Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on April 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SLATE MINE ROAD AT PINE LOG CREEK BRIDGE REPAIR

Closed
PE-66400-NONST-2026-000000013State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

37 minutes ago

DEADLINE

in 19 days
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 5 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract issued by the Gordon County Board of Commissioners seeks qualified contractors to perform comprehensive bridge repair work on Slate Mine Road at Pine Log Creek in Georgia. The scope encompasses concrete repair through locating existing reinforcing steel and embedments, saw cutting, removing deteriorated concrete or previous patches, and installing new concrete patch material. Additionally, the work includes cleaning and repainting bridge beams, installing rip-rap as directed, cleaning and resealing deck joints, realigning bearings, and repairing anchor bolts. All work must comply with the Georgia Department of Transportation (GDOT) Standard Specifications (2001 edition), state environmental regulations including the Erosion and Sedimentation Control Act, and NPDES permit requirements. The project requires adherence to a strict schedule with work beginning within 30 calendar days of the Notice to Proceed and completing all tasks within 180 calendar days. Liquidated damages of $200 per day apply for delays beyond this period excluding those caused by inclement weather. Bidding contractors must submit sealed written proposals by 2:00 p.m. on June 25, 2026, including a bid bond, statement of qualifications, proof of insurance, a Drug-Free Workplace Certificate, and a notarized Non-Collusion Affidavit. The award will be made on a Lowest Price Technically Acceptable basis, with the low responsive and responsible bidder receiving the contract. The solicitation does not use federal acquisition regulations, instead operating under Georgia state law and GDOT standards. Contract administration involves monthly invoicing with payments processed by Gordon County, although no electronic invoicing system is specified. Special contract provisions require subcontractor approval by both Gordon County and GDOT, pre-construction meetings, coordination with utility locating services prior to excavation, and strict compliance with environmental and drug-free workplace laws. No socioeconomic certification or small business status is collected, and no MIL-STD or federal clause references appear, reflecting the local government and civil infrastructure nature of the project. All proposals must be physically delivered to the county purchasing office with original signatures; electronic submissions are not accepted.

General Info

Bridge repairs on Slate Mine Road, Georgia; concrete work, painting, environmental compliance, strict timeline.

Documents

4

Addendum 2 - Special Provision 518 Raise Existing Bridge

PDF, High priority: read this firstamendment
High

Addendum Questions Answered Jun 17, 2026

PDF, High priority: read this firstamendment
High

Invitation to Bid - Slate Mine Road Bridge Repair

PDF, High priority: read this firstitb
High

Slate Mine Bridge Plans.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Gordon County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Gordon County Board of Commissioners is accepting sealed written bids from qualified contractors for the bridge repair on Slate Mine Road at Pine Log Creek. This project consists of repairing concrete by locating existing reinforcing steel and miscellaneous concrete embedments within the vicinity of the repair; saw cutting concrete; removing deteriorated concrete and/or existing patch material; and installing concrete patch material. Bridge painting (clean and repaint beams). Add Rip-Rap as directed by the Engineer. Clean and reseal deck joints. Realign bearings and repair anchor bolts.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS