase configurations, input/output mappings, and timing parameters for traffic signal control. It authorizes minor temporary adjustments by maintenance personnel under specific conditions and requires City Engineer approval for permanent changes. The document is version 3.3 and serves as a technical reference for traffic signal operation and maintenance at the specified location.
PDF
PDF, Low prioritytraffic-signal-timing-plan
LowAI Summary for City of Turlock Traffic Signal Timing Plan for Christoffersen Pkwy and Kilroy Rd - June 26, 2025: This document is the Traffic Signal Timing Plan (TSTP) for the intersection of Christoffersen Parkway and Kilroy Road in the City of Turlock, approved on June 26, 2025. It includes detailed operational modes, phase sequences, input/output mappings, and configuration parameters for traffic signal control equipment. The plan is developed in accordance with the California Manual on Uniform Traffic Control Devices and is authorized by the City Engineer. It provides instructions for maintenance personnel on permissible temporary adjustments and emphasizes the need for written approval for permanent changes.
PDF
PDF, Low priorityother
LowAI Summary for CP 23-035 Signal Coordination on Christoffersen Parkway: Document CP 23-035 titled 'Signal Coordination on Christoffersen Parkway' appears to be a map or diagram related to traffic signal locations along Christoffersen Parkway. It includes a legend indicating traffic signals and references to various street names and landmarks. The document does not contain solicitation details, contract terms, or technical specifications.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Disadvantaged Business Enterprises (DBE) Certification Status Change Instructions: This document provides detailed instructions for completing the Disadvantaged Business Enterprises (DBE) Certification Status Change form. It outlines the required information fields including contract numbers, agency names, contractor details, DBE certification numbers, payment amounts during certification, certification or decertification dates, and signature requirements from both the contractor/consultant and local agency representatives. The instructions ensure proper documentation and monitoring of DBE certification status changes related to contracts funded by local or federal agencies.
LowAI Summary for Disclosure of Lobbying Activities SF-LLL: This document is the Standard Form LLL (SF-LLL) used for the Disclosure of Lobbying Activities pursuant to 31 U.S.C. 1352. It requires reporting entities to disclose lobbying activities related to federal contracts, grants, cooperative agreements, loans, loan guarantees, or loan insurance. The form includes sections to identify the type and status of the federal action, details of the reporting entity and prime recipient if applicable, federal agency and program information, lobbying entity details, payment information, and a description of lobbying services performed. Instructions for completing the form are provided, emphasizing the legal requirement and penalties for non-compliance. The form is used to report lobbying activities to Congress and is available for public inspection.
PDF
PDF, Low priorityform
LowAI Summary for Exhibit 15-G Construction Contract DBE Commitment: Exhibit 15-G from the Local Assistance Procedures Manual is a Construction Contract DBE Commitment form, dated January 2019. It collects local agency, project, bidder, bid amount, subcontractor, and DBE certification details, and includes instructions for completing DBE participation entries, certification, signatures, and award-section information. The form is used to document and certify DBE commitments for construction contracts and to support award package submission.
PDF
PDF, Low priorityform
LowAI Summary for Exhibit 17-F Final DBE Utilization Report: California Local Assistance Procedures Manual Exhibit 17-F, Final Report – Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors, dated July 23, 2015. This form is used after contract completion to report subcontractor and DBE participation, including contract number, federal-aid project number, final contract amount, company information, DBE certification numbers, payments by DBE/non-DBE, work completion dates, and required signatures from the contractor/consultant and local agency representative. It also includes completion instructions for each field and distribution guidance.
PDF
PDF, Low priorityspecifications
LowAI Summary for Specifications Responsibility Notice - City Engineer William D. Morris: This document identifies the City Engineer, William D. Morris, as responsible for the front end specifications of contract documents. It includes contact information for the Engineering Division located at 156 S. Broadway Suite 150, Turlock, CA 95380. The document serves as a notice of specification responsibility rather than a full specification or solicitation.