Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Preparation and Grading

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

about 23 hours ago

DEADLINE

in 19 days
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for tank metals. All work is subject to oversight by a third-party paint inspector, and the project must be completed within 150 days from the Notice to Proceed. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with the Build America, Buy America Act and American Iron and Steel requirements, meaning all iron, steel, and construction materials must be produced in the United States unless a waiver is granted. Additionally, the contract is subject to Davis-Bacon Wage Rates and requires various certifications, including Equal Employment Opportunity and Non-Segregated Facilities. Awarding will be based on the most advantageous bid. Once awarded, the contractor must provide performance and payment bonds within 15 days and submit a list of key personnel before starting construction. Payment is processed monthly via an Application for Payment reviewed by the Engineer.
Berks County

POSTED

1 day ago

DEADLINE

in 18 days
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract is for site preparation and grading services including clearing, grubbing, excavation, grading, and erosion control to prepare the land for future construction activities. It is structured as a subcontract under a Total Small Business Set-Aside designation, exclusively available to small businesses as defined by the SBA. The associated NAICS code is 237990, indicating it falls under other heavy and civil engineering construction. Work is to be performed in Saint Louis, Missouri, with a zip code of 63125, and the solicitation is managed by the Department of Defense through the W7NJ Uspfo Activity Moang 131 office. The opportunity was posted on July 15, 2026, with responses required by 3:00 PM Eastern Time on July 21, 2026. All work must comply with federal regulations and site-specific requirements for environmental control and land preparation prior to any construction phase.

General Info

Small business subcontract for site prep and grading in Saint Louis, Missouri, under DoD solicitation.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Saint Louis, MO, 63125, USA

Set-Aside

SBA

Documents

This scope was carved out of W50S8K26QA002.

The full solicitation package (21 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LTUY202005 Construct Vehicle Operations Covered Parking

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NJ Uspfo Activity Moang 131
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Clearing, grubbing, excavation, grading, and erosion control for site preparation prior to construction.

More opportunities from Department Of Defense → W7NJ Uspfo Activity Moang 131

Same awarding agency

NAICS: 238220
Federal
FY26 Construction Forecast: Jefferson Barracks ANGS, St. Louis MO
Solicitation # JB2601
The 131st Mission Support Group Contracting Office has issued a special notice providing a forecast of construction and repair opportunities for fiscal year 2026 at the Jefferson Barracks Air National Guard Station in Saint Louis, Missouri. This informational notice serves as a guide for small businesses regarding upcoming projects and does not commit the government to a purchase. Interested firms are encouraged to provide their SAM UEI number, bonding capacity, and a summary of in-house capabilities to the primary point of contact, MSgt Joe Bernier. The forecast includes a variety of projects with differing magnitudes and performance periods following the notice to proceed. Key projects range from high-value tasks such as constructing covered parking with solar panels and repairing the Building 99 roof, both estimated between 500 thousand and 1 million dollars, to smaller repairs such as boiler replacement, window and dormer repairs, shower stall replacements, and HVAC unit replacements. Procurement methods vary, utilizing Commercial Simplified Procedures RFQs and Simplified Acquisition Requests for Proposals, with several projects specifically set aside for small businesses. Project statuses are updated periodically, with some solicitations already awarded and others remaining open or planned for future release.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

29 days ago

DEADLINE

N/A
View Details
NAICS: 236220
Federal
LTUY232044 Repair Buildings 1, 28, and 36 Windows
Solicitation # W50S8K26QA004
The 131st Mission Support Group at Jefferson Barracks Air National Guard Station in Saint Louis, Missouri, is preparing to issue a presolicitation for a single firm-fixed price purchase order to replace windows in Buildings 1, 28, and 36. The work involves installing commercial-grade single-hung operable windows that match the original style of the existing units, with performance expected to be completed within 120 days after the notice to proceed. This action is being conducted under simplified acquisition procedures per FAR 12.201-1(c)(2) and is set aside exclusively for small businesses. The solicitation number is W50S8K26QA004, classified under NAICS code 236220 for building construction, and the anticipated award date is no later than August 31, 2026. No formal solicitation documents will be posted to SAM.gov; instead, all responsible sources may submit quotations directly to the agency. The point of contact for inquiries is MSgt Joe Bernier, reachable via phone or email listed in the contract data. Equitable adjustments for any change orders will follow standard FAR, DFARS, and AFARS guidelines, with no additional National Guard-specific policies applicable, and historical data on defini-tization timelines for change orders is not currently available but may be provided in future notices.
Commercial and Institutional Building Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS