SoCal Gas Line 247 Replacement Segment 2

Forecast
23CDH-00003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SoCal Gas Line 247 Replacement Segment 2 project, identified as Case No. 23CDH-00003, involves the in-kind replacement of a 2,356-foot segment of a 16-inch diameter high-pressure natural gas transmission pipeline. Located in the Gaviota Coast area of Santa Barbara County, south of El Capitan Canyon Resort and north of Highway 101, the project aims to upgrade the pipeline to a Class 3 safety rating without altering its existing capacity. The work is structured into three phases: the jack and boring of 176 feet of pipeline under El Capitan Canyon Creek, the installation of an 8-inch temporary bypass line and 2,180 feet of replacement pipeline including up to 24 bell holes, and the final connection, hydrotesting, and removal of the bypass and 1,400 feet of existing pipeline via open trench. The project is anticipated to take approximately 16 weeks, with potential for extended night and weekend work during the hydrotest and tie-in phases. Total excavation is estimated at 6,000 cubic yards, and the total area of disturbance is approximately 5.50 acres. Environmental protections are central to the project, including the avoidance of work within jurisdictional wetlands and Environmental Sensitive Habitats, the 3:1 replacement of encroached coast live oak trees, and the restoration of native vegetation per a Habitat Restoration Plan. The project has been approved by the County Zoning Administrator of Santa Barbara County following a Negative Declaration under CEQA, with specific mitigation measures and a monitoring plan adopted as conditions for approval.

General Info

Replace 2,356-foot gas pipeline segment with Class 3 safety rating, using directional drilling and bypass, with environmental mitigation and revegetation.

Agency

California → Santa Barbara County

Place of Performance

Calle Real and El Capitan Terrace Lane, CA, 93117

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara County
Contacts2 people available
OfficeN/A

Full Description

Show more
The request is for a Coastal Development Permit with Hearing (Case No. 23CDH-00003) to allow for the in-kind replacement of a 2,356-foot segment of an existing 16-inch diameter high-pressure natural gas transmission pipeline (Line 247) located south of El Capitan Canyon Resort and north of Highway 101, at El Capitan in the Gaviota Coast area. Line 247 is a steel 16-inch diameter pipeline that transports natural gas under high pressure. The replacement pipeline will maintain the same 16-inch diameter. The Project will not result in any changes to Line 247’s capacity but will upgrade the line to a Class 3 safety rating. The project will include three phases: Phase 1. Jack and bore 176-feet of replacement pipeline under El Capitan Canyon Creek to avoid construction work within the creek. Phase 2. Install an 8-inch temporary bypass line located on the eastern side of the line, running approximately 56 linear feet along the existing line. Install 80-feet of replacement pipeline between the western tie-in and the bore entry hold, and 2,100-feet of replacement line between the receiving pit and the eastern tie-in. Up to 24 bell holes may be required to weld the replacement line in place. Exact locations would be confirmed in the field. All stopples are existing, except for the eastern tie-in stopples, which will be installed during Segment 2 work to allow for tie-in of new line segment. Phase 3. Connect the replacement line to the existing line at the eastern tie-in. Hydrotest the replacement line and allow for continued operation of the Line 247. The 8-inch temporary bypass line will be removed. The 256-foot section of the existing pipeline running underneath El Capitan Creek, between the bore receiving pit and the western tie-in will be, capped, cleaned, filled with slurry, and abandoned in place. The 1,400-foot section of the existing pipeline east of the bore receiving pit will be removed via open trench [1,400-cy removal trench]. Following installation of the replacement pipeline and removal of the pipeline, the trench will be backfilled with native rocks and recompacted with native soil. No work will occur within jurisdictional wetland/waters. El Capitan Canyon Resort entrance existing landscaping will be replaced after construction. Total area of disturbance proposed is approximately 5.50-acres, including 0.42-acres of native vegetation and 1.35 acres of non-native vegetation. The total excavation will be approximately 6,000 cy, including: • Two replacement trenches, one 80’Lx3’Wx6’D connecting to the western tie in, and one 2,100’Lx3’Wx6’D between the receiving pit and eastern tie in, 1,453 cy; • A removal trench (2100’Lx3’Wx6’D) between the receiving pit and eastern tie in, 1,400 cy; • The bore pit (40’Lx15’Wx23’D), 512 cy; • The receiving pit (15’Lx10’Wx38’D), 212 cy; • Up to 24 Bell Holes (10’Lx6’Wx9’D), 320 cy beyond that of the replacement trench; • The eastern tie in of the replacement line (60’Lx20’Wx6’D), 267 cy; • The western tie in (60’Lx20’Wx20’D), 889 cy; and • The eastern tie-in bypass, 47 cy. Excavated soils will be balanced onsite. The temporary workspace along the pipeline corridor will be 80’ wide for the entirety of the pipeline besides the El Capitan Resort entrance road which will decrease to 20’ wide. Staging Areas/laydown yards will be located at either end of the 2,356-foot segment. The project will encroach into the canopies of two coast live oak trees, which will require onsite replacement plantings at a 3:1 ratio using 15-gallon trees or greater. No work or staging will occur within El Capitan Creek designated Environmental Sensitive Habitat (ESH). All disturbed areas are proposed to be regraded and revegetated after construction activities have been completed, and native vegetation restored per the Habitat Restoration Plan. The replacement of the pipeline segment is anticipated to take approximately 16 weeks. Extended night and weekend work with lighting may be required up to three days for the hydrotest and tie-in.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a Firm Fixed Price design-build project for fueling system repairs at the W.H. Ford Regional Training Center in Greenville, Kentucky. The scope of work involves comprehensive electrical and civil upgrades, including upgrading tank automatic tank gauges, repairing dispenser and offload island concrete, installing emergency fuel shut-off systems, and mounting leak detector probes. Additional requirements include providing concrete and asphalt circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing tank vents and roof penetration boot seals, and implementing dead man controls for truck loading. The project also entails repairing tank grounding, providing grounding for tank stairs, and modifying tank access platforms. The period of performance is 410 calendar days, with work commencing within 10 days of the Notice to Proceed and a final delivery date of June 18, 2027. Proposals are evaluated using the Lowest Price Technically Acceptable (LPTA) method, focusing on relevant experience, a logical Gantt chart schedule, and a well-defined construction methodology. Submissions must be divided into a technical volume and a price volume. The project must adhere to strict standards, including the Davis-Bacon Act for labor, Buy American requirements, and various NFPA, ASTM, and UFC specifications. Quality control will be managed through a three-phase process, and the contractor is required to maintain a quality control system compliant with FAR 52.246-12.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a design-build, firm-fixed-price contract for fueling system repairs at the W.H. Ford Regional Training Center in Kentucky, managed by the US Army Corps of Engineers, Omaha District. This project is a total set-aside restricted to 100% small businesses under NAICS code 237120. The scope of work involves comprehensive upgrades to two 10,000-gallon above-ground storage tanks, including the installation of an emergency fuel shutoff station, leak detection equipment, and an upgraded automatic tank gauging system. Additional requirements include repairing concrete and pavement, recoating fuel system canopies and piping, replacing tank vents, and improving grounding systems and equipment access platforms. All work must adhere to EM 385-1-1 safety standards, as well as IBC, NFPA, and ADA accessibility guidelines. Proposals must be submitted electronically in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the project schedule, and a technical approach, and a separate pricing volume. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process to award the contract. The proposal submission deadline has been extended to December 21, 2026, at 14:00 CST. Once awarded, the contractor must commence work within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027. Compliance with the Davis-Bacon Act and Buy American requirements is mandatory.
W071 Endist Omaha

POSTED

about 24 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
Z1DA--NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American Lake
Solicitation # 36C26027R0029
The Department of Veterans Affairs, VA Puget Sound Health Care System, is soliciting proposals for the installation and commissioning of Under Dispenser Containment (UDC) and a containment sump at the American Lake Campus in Tacoma, Washington. The scope of work includes installing new UDCs and a containment sump, replacing and commissioning Dispenser No. 1, reinstalling other existing dispensers, and installing new piping between extractor valves and UDCs. The contractor is also responsible for verifying and repairing existing fuel lines from tanks to dispensers. All regulated piping tightness testing must be performed or supervised by a provider holding ICC U3 certification and must comply with Washington State Department of Ecology requirements. This is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS 237120, with a small business size standard of $45.0 million in average annual receipts. Eligible offerors must be SBA-certified SDVOSBs with active SAM registration and must submit a bid bond with their proposal. The government will use a best-value tradeoff process to award a firm-fixed-price contract, evaluating proposals based on price, past performance, and technical capability, the latter of which includes personnel certifications, equipment sourcing, and a 90-day project schedule. The period of performance is 90 calendar days following the approval of the project schedule and receipt of deliverables. Proposals must be submitted via email to the contracting office by November 19, 2026, at 15:00 PST. Required submission documents include a signed SF 1442, a bid bond, a certificate of compliance for subcontracting limitations, and detailed technical certifications for proposed personnel. The project is subject to a three-phase quality control process and Davis-Bacon Act wage determinations for Pierce County.
260-NETWORK Contract Office 20 (36C260)

POSTED

about 24 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237120
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total small business set-aside. The scope of work involves comprehensive repairs to AVGAS fueling systems, including the installation of sampling gauge hatches, mechanical gauges, and an automatic tank gauge system. Key construction tasks include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additionally, the project requires the demolition and replacement of the POL operation building, relocation of a generator with a new concrete pad, repair of remote containment basin drainage, and various asphalt and concrete pavement replacements. The procurement utilizes the Lowest Price Technically Acceptable (LPTA) source selection method, evaluating proposals based on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed project schedule. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict regulatory standards, including UFC 3-460, OSHA, EPA, and DOT requirements. Deliverables include design documents in English units, as-built drawings, and a multi-stage inspection process consisting of punch-out, pre-final, and final acceptance inspections. Performance and payment bonds are required within 10 days of award.
W071 Endist Omaha

POSTED

11 days ago

DEADLINE

in 17 days
View Details
NAICS: 237120
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project, solicitation BPM059366, involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Gunpowder Falls State Park Hammerman Area in Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. Key deliverables include the installation of new storage tanks, concrete pads, and side-mount dispensers, as well as the provision of temporary gasoline and diesel tanks with metered dispensers for the duration of the project. All work must adhere to strict safety and environmental standards, including NFPA 30, 30A, and 78, API standards 650 and 620, and Maryland Department of the Environment regulations, with backfill compacted to a minimum of 95 percent. The contract is a Small Business Reserve Procurement, limiting the award to certified small businesses. The basis of award is the lowest responsive and responsible total bid. Procurement goals include a 15.00% MBE and 2.0% VSBE participation rate, with liquidated damages applicable for failure to comply with MBE requirements. The state reserves the right to apply reciprocal preference for resident bidders. Final acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, requiring the submission of an approved electrical inspection certificate, a disposal manifest for contaminated soils and equipment, and three sets of manufacturer manuals and as-built drawings. Invoices are to be submitted to the Maryland Department of Natural Resources in Annapolis, with payments typically issued within 30 days of receipt of a proper invoice.

POSTED

12 days ago

DEADLINE

in 28 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS