Soldier Pile & Retaining Wall Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of primary soldier-pile and secondary retaining walls for bank stabilization projects managed by the US Army Corps of Engineers in Selma. The scope of work requires the installation of 1,000 linear feet of soldier piles to 100-ft NAVD88 and secondary walls to 110-ft NAVD88, utilizing specialized equipment such as drilling rigs and pile drivers. To ensure the preservation of nearby historic structures, the contractor must implement strict vibration monitoring throughout the construction process. The final deliverables consist of the fully installed soldier-pile and secondary retaining wall systems.

General Info

Install soldier-pile and secondary retaining walls for US Army Corps bank stabilization in Selma.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Selma, AL, USA

Set-Aside

NONE

Documents

This scope was carved out of W9127827RA009.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Industry Day - Selma AL Flood Management Risk and Bank

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Corps Of Engineers
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs primary soldier-pile and secondary retaining walls for prime contractors on US Army Corps of Engineers (USACE) bank stabilization projects. Installs 1,000 linear feet of soldier piles to 100-ft NAVD88 and secondary walls to 110-ft NAVD88 using pile drivers and drilling rigs. Implements vibration monitoring to protect historic structures. Delivers installed soldier-pile and secondary retaining walls.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Alligator Creek Weir Structure Repairs
Solicitation # FWC 26/27-33C
The Florida Fish and Wildlife Conservation Commission is soliciting competitive lump sum bids for the concrete rehabilitation of a 70-year-old water control weir structure located at the north prong of Alligator Creek in the Babcock Webb WMA. The scope of work includes spall repairs, crack repairs of various sizes, and the repair of a significantly eroding cold joint, all performed in accordance with construction plans by GM Hill Engineering and Chapter 255 of the Florida Statutes. The estimated budget for this project is 45,000 dollars. To be eligible, vendors must be registered in the MyFloridaMarketPlace and SunBiz systems. The contract will be awarded to the responsive and responsible bidder who submits the lowest valid bid. Bidders must demonstrate financial stability with liquid assets of at least 5 percent of the base bid and provide three verifiable references. Required submissions must be delivered in a sealed envelope to the commission office in Tallahassee by October 13, 2026, as digital submissions are not accepted. A mandatory pre-bid conference is scheduled for September 29, 2026. Performance is subject to strict timelines and bonding requirements, including 100 percent performance and labor and material payment bonds regardless of contract value. The Notice to Proceed is expected no earlier than February 2027 to align with the dry season, with substantial completion required within 30 calendar days and final completion within 10 days thereafter. Liquidated damages for delays in substantial completion are set at 100 dollars per calendar day. Additionally, the contractor must maintain general liability insurance of 1 million dollars per occurrence and 2 million dollars aggregate, with Longshoreman coverage required if in-water work is performed.
Florida Fish and Wildlife Conservation Commission

POSTED

about 8 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of Defense → US Army Corps Of Engineers

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS