Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 18, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SOLAR PANEL

Closed
F2KBAD2130A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA9401 377 Msg PkView Agency

NAICS

221119 - Other Electric Power GenerationView NAICS

Place of Performance

Kirtland AFB, KIRTLAND AFB, NM, 87117, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9401 377 Msg Pk
Contacts2 people available
OfficeKIRTLAND AFB, NM, 87117-0001, USA
Organization / Agency
Department Of Defense → FA9401 377 Msg Pk
View Agency Profile
Office AddressKIRTLAND AFB, NM, 87117-0001, USA
Contacts
Bernadette N. KerkhoffContract Specialist
Carl LandreneauContracting Officer

Full Description

Show more
Solicitation was extended to close 23 August 2012.

More opportunities from Department Of Defense → FA9401 377 Msg Pk

Same awarding agency

NAICS: 337127
New
Federal
Workbenches
Solicitation # FA940126Q0116
Solicitation FA9401-26-Q-0116 is a firm fixed price request for quotation issued by the Department of the Air Force, 377th Air Base Wing, for the purchase, delivery, and installation of new, durable workbenches at Kirtland AFB, New Mexico. This procurement is mission-essential to replace legacy equipment suffering from structural fatigue and chemical degradation, ensuring personnel safety and compliance with technical order requirements. The requirement includes various configurations of manual and mobile workstations, specifically requiring solid core phenolic resin surfaces for chemical resistance and clementine orange finishes to align with ANSI/OSHA warning zone standards. The contractor must provide all necessary personnel, transportation, and tools, with a required delivery timeline of 60 days after the contract date. The government will award the contract to the responsible offeror whose proposal is most advantageous, utilizing a process that evaluates the lowest priced offer for technical acceptability first. Technical submissions and price quotes must be submitted as separate documents via email by August 31, 2026. Award criteria include technical acceptability and fair and reasonable pricing. The contractor is responsible for obtaining all necessary base access credentials and must coordinate delivery with the point of contact at least 72 hours in advance. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
Institutional Furniture Manufacturing

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Federal
SOR Waterline Repair
Solicitation # FA940126R0023
Solicitation FA940126R0023 is a firm-fixed-price request for proposal for the design and construction of a new 7,900 feet high-pressure waterline and associated systems on the southeast side of Kirtland Air Force Base, New Mexico. The project focuses on providing a reliable water supply from Pump Station 2 to the SOR and HERTF reservoirs, involving the installation of 8-inch Class 350 Ductile Iron Pipe, SCADA control system upgrades, and the abandonment of the existing line. Key infrastructure additions include a 15,000-gallon tank with booster pumps prior to Pump Station 2, a 5,000-gallon tank and pre-packaged pump station at the SOR site, and a portable hoist for pump and motor maintenance. This opportunity is a total set-aside for small businesses, with a response deadline of September 17, 2026. Evaluation will be based on a best-value or lowest-priced technically acceptable basis, considering technical approach, past performance, and price. A site visit is scheduled for September 3, 2026, and interested parties must submit attendee details by August 28, 2026. Contractors requiring access to controlled unclassified information must submit DD Form 2345 via the Joint Certification Program. The work must comply with specific Kirtland AFB electrical requirements, Davis-Bacon wage determinations for Bernalillo County, and various UFC and AWWA standards.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 20 days
View Details