Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on December 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Silver Lake Reclamation Project Containment Basins Decommissioning

Awarded
DEEP121925CMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the partial breaching and decommissioning of the embankments at the intersection of three containment basins, as detailed in the contract drawings. The project, titled "Silver Lake Reclamation Project Containment Basins Decommissioning," is designed to eliminate the water impoundment capacity of the embankments, thereby mitigating the risk of embankment loading. This work also aims to facilitate access to dredged materials within the basins for possible reuse in other State projects. The project follows established engineering and environmental standards to ensure safe and effective execution. Issued by the Connecticut Energy & Environmental Protection agency, the solicitation number DEEP121925CM was posted on December 19, 2025, with a response deadline set for January 27, 2026. The work is to be performed in Meriden, Connecticut, under NAICS code 237990, which corresponds to specialized heavy construction. The primary point of contact for this solicitation is Charlie Brown, who can be reached via the provided email. This solicitation is publicly listed on the Connecticut DAS bid portal.

General Info

Partial breaching and decommissioning of embankments at Silver Lake to mitigate risks and enable material reuse.

Documents

1

DEEP121925CM Silver Lake Reclamation Project ITB

PDF, High priority: read this first6 pages · itb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Energy & Environmental Protection
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Charlie Brown

Full Description

Show more
The primary Work of the project is the partial breaching and decommissioning of the basin embankments at the intersection of the portion of the embankments forming all three basins as shown in the Contract Drawings. The Project has been designed in general accordance with accepted engineering practices and environmental considerations. It is the intent of CTDEEP that the project will remove the potential for the embankments to impound water and, therefore, remove the risk of embankment loading, as well as to create access to the dredged material within the basins for potential reuse on State projects.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS