Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on July 27, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--SKINNER TRAIL RESURFACING

Awarded
140L1722Q0023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 8 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Skinner Trail Resurfacing project, solicitation 140L1722Q0023, is a firm fixed price construction contract awarded by the Bureau of Land Management's Colorado State Office for work in Mesa County, Colorado. The project focuses on resurfacing an ADA compliant trail, with a total performance period of 30 days and an estimated start date of August 1, 2022. The scope of work includes the furnishing, placement, and compaction of 190 cubic yards of decomposed granite trail mix to a depth of 5 inches and a width of 4 feet. Additional technical requirements involve excavation, grading, and the installation of contractor-furnished corrugated steel pipe culverts. The contractor is responsible for providing all necessary equipment, including pumps and trucks for watering to ensure proper aggregate compaction. Project execution is guided by detailed plan views covering the first, middle, and end sections of the trail, which specify stationing, turnout locations, and designated staging areas such as Skinner Cabin. Compliance requirements include adhering to Colorado heavy construction wage determinations, National Defense Authorization Act telecommunications prohibitions, and specific quality assurance protocols. While aggregate surfacing is a primary pay item, costs for watering, culvert installation, and excavation are to be integrated into other bid items.

General Info

Contract Value

$38,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

16

140L1722Q0023 Section 02730 - Aggregate Surfacing

PDF, High priority: read this firstspecifications
High

140L1722Q0023 - Skinner Trail Resurfacing Plan View-Middle Section

PDF, High priority: read this firstspecifications
High

Plan View-End Section (140L1722Q0023)

PDF, High priority: read this firstspecifications
High

Plan View-First Section - Project 140L1722Q0023

PDF, High priority: read this firstspecifications
High

RFQ 140L1722Q0023 - Construction in Mesa County, CO

PDF, High priority: read this firstrfq
High

Section 02315 - Excavation and Fill (Skinner Trail Resurfacing)

PDF, High priority: read this firstspecifications
High

Section 02339 - Watering (Skinner Trail Resurfacing)

PDF, High priority: read this firstspecifications
High

Section 02640 - Culverts (Skinner Trail Resurfacing)

PDF, High priority: read this firstspecifications
High

Skinner Trail Resurfacing - Schedule of Items

PDF, High priority: read this firstspecifications
High

Skinner Trail Resurfacing - Section 01009 General Information and Requirements

PDF, High priority: read this firstspecifications
High

Skinner Trail Resurfacing - Site Plan-Satellite View

PDF, High priority: read this firstspecifications
High

Skinner Trail Resurfacing - Title Sheet

PDF, High priority: read this firstspecifications
High

Skinnor Trail Resurfacing - Details & Sections

PDF, High priority: read this firstspecifications
High

Wage Determination C020220003 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

Form 889 - Contractor's Certification on Compliance with NDAA

PDF, Low priorityrepresentation-certification
Low

Past Performance Questionnaire - Skinner Trail Resurfacing

DOC, Low priority6 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Colorado State Office
Contacts1 person available
OfficeLakewood, CO, 80225, USA
Office AddressLakewood, CO, 80225, USA

Full Description

Show more
SKINNER TRAIL RESURFACING Bureau of Land Management, Department of the Interior, Colorado State Office, Lakewood, Colorado has a requirement for SKINNER TRAIL RESURFACING. The work includes, but is not limited to furnishing labor, equipment, supplies, and materials, to resurface an existing aggregate ADA compliant trail as shown on the drawing and specified herein. A pre-bid site tour will be provided on June 28, 2022. Vendors shall meet at 10:00 AM local time at the Skinner Trail/FPA Trailhead Parking Area. For questions regarding to site tour, please contact COR: Blaine Vecchia, +1 (555) 000-0000 contact@example.gov The solicitation shall be set aside for Small Business Set Aside. NAICS code is 237990, (Other Heavy and Civil Engineering Construction), size standard is $39.5 million. Estimated price range is between $25,000.00 and $100,000.00. It is anticipated the solicitation package will be issued approximately June 25, 2022. Please visit https://sam.gov for updates.

More opportunities from Department Of The Interior → Colorado State Office

Same awarding agency

NAICS: 236220
New
Federal
Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
Solicitation # 140L1726R0001
Solicitation 140L1726R0001 is a Firm Fixed Price construction project for warehouse improvements at the Montrose Public Lands Center in Montrose, Colorado. The scope of work includes asbestos abatement, bathroom remodeling, flooring replacement, installation of a new rooftop heating and cooling unit, and the replacement of a manual overhead door with an electric one. Additional requirements involve upgrading luminaires and electrical outlets, maintaining the metal roof, repairing existing overhead doors, and replacing a photovoltaic inverter. The project is a 100% Total Small Business Set-Aside under NAICS 236220, with a performance period scheduled from November 16, 2026, to May 30, 2027. The contract is governed by FAR Part 15 and FAR Part 36, with award based on Best Value using an acceptable/unacceptable rating for technical approach, experience, and past performance. Contractors must comply with Davis-Bacon Act wages for Montrose County and maintain active registration in SAM.gov. For contracts exceeding 150,000 dollars, 100% performance and payment bonds are required, and a bid guarantee of 20% of the bid price must be submitted. Invoicing is processed electronically through the Invoice Processing Platform with 14-day prompt pay and progress payments. The prime contractor is required to self-perform at least 15% of the contract value, excluding materials.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
Federal
B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Solicitation # 140L1726R0010
Solicitation 140L1726R0010 is a total small business set-aside construction contract issued by the Department of the Interior's Colorado State Office. The project focuses on hydrologic restoration to benefit the endangered Gunnison sage-grouse in the Crawford, Colorado area. The primary objective is to improve drainage on approximately 7.75 miles of rural roads by installing 204 rolling dips and associated lead-out ditches. These structures are designed to redirect surface water off roadways and onto adjacent sagebrush vegetation to mimic natural hydrologic flow. Construction is strictly limited to a work window between August 30, 2027, and October 22, 2027, although the overall period of performance extends through October 29, 2027. The government will utilize a best-value tradeoff award method, weighing price equally against the combined factors of technical approach, past performance, and schedule. Technical requirements are stringent, requiring rolling dips to be constructed at approximately a 30-degree angle with a cross slope between 4% and 8%, and lead-out ditches not to exceed 57.5 feet in length. Performance is monitored via a Quality Assurance Surveillance Plan, with a 95% acceptance threshold for inspected structures and zero tolerance for disturbances in identified avoidance zones. The contract is subject to Davis-Bacon Act wage determinations and requires contractors to maintain liability insurance and provide resumes for key personnel demonstrating significant experience in project planning and well installation.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS