Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Slim Creek Bridge No. 2165 Pier No. 1 & 4 Repair Highway #16

Closed
BC38622MJ0000International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signals and lighting, along with environmental support through storm water pollution prevention. Required materials include precast concrete, ready mix supply, manhole materials, and various valves and fittings. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certified entities. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. A critical requirement is that subcontractors and material contractors must provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the bond premiums. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving, culvert replacement, drainage improvements, and signage. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in a stone trench, and 2,800 feet of modified concrete curb and gutter. The project is entirely funded by the City of Zeeland with an engineer's estimate of 1,111,000 dollars, and all work must be completed by April 30, 2027. Encrypted bids must be submitted via the Bid Express site by 11 a.m. local time on Thursday, November 12, 2026. Only bidders prequalified by the City of Zeeland will have their bids opened. Proposals must be based on unit prices and must be accompanied by a proposal guarantee of five percent of the bid amount. Award evaluation is primarily based on the total bid price and the competency of the bidder. Successful contractors are required to provide performance and lien bonds each totaling 100 percent of the contract value, as well as certifications for Workmen's Compensation Insurance and manufacturer certifications for sewer pipes. Project direction is managed by Scott A. Smith, P.E. of ZEEZON LLC, with inspection services provided by Moore & Bruggink, Inc.
Moore & Bruggink, Inc

POSTED

about 7 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract involves the repair of Slim Creek Bridge Nos. 2165 Pier 1 and Pier 4 along Highway 16. Key tasks include removing deteriorated concrete surfaces from hammer heads and pier columns, cleaning existing reinforcement, and replacing or installing new reinforcing bars where necessary. To address corrosion, galvanic strip anodes will be attached to the rebars—specifically on hammer heads for corrosion mitigation, and continuous vertical galvanic strip anodes on pier columns. After reinforcement work, the concrete surfaces will be reinstated and an overbuild of new concrete applied over the pier columns. This solicitation, issued by the Northern Regional Office of the Government of Canada, was posted on March 30, 2026, with a response deadline of April 23, 2026. Interested parties are directed to submit project-specific inquiries via email to the designated project contact, Yamini Komath, ensuring all communication is streamlined. The contract falls under federal jurisdiction and requires adherence to the specified scope of work for structural repair and corrosion protection to extend the bridge’s service life.

General Info

Repair Slim Creek Bridge Piers 1 and 4 with concrete removal, reinforcement, and corrosion protection.

Agency

Government of Canada → Northern Regional Office

Place of Performance

CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Northern Regional Office
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Northern Regional Office
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Remove deteriorated concrete surface of hammer heads, clean and replace deteriorated reinforcement, attach galvanic strip anodes to the rebars to mitigate corrosion, reinstate the hammer head concrete surface. Remove deteriorated concrete from the two pier columns, clean existing reinforcement and install new reinforcing bars dowelled in the new concrete, attach continuous vertical galvanic strip anodes to the rebars and install new concrete overbuild. Please direct all project specific enquiries related to this RFx by email to the Project Contact identified below and on the “Opportunity Details” tab under Additional Information SCT3.Project Contact Name: Yamini KomathEmail Address: contact@example.gov

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS