Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on October 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Snow Plowing, Snow Removal, Ice Control for Souris Search & Rescue Station

Closed
30006954International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Government of Canada → Department of Fisheries and OceansView Agency

NAICS

N/A

Place of Performance

*Canada, CAN

Set-Aside

NONE

Documents

(1)

30006954-rfp-eng-final-souris_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Fisheries and Oceans
View Agency Profile
Office AddressN/A
Contacts
Terri JonesPoint of Contact

Full Description

Show more
The contractor is responsible to supply and install their own road markers, which shall be commercially available markers, manufactured for this purpose, or a suitable substitute pre-approved by the Department Representative. For the initial contract period, road markers must be installed by November 30 of the contract year. The contractor is to take into consideration any potential underground services prior installing. The contractor must start snow clearing activities when 8cm (Eight) of snow has accumulated or when deemed necessary by the Departmental Representative. The contractor must remove snow and use contractor provided materials for ice control by the application of salt, a mixture of sand and salt, or ice melt to prevent slippery conditions on all locations indicated on Appendix A – Site information. All pathways and areas around fire hydrants must be kept clear and accessible. Parking lot(s) must be cleared of snow by 0700hrs daily, and must be kept clear of snow, as identified under the scope of work, in a timely manner to facilitate both shift and day workers as applicable. General working hours for the Souris Search and Rescue Station are 0800hrs to 1600hrs daily. For all roads and roadways, the area to be blown/plowed is from the edge of the pavement to the edge of pavement or from the curb to curb, with the shoulder to be winged back, paying particular attention to intersections for visibility purposes. These will be blown or plowed after 8 (eight) cm accumulations and repeated during the storm so as to hold snow accumulation to 8 (eight) cm or less, with final complete removal and clearing at the end of the storm. Plow and equipment blades shall be adjusted, including down pressure if required to leave a minimum amount of snow on the roadway and other areas. The said blades shall also be angled away from vehicles, fire hydrants, fences, concrete abutments, and the perimeter wall. The Contractor shall not push or pile snow around or against any shrubs or landscaping on the property, nor against the walls of the buildings and/or fences, without the permission of the Departmental Representative. If requested, removal of snow from the site shall be on completion of each plowing operation to ensure that there is no obstruction to vehicle traffic, parking spaces, personnel, or equipment movement. When requested, all snow shall be trucked away and moved to an approved location. The contractor must obtain approval from the local municipality as to the location for the excess snow. At the request of the Department Representative, it is anticipated that the snowbank is to be cleared within 3 calendar days after each snow event has ended. All parking and walkway areas are to be kept ice free at all times for the duration of this contract. Where immediate application of de-icing material is not practical due to continued snowfall, all areas are to be maintained in a reasonably safe condition until snow-clearing operations allow for the application of sufficient de-icing material to make vehicular and foot traffic safe and free of ice.

More opportunities from Government of Canada → Department of Fisheries and Oceans

Same awarding agency

NAICS: 541380
International
Moisture Content & Physical Characterization of SedimentThe contract seeks to determine moisture content and physical properties of wet marine sediment samples to support quality assurance and quality control processes, as well as to enable data normalization for subsequent chemical analyses. This work is critical for ensuring the accuracy and reliability of environmental data collected from marine sediments, particularly in the context of regulatory or scientific monitoring activities. The services required involve precise laboratory-based characterization of sediment samples, including but not limited to water content, density, grain size distribution, and other relevant physical parameters essential for standardizing chemical results across varying sample conditions. The contract is classified as a subcontract under NAICS code 541380, indicating it pertains to scientific and technical consulting services. It is issued by the Department of Fisheries and Oceans, Government of Canada, with performance expected to occur within Canada. The solicitation was posted on August 7, 2026, and responses are due by September 2, 2026. While no specific set-aside provisions or point of contact are detailed, the work is intended to support federal environmental monitoring efforts, necessitating adherence to rigorous analytical standards and procedural consistency to ensure defensible data outcomes.
Testing Laboratories and Services

POSTED

18 days ago

DEADLINE

in 9 days
View Details