Soil-Cement and Aggregate Base Stabilization
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the installation of a 12-inch soil-cement stabilization layer and a 6-inch graded aggregate base course to form the foundation for a road project. This work is critical to ensuring long-term structural integrity, load-bearing capacity, and drainage performance of the road surface. The scope is focused exclusively on subsurface preparation, with no mention of asphalt paving, signage, or drainage structures beyond the base layers defined. The project is solicited as a subcontract under NAICS code 237310, indicating it falls under Highway, Street, and Bridge Construction. The solicitation was posted on July 7, 2026, with a deadline for responses set for August 6, 2026, at 7:00 PM. The contracting authority is the City of Hoschton, Georgia, and the work is expected to be performed within its jurisdiction, though the exact location is not specified. No set-aside preferences or small business designations are indicated, and the procurement is accessible to any qualified subcontractor meeting technical and compliance requirements. Details for point of contact or physical address are not provided, but further information can be accessed via the posted online link.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
