Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Slope Stabilization: Soil Nailing & Wire Mesh

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves performing uphill slope stabilization for prime contractors on civil engineering projects within the City of Fremont, California. The scope of work includes the installation of high-strength Tecco Mesh and the drilling and placement of soil nails. The contractor is responsible for executing soil nail verification, proof, and creep tests, applying necessary corrosion protection, and installing monitoring instrumentation to ensure a stabilized slope with verified anchors. All operations must strictly adhere to the specifications provided by the Geotechnical Engineer of Record and comply with California Building Code seismic criteria. This project falls under NAICS code 238990 and is focused on delivering a secure and verified structural stabilization solution for the designated site in Fremont.

General Info

Subcontract for slope stabilization using Tecco Mesh and soil nails in Fremont, California.

Agency

California → City of Fremont

Place of Performance

Fremont, CA

Set-Aside

NONE

Documents

This scope was carved out of PWC9105.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Morrison Canyon Road Storm Repair and Mitigation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 8 documents on the prime contractFrom Morrison Canyon Road Storm Repair and Mitigation Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fremont
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Fremont
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs uphill slope stabilization for prime contractors on City of Fremont civil engineering projects. Installs high-strength Tecco Mesh and drills and installs soil nails. Executes Soil Nail Verification, Proof, and Creep Tests, applies corrosion protection, and installs monitoring instrumentation. Adheres to Geotechnical Engineer of Record specifications and California Building Code seismic criteria. Delivers a stabilized uphill slope with verified anchors.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Garage and Overhead Door Repair and Maintenance Services
Solicitation # FA3-6428
Solicitation FA3-6428 seeks to establish a pool of qualified vendors to provide on-call and scheduled repair and maintenance services for approximately 170 garage door systems, gates, and concession doors citywide for the City of Seattle. The scope of work includes all labor, equipment, and materials for mechanical, electrical, and control system repairs, structural hardware adjustments, and preventative maintenance for overhead sectional and roll-up systems. Full door replacements are excluded from this contract. To ensure operational readiness, vendors must provide 24/7 emergency response services, with a requirement to return emergency calls within 60 minutes and deploy for non-emergency requests within 24 hours. Eligible vendors must have been in business for at least two years and possess appropriate licensing, including a 01 Electrician license for electrical work. The City will award contracts to the lowest responsive and responsible vendors, with historical annual usage estimated at 800,000 dollars. To avoid classification as Public Works, individual work orders are capped at 200,000 dollars without prior approval. Contractors must adhere to strict safety standards, including WAC 296 Lockout-Tagout procedures, and comply with all applicable ADA and non-discrimination laws. Bids must be submitted electronically via the procurement portal by December 17, 2026.
FAS - Purchasing

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS