Sioux City Wastewater Treatment Plant Facility Plan - Phase 1 Improvements Project

Active
sioux-city-wastewater-treatment-plant-facility-plan-phase-1-improvements-project

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sioux City Wastewater Treatment Plant Facility Plan Phase 1 Improvements Project, managed by Rice Lake Construction Group, involves extensive upgrades and rehabilitations to critical plant infrastructure in Iowa. Key mechanical and process improvements include the replacement of preliminary treatment equipment, primary clarifiers, and the RAS pump station, alongside the conversion of aeration tanks to a three-stage process and the rehabilitation of an anaerobic digester for sludge storage. The project also encompasses the construction of a new secondary control building, the installation of plant-wide odor control systems, and the implementation of new standby emergency power generators, main switchgear, and SCADA system upgrades to ensure operational efficiency and safety compliance with NFPA 820 standards. The scope of work includes the demolition of several unused structures and pump houses, as well as comprehensive site and civil improvements. Required materials and services span a wide range of disciplines, including hazardous material abatement, concrete and masonry work, plumbing, HVAC, electrical systems, and specialized water and wastewater equipment. Interested parties must submit responses by October 28, 2026, for this solicitation which falls under NAICS code 221320.

General Info

Rice Lake Construction manages wastewater plant upgrades in Iowa, due October 28, 2026.

Place of Performance

IA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRice Lake Construction Group
Contacts1 person available
OfficeN/A
Organization / AgencyRice Lake Construction Group
Office AddressN/A

Full Description

Show more
Planned improvements shall include preliminary treatment building upgrades (mechanical screen replacement, grit equipment replacement, and HVAC improvements), primary clarifiers replacement, new primary sludge pumping station, new intermediate lift station, aeration tank rehabilitation and process improvements (conversion to three -stage), aeration blower replacement in a new secondary control building, replacement of existing final clarifier 1-4 mechanisms and structural rehabilitation and handrail replacement, new final clarifier construction, RAS pump station replacement in a new secondary control building, rehab of one anaerobic digester for conversion to sludge storage, plant wide odor control to address odors from the headworks, primary clarifiers, intermediate lift station, and solids dewatering areas, new plantwide standby emergency power generator(s), new WWTP main switchgear replacement, new WWTP SCADA system upgrades, code related improvements for NFPA 820 and other safety related standards, demolition of unused WWTP structures and buildings (north primary clarifiers and associated pump houses, south primary clarifiers and associated pump houses, south headworks building and grit detritor system, gas conditioning building, pipe valve vault building, garage #1, garage #2, and storage building adjacent to the chlorine contact tanks) and related HVAC, plumbing, electrical, instrumentation, and site/civil improvements. Scopes of Work and Materials Requested include but are not limited to: Hazardous material abatement, concrete work, masonry, miscellaneous metals, rough carpentry, glass fiber & resin fabrications, thermal & moisture protection, openings, finishes, identifying devices, toilet & batch accessories, fire extinguishers, aluminum flat covers, plumbing, HVAC, electrical, fire detection & alarm systems, earthwork, utilities, process interconnections, cranes & hoists, high pressure wash systems, process gas & liquid handling, purification, & storage equipment, odor control systems, and water & wastewater equipment.

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
SLED
Dickenson County Public Service Authority Haysi Wastewater Treatment Plant
Solicitation # RFP-129272
The Dickenson County Public Service Authority is seeking proposals for a five year turn key operational contract, starting January 1, 2026, to manage the Haysi Wastewater Treatment Plant in Virginia. The primary objective is to ensure 100 percent regulatory compliance and protect public health through the 24/7/365 management of a conventional secondary treatment plant utilizing a rotating biological contactor process. Interested parties must submit separate proposals for two options: one for the operation of the Publicly Owned Treatment Works only, and another for the combined operation of the plant and seven off site pump stations. The selected contractor will be responsible for providing all skilled labor, supervision, and specialized equipment, including a qualified operator for emergency responses and a staff electrician experienced in VFD operation and level transducers. Key duties include sludge management using a 0.5 meter belt filter press, interior and exterior groundskeeping, and performing routine repairs up to 2,000 dollars per event. All process control testing and compliance sampling must adhere to the State of Virginia operating permit and be conducted by an accredited laboratory, with monthly Discharge Monitoring Reports submitted to the DEQ. Proposals are due by November 16, 2026, via the Commonwealth of Virginia eVA Portal.
Dickenson County

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221320
New
Federal
Maintenance, Repair, And Operation Of Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater Treatment Plants To Include Operation, And Granular Activated Carbon (GAC) Filtering Systems at CFA Yokosuka
Solicitation # N4008426R1011
Solicitation N4008426R1011 is a single-award Indefinite Delivery Indefinite Quantity (IDIQ) service contract for the operation, preventative maintenance, and repair of critical infrastructure at Commander Fleet Activities (CFA) Yokosuka, Japan. The scope of work encompasses the incinerator plant and segregation yard, weight scales, potable water tanks, and wastewater treatment plants, including granular activated carbon filtering systems. The contractor is responsible for providing all necessary labor, supervision, management, tools, materials, and incidental engineering. Performance is measured through objective, performance-based metrics defined in the Performance Work Statement, and all work must adhere to original equipment manufacturer maintenance manuals and the laws and labor standards of Japan. The contract structure includes a base period and four option periods, with a total estimated government obligation ranging between 73,488,230.67 USD and 75,936,006.97 USD. Pricing is divided into recurring work, categorized as emergency, urgent, or routine, and non-recurring incidental work. The non-recurring work for the base and early option periods is generally capped at a not-to-exceed limit of 800,000,000 JPY, with a revised limit of 850,000,000 JPY for option period three. Order limitations are set with a minimum of 400,000 JPY and a maximum of 50,000,000 JPY per single item. Invoicing is processed electronically via the Wide Area WorkFlow system.
Navfacsyscom Far East

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS