09-42930State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, District 9 - Bishop, is proposing restoration activities at the Smokey Bear Flats Mixing Table located at US 395 Post Mile 29.2 in Mammoth Lakes, Mono County. The project focuses on the removal of reclaimed asphalt product (RAP) from previously disturbed areas, with work involving the use of heavy equipment such as graders, loaders, and dump trucks to remove material up to 3 feet deep along the edges of the existing paved surface. All collected material within 50 feet of the pavement will be hauled off-site to an approved disposal facility. Additionally, the scope includes soil sampling via push bore pits to assess subsurface conditions. This project is classified as a forecast and is categorically exempt under CEQA Section 15530(b)(5), as it is determined that the activities will not cause significant environmental effects. To safeguard sensitive resources, the project requires the implementation of protective measures, including on-site biological monitoring, the hand removal of debris, and the collection of rare plant seeds prior to grading. The primary point of contact for the project is Senior Environmental Scientist Heather Elder, with administrative oversight provided by Branch Chief Stephen Pfeiler. No specific contract value, performance timeline, or formal procurement evaluation criteria have been established in the current documentation.

General Info

Caltrans to remove RAP and conduct soil sampling at Smokey Bear Flats with ecological mitigation, no contractor identified.

Agency

California → Caltrans, District 9 - Bishop

Place of Performance

Mammoth Lakes, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 9 - Bishop
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 9 - Bishop
Office AddressN/A

Full Description

Show more
The California Department of Transportation proposes to conduct restoration activities at the Smokey Bear Flats Mixing table in Mono County. Restoration activities will include the removal of reclaimed asphalt product (RAP) which is present throughout the site. Work will include the use of heavy equipment (i.e., graders, loaders, and dump trucks) to remove material up to 3 feet deep along the inside and outside edges of the existing paved surface. Material collection will occur within 50 feet of the existing paved surface and will be hauled off site to an approved end use disposal site. Additional ground-disturbing activities will include soil sampling pits (push bore samples) at various locations throughout the project area

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
RRUMC 4th Floor Patient Care Reconfiguration – BP 11 – Demolition, Concrete, Framing And Drywall
Solicitation # 907518.01
The Ronald Reagan UCLA Medical Center 4th Floor Patient Care Reconfiguration project, specifically Bid Package 11, focuses on the conversion of Behavioral Health spaces into Medical/Surgical spaces to expand inpatient bed capacity by up to 103 beds. The scope involves renovating approximately 67,400 square feet of the 115,600 square foot fourth floor, with work extending to the third and fifth floors, outdoor decks, and along Charles Young Drive. Key deliverables include complete selective demolition, concrete repair, metal stud framing, and the installation of level 4 drywall. Additionally, the contractor must provide design-build services for modifications to the existing pneumatic tube system and ensure all alterations meet ADA compliance, sustainability, safety, and security standards. The contract is a lump sum base bid awarded to the lowest responsive bidder, with the final sum calculated based on the base bid, unit prices, compensable delay rates, and any included alternates. Performance is subject to strict quality standards, including CBC/CFC and NFPA regulations, with final acceptance requiring a Letter of Completion from the University Representative after successful testing and submission of as-built diagrams. Bidders must be licensed California contractors and provide a UCIP Form 1-B regarding safety qualifications. The project requires adherence to prevailing wage laws, the provision of performance and payment bonds, and participation in a University Controlled Insurance Program. Bids are due by 2:00 p.m. on December 3, 2026.
The Regents of the University of California

POSTED

about 15 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS