Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Restoration and Environmental Reclamation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 21 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract tasks the successful bidder with fully restoring a site following demolition activities, ensuring compliance with environmental regulations and the specific management objectives of the refuge. This includes grading the land to establish proper drainage and contour, implementing erosion control measures, replanting native vegetation to restore ecological function, and completely removing all temporary access roads and construction remnants. All work must align with federal environmental laws and the conservation priorities of the managing agency, emphasizing long-term habitat recovery and landscape stability. This is a subcontract under a Total Small Business Set-Aside, limited exclusively to small businesses as defined by the SBA, and is classified under NAICS code 541620 for environmental consulting services. The solicitation was posted on June 29, 2026, with responses due by 9:00 PM Eastern Time on July 15, 2026. The performing entity is part of Construction A/e Team 2 Fws under the Department of the Interior, though the exact location of the site and point of contact details are not specified. All work is to be carried out in accordance with federal environmental standards, with the ultimate goal of returning the landscape to a natural, sustainable condition.

General Info

Small business to restore site post-demolition with native vegetation, erosion control, and federal environmental compliance.

Agency

Department Of The Interior → Construction A/e Team 2 FwsView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

VA

Set-Aside

SBA

Documents

This scope was carved out of 140FC226Q0037.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

P--WV CANAAN VLY NWR BONNER HS DEMO

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 2 Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Construction A/e Team 2 Fws
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Restore the site post-demolition through grading, erosion control, revegetation, and removal of temporary access routes, in compliance with environmental laws and refuge management goals.

More opportunities from Department Of The Interior → Construction A/e Team 2 Fws

Same awarding agency

NAICS: 238220
New
Federal
N--Generator and ATS Replacement - Allegheny NFH, PA
Solicitation # 140FC226Q0049
Solicitation 140FC226Q0049 is a Total Small Business Set-Aside for a firm-fixed-price construction contract to replace the emergency power system at the U.S. Fish and Wildlife Service Allegheny National Fish Hatchery in Warren, Pennsylvania. The project involves the removal of an existing 675 kW Caterpillar standby generator and the installation of a new 500 kW Caterpillar generator and Automatic Transfer Switch (ATS). To facilitate the installation, the contractor must temporarily remove and reinstall five bollards and a 2,000-gallon diesel fuel tank. The work is mission-critical to ensure continuous backup power for groundwater wells and fish culture operations, requiring the contractor to maintain power continuity via a temporary generator. The construction magnitude is estimated between $100,000 and $250,000, with a period of performance of 360 days after the notice to proceed. The award will be based on best value, considering both price and past performance, with non-price factors weighted as slightly more important than price. Offerors must provide three examples of similar projects completed within the last five years. The project requires compliance with NEC (NFPA) standards, OSHA 29 CFR 1926 and 1910 safety regulations, and Davis-Bacon wage determinations for Warren County. Key deliverables include a complete commissioning and acceptance package, O&M manuals, warranty information, and as-built drawings. Quotes are due by September 17, 2026, at 11:00 AM Central Time, and must be submitted via email to the designated point of contact.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS