Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Solicitation 2026-001-045- New Construction in Various Counties

Active
Procurement #164740State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cherokee Nation Housing Authority is seeking qualified contractors for a turnkey residential construction project spanning five counties in Oklahoma—Adair, Cherokee, Craig, Nowata, and Sequoyah—with five distinct units to be built under Solicitation 2026-001-045, with bids due by July 31, 2026. Each unit is specified by location and design: two 4-bedroom gable-roof homes in Cherokee and Sequoyah Counties, one 4-bedroom gable-roof home in Adair County, one 3-bedroom shotgun-style home in Craig County, and one 3-bedroom gable-roof home in Nowata County. The work must be completed within 120 consecutive working days after issuance of the Notice to Proceed, encompassing all aspects from footing to finish, including labor, materials, permits, insurance, equipment, and supervision. The contractor is required to install a 14' x 25' concrete parking pad, shingles with a 30-year warranty and ridge vent, siding with house wrap on gables and soffits, and to submit all warranties, as-built drawings, an amended termite certificate, and master keys upon completion. All materials and finishes—including paint, brick, carpet, laminate flooring, and vinyl siding—must be pre-approved by HACN, with at least three physical samples submitted for each for acceptance. Performance is governed by strict compliance with local, state, and federal codes, with county inspectors having authority over HACN inspectors. Payment is structured in phases: 30% upon dry-in completion (windows, doors, roughed-in plumbing and electrical, and shingles installed with a debris-free site), and 40% upon full completion and acceptance. The contract mandates submission of weekly certified payrolls under Davis-Bacon wage rates applicable to the five counties, adherence to 29 CFR parts 1, 3, and 5, and maintenance of complete worker records including Social Security numbers. Contractors must provide a performance and payment bond equal to 100% of the contract value, secured by a U.S. Treasury-listed surety, as well as proof of General Liability, Auto, Workers Compensation, and Builders Risk insurance naming HACN as certificate holder. Indian preference applies to subcontracts under specified financial thresholds. All bids must conform to required HUD forms including the Certification of Eligibility under Davis-Bacon, Organizational Conflict of Interest, and other statutory representations,

General Info

Five turnkey homes in five Oklahoma counties, due July 31, 2026, with 120-day completion, bonds, insurance, and Davis-Bacon compliance required.

Agency

Cherokee Nation Housing AuthorityView Agency

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

OK, USA

Set-Aside

NONE

Documents

(17)

Oklahoma Residential Construction Wage Rates for Adair, Cherokee, Craig, Delaware, Mayes, Nowata, Ottawa, Washington Counties

PDFwage-determination

Site Directions for Contract 2026-001-045

PDFsite-directions

4 Bedroom Option Right Gable Roof Floor Plan - NC

PDFspecifications

HUD Representations and Certifications for Bidders

PDFrepresentations-certifications

RFB 2026-001-045 New Construction of Five Homes

PDFrfb

Wage Determination for Residential Construction in Sequoyah County, OK

PDFwage-determination

Wage Determination for Residential Construction in Oklahoma Counties

PDFwage-determination

Floor Plan - NC - 3 Bed Right Garage Gable

PDFfloor-plan

Cherokee County Site 2 Utility and Easement Survey

PDFsurvey

Solicitation 2026-001-045 New Construction Scope of Work

PDFsow

Plat of Survey for 623 E. Canadian Ave, Vinita, OK

PDFplat-of-survey

Site 5 Sequoyah County Utility and Site Preparation Details

PDFsite-preparation

Adair County Site 1 Survey and Utility Information

PDFsurvey

3 Bedroom Shotgun Style Floor Plan NC 1684 SQFT

PDFspecifications

Wage Determination for Residential Construction in Sequoyah County, OK

PDFwage-determination

RFB 2026-001-045 New Construction of Five Homes

PDFrfb

Nowata County Land Survey and Utility Information - Hobson 1 Acre Tract

PDFland-survey-utility-info

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCherokee Nation Housing Authority
Contacts1 person available
OfficeN/A
Organization / Agency
Cherokee Nation Housing Authority
View Agency Profile
Office AddressN/A

Full Description

Show more
The Housing Authority of the Cherokee Nation is seeking bids from qualified contractors for the

Similar Contracts

NAICS: 236115
New
SLED
Snow Minor Use Permit / Coastal Development Permit: N-DRC2023-00054Mark Snow has submitted a request for a Minor Use Permit and Coastal Development Permit to construct a 4,412 square-foot single-story single-family home on a 251-acre parcel at 887 Atascadero Road, adjacent to the Morro Bay city limit within the Coastal Zone of the Estero Planning Area. The property falls under the Agriculture land use category, and the development includes a 1,315 square-foot deck, a 1,384 square-foot attached garage, a new access driveway, a well, a water tank with associated waterline, and a septic system with leach fields. The project will disturb approximately 1.4 acres of land and involve the movement of 3,100 cubic yards of cut material, 2,500 cubic yards of fill material, and the export of 600 cubic yards of excess earth. All infrastructure is designed to support the residential structure while complying with coastal and environmental regulations. The permit application is under review by San Luis Obispo County, with Dane Mueller, Planner II, listed as the primary point of contact for regulatory inquiries, and Jerry Mark Snow representing the applicant through Snow Well Service. The request was posted on July 9, 2026, as a forecast notice, indicating it is anticipated but not yet finalized. The project’s location within the Coastal Zone triggers additional environmental review standards, and all proposed construction must align with the Coastal Act requirements. The address provided for performance is in Morro Bay, California, with a ZIP code of 93442, confirming jurisdictional oversight by local planning authorities under California’s coastal management program.
San Luis Obispo County

POSTED

1 day ago

DEADLINE

N/A
View Details
Solicitation 2026-001-045- New Construction in… | CLEATUS