Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sitework and Site Development

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract pertains to sitework and site development activities for a data center facility, encompassing grading, paving, utility connections, and other related site preparation tasks essential to supporting the facility’s construction and operational readiness. All work must align with the specifications outlined under NAICS code 237310, which classifies this as heavy and civil engineering construction, indicating the technical complexity and scale of the infrastructure involved. The project is structured as a subcontract and is being procured by the Board of Regents of the University System of Georgia, underscoring its association with a public educational institution’s broader infrastructure initiatives. The solicitation was posted on April 30, 2026, with a firm response deadline of May 22, 2026, at 7:00 PM, requiring interested parties to submit their proposals within this narrow window. The place of performance is located within Georgia, though specific city or zip details are not provided, suggesting the site may be on or near a university campus under the Board of Regents’ jurisdiction. While no set-aside preferences or point of contact information are listed, procurement is being managed through the Georgia Department of Administrative Services’ procurement portal, indicating a formal state-level bidding process. Contractors must be prepared to meet all regulatory, safety, and technical standards required for utility integration and site development in a sensitive infrastructure environment.

General Info

Site development subcontract for University of Georgia data center; grading, paving, utilities due May 22, 2026.

Documents

This scope was carved out of PE-47200-RFQ-2026-000000125.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GIT, BR-30-2602-DB GTRI 1906 - 430 South Hawks Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Grading, paving, utility connections, and other site development activities around the data center facility.

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

NAICS: 541330
New
SLED
DSC J-472 DP, Utilities Upgrades Phase 1 RFQ-RFP
Solicitation # PE-47200-RFQ-2027-000000164
The Board of Regents of the University System of Georgia is soliciting design professional services for Project No. J-472, Utilities Upgrades Phase 1 at Dalton State College in Dalton, Georgia. The scope of work encompasses a comprehensive design process including program validation, existing site conditions analyses, and construction administration. The selected Design Professional will also be responsible for procuring and contracting specialized services for topographic surveying, utility location, geotechnical testing, and Phase I Environmental Site Assessments. The project is estimated to commence in Winter 2027, with construction documents expected by Fall 2027, and a preliminary construction cost limitation of approximately 4,050,000 dollars. The estimated base fee for the design professional services is approximately 344,250 dollars. The selection process is a multi-step evaluation following the State Construction Manual. Initially, firms are evaluated on a Statement of Qualifications based on relevant project experience (45%), suitability regarding laws and safety standards (30%), and firm stability (25%). Finalists will then undergo interviews evaluated on their design methodology (25%) and team communication and project solutions (25%). Proposals must be submitted as a single PDF via the BOR Egnyte platform by December 15, 2026, and must not exceed 50 pages. Required documentation includes several exhibits, such as a notarized certification form, a certificate of insurance and minority status, a contractor affidavit, and a proposer's disclosure statement.
Engineering Services

POSTED

5 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS