Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

--Sole Source Contract - HLB Decisions

Active
USA-SNOTE-050706-002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

HLB Decisions developed a vessel trip cost (VTC) model for Lake Ontario and the St. Lawrence Seaway as part of a study conducted for the International Joint Commission under contract with Transport Canada and guided by a joint U.S.-Canadian Commercial Navigation Work Group. The U.S. Army Corps of Engineers is currently conducting a broader study covering the entire Great Lakes and St. Lawrence Seaway system, which is managed collaboratively by Transport Canada and the Detroit District, with participation from multiple other USACE districts. This larger study includes building a comprehensive system economic model that incorporates both the VTC module and a Lock Risk Module, the latter being developed by Oak Ridge National Laboratory. HLB Decisions possesses specialized knowledge of the computer code underlying their original VTC model, enabling them to extend it to cover the entire Great Lakes and St. Lawrence Seaway navigation system. Additionally, their expertise is essential to ensure proper integration between the VTC module and the Lock Risk Module. Consequently, the Detroit District’s Navigation Planning Center is seeking to award a sole source contract to HLB Decisions to modify and expand the VTC model accordingly, ensuring seamless connectivity with the Lock Risk Module to support the multi-agency U.S.-Canada study.

General Info

HLB Decisions to expand vessel trip cost model, integrating Lock Risk Module for Great Lakes study.

NAICS

541330 - Engineering Services

Place of Performance

MI

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Detroit
ContactsNo contacts available
OfficeDETROIT, MI, 48226-5000, USA
Office AddressDETROIT, MI, 48226-5000, USA
ContactsNo contact information available

Full Description

Show more
1. HLB Decisions built a vessel trip cost (VTC) model for Lake Ontario and the St. Lawrence Seaway as part of a study for the International Joint Commission. The work was completed under contract with Transport Canada and under the direction of a j oint U.S-Canadian Commercial Navigation Work Group (one of the co-leads being the Buffalo District). Currently, the Corps of Engineers is working on a complementary study that considers Lake Ontario, the St. Lawrence Seaway and lakes Erie, Huron, Michigan and Superior  the rest of the Great Lakes and St. Lawrence Seaway (GLSLS). This study is a multi-agency, U.S-Canada study jointly managed by Transport Canada and the Detroit District (CELRE). Other USACE districts (Huntington, Buffalo, Louisville, and New England) are participating in the study. 2. The GLSLS Economics team is building a system economic model that includes a VTC module and a Lock Risk Module. Though no VTC module for the entire GLSLS navigation system exists, HLB has, as stated above, developed such a model for Lake Ontario and t he St. Lawrence Seaway. The other necessary module, the Lock Risk Module, is being developed for the system economic model by Oak Ridge National Laboratory. This module needs to link to the VTC module. 3. HLB Decisions has unique knowledge of the computer code that will allow them to: 1) expand their existing VTC model to cover the entire GLSLS navigation system and 2) ensure that the Lock Risk Module links properly to the VTC module. The LRD Navigatio n Planning Center requests a sole source contract with HLB Decisions to make the necessary modifications to the VTC module so that it to covers the entire GLSLS and links properly with the Lock Risk Module.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle's Finance and Administrative Services (FAS) Capital Development division is seeking to establish on-call contracts with two qualified professional firms to provide structural and seismic/disaster engineering services. These consultants will provide technical expertise on an as-needed basis for small to medium projects across planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes performing structural engineering studies, seismic evaluations, confidence testing, and fall protection design, as well as preparing stamped construction documents, managing permitting, and providing construction administration and inspection for new and existing City facilities. The contract features an initial one-year term with options for four annual renewals, not to exceed a total duration of five years. To be eligible, firms must be licensed to practice in Washington State and the City of Seattle and demonstrate a track record of at least three relevant projects within the last seven years. Selection is based on a weighted evaluation of relevant technical experience (40%), approach and methodology (30%), an inclusion plan for women and minority firms (15%), and past performance (15%). All deliverables must adhere to specific FAS CAD standards and CSI MasterFormat specifications. Payment is processed within 30 calendar days of invoice receipt, with costs based on personnel salary rates and reimbursed direct non-salary expenses.
Finance and Administrative Services

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W072 Endist Detroit

Same awarding agency

NAICS: 237990
New
Federal
Duluth Vessel Yard Phase III Repairs
Solicitation # W911XK27BA001
Solicitation W911XK27BA001 is a firm-fixed-price construction contract issued by the U.S. Army Corps of Engineers, Detroit District, for Phase III repairs at the Duluth Vessel Yard Historic District. This project is a total small business set-aside and involves comprehensive infrastructure upgrades, including the installation of electrical distribution systems, exterior LED lighting, cast-in-place concrete work, structural metal fabrications, and automated access control barriers. Key deliverables include steel sheet pile encapsulation, bollard anchors, and reinforced concrete work. The project must commence within 10 calendar days of the notice to proceed, with a final completion deadline of August 15, 2028, assuming a notice to proceed date of January 12, 2027. To be eligible for award, bidders must demonstrate responsibility by submitting a preliminary work plan, a preliminary equipment plan detailing marine plant and piling systems, and evidence of prior project experience in marine piling. Mandatory requirements include a CMMC Level 1 self-assessment in the Supplier Performance Risk System and compliance with Davis-Bacon wage rates and Buy American standards. The contract specifies strict packaging and marking requirements for reinforcing bars and paints, and mandates the use of Appleton Powertite connectors for safety. Bids must be submitted via the PICE portal, and the successful offeror will be required to provide performance and payment bonds if the contract price exceeds 150,000 dollars.
Other Heavy and Civil Engineering Construction

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS