This Solicitation opportunity from Department Of Transportation was posted on July 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solicitation - Complete Sanding Dust Extraction System - MMAC Oklahoma City, OK

Closed
6973GH-25-Q-00158-Complete_Sanding_Dust_Extraction_SystemFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333998
New
Federal
53--HOIST STRAP
Solicitation # N0010426QAB90
Solicitation N0010426QAB90 is a total small business set-aside, fixed-price request for quotations issued by NAVSUP Weapon Systems Support Mech for the manufacture of three Hoist Strap Assemblies (P/N: 5641754-303, NIIN: LWM046472). The contractor must ensure all materials are assembled in strict adherence to Drawing 5641754 Rev E and comply with MIL-STD-130 for marking and MIL-STD-973 for configuration control. Delivery is required within 90 days on an FOB Destination basis. Award will be granted to the responsible offeror providing the lowest priced, technically acceptable offer, with the government utilizing SPRS risk assessments to evaluate item, price, and supplier performance risks. The contract mandates Government Source Inspection per FAR 52.246-2, with inspection and acceptance occurring at the origin. Contractors are required to maintain all inspection records for the duration of the performance period and for 365 calendar days following final delivery. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129, with specific packing levels based on the shipment destination. Administrative requirements include electronic invoicing via the Wide Area Workflow system and compliance with DFARS 252.204-7012 regarding the safeguarding of covered defense information. All hazardous material submissions must include GHS-compliant labels and Safety Data Sheets sent to NAVSUP WSS Code N242.
Navsup Weapon Systems Support Mech

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 333998
New
Federal
16--BLADE,ROTARY RUDDER
Solicitation # SPRPA127QRA16
Solicitation SPRPA127QRA16 is a fixed-price request for the procurement of six rotary rudder blades (NSN 1615-01-708-2535) for the Department of Defense, managed by the Pa DLA Aviation office in Philadelphia. This procurement is designated as a Critical Safety Item (CSI) and requires the contractor to maintain a quality management system compliant with ISO 9000 or an equivalent standard. The delivery timeline is set for 365 days with shipping terms as FOB Destination. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price, with evaluations utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. The contract includes stringent packaging and marking requirements in accordance with MIL-STD-2073, MIL-STD-129, and MIL-STD-147, with specific mandates for Depot Level Repairable (DLR) labels and shelf-life certifications. Invoicing and payment must be processed electronically through the Wide Area WorkFlow (WAWF) system. Key regulatory compliance includes the Buy American Act, NIST SP 800-171 cybersecurity standards, and specific hazardous material identification requirements. The solicitation is categorized under NAICS code 336413 with a small business size standard of 1250 employees. Proposals must be submitted electronically to the designated point of contact, Aisha Varnadore.
Pa DLA Aviation At Philadelphia

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract requires the provision, delivery, and installation of a new, unused centralized dust extraction system at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma, specifically within the Paint Shop in Building 2 of the Logistics Support Facility. The system must be capable of supporting eight workstations—four in a sanding booth classified as a Class II Div I hazardous environment and four in an adjacent blasting room designated as Class II Div II with Group E hazards—each equipped with appropriate rated components. The design emphasizes safety, environmental compliance, and operational efficiency, including features such as HEPA filtration, cyclone separators, quick-connect fittings, and ductwork designed to minimize pressure loss. The system must meet specific performance criteria, including maintaining vacuum pressure of at least 7 inches water column and airflow of 400 CFM at multiple tool interfaces simultaneously, while also providing comprehensive health monitoring and diagnostics aligned with ISO standards. The contractor is responsible for detailed planning, including submitting an installation plan within 15 days of contract award, and completing installation within 16 weeks of plan approval. The contract mandates thorough documentation, training for operators, and adherence to safety, environmental, and quality standards, including OSHA and federal regulations. The system must be constructed from new, corrosion-resistant parts, with provisions for maintenance, repair, and interchangeability of parts, and must comply with restrictions on hazardous materials such as mercury, asbestos, PCB, lithium, and ozone-depleting chemicals. Additionally, the contractor shall coordinate installation to minimize disruption to ongoing operations, provide a field service engineer during critical phases, and ensure secure handling of government property and deliveries within a secured facility. The government will furnish utilities, security, and some support services, while the contractor is responsible for all aspects of chemical handling, safety enforcement, and site housekeeping throughout the project duration.

General Info

Provide and install a certified dust extraction system for hazardous paint shop environments with safety compliance.

NAICS

333998 - All Other Miscellaneous General Purpose Machinery Manufacturing

Place of Performance

Oklahoma City, OK, 73169, USA

Set-Aside

SBA

Documents

2

Dust Extraction Project Drawings

PDF, High priority: read this firstspecifications
High

RFQ 6973GH-25-Q-00158: Sanding Dust Extraction System

PDF, High priority: read this first29 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
Contacts1 person available
OfficeOKLAHOMA CITY, OK, 73125, USA
Office AddressOKLAHOMA CITY, OK, 73125, USA
Contacts

Full Description

Show more
Contractor shall provide one (1) centralized dust extraction system. The System shall be new and unused (not a prototype). The Machine shall be delivered and installed in the Paint Shop, Building 2, Logistics Support Facility (LSF), Mike Monroney Aeronautical Center (MMAC), Oklahoma City, Oklahoma. The centralized dust extraction system particulars are noted below: Hazarous Location Designations The sanding booth is considered a Class II Div I hazardous environment. All parts and equipment installed in the sanding booth shall be rated for such an environment. Any penetrations into the sanding booth shall be rated for such an environment. The blasting room is considered a Class II Div II environment containing Group E hazards. All parts and equipment installed in the blasting room shall be rated for such an environment. The blasting room is expected to house the main system vacuum pump, control, cyclone separator, and filter systems. General Design Characteristic Requirements: Eight (8) workstations shall be provided, four (4) in the sanding booth and four (4) in the adjacent blasting room NEMA-rated control panel with motor overload protection, system monitoring, and emergency stop HEPA filtration with pre-filter stage Auto-clean or pulse-jet HEPA filtration system Wheeled 55-gallon dust collection drum with level sensor and quick-release system System shall accept 3-phase power Ductwork shall be made from galvanized steel Ductwork shall be designed to minimize pressure loss and allow for easy cleanout All ducting shall use swept elbows All reducers shall be tapered Quick connect type fittings shall be incorporated at each tool interface Blast gates shall be incorporated for each tool interface Performance Requirements The system shall be capable of supplying vacuum pressure greater than or equal to 7 Water Column (WC) at an airflow greater than or equal to 400CFM, at the tool interface, to a minimum of six of the eight tool interfaces simultaneously. Equipment Health, Condition Monitoring, and Diagnostics: The Machine shall comply with ISO 17359 and ISO 55000 Series where applicable. The Machine shall meet, at a minimum, the following requirements: The Machine sensing and indication capabilities shall include but is not limited to operational status, fault and warning conditions, system monitoring alerts, maintenance reminders, and emergency stop activation. All hydraulic and/or lubricating oil circuits shall be filtered per ISO 4406, if applicable. Human Safety and Health: Covers, guards, pressure relief valves, emergency stop devices, and other safety devices shall be provided for all parts of the machine that present safety hazards. The safety devices shall not interfere with the operation of the machine. The safety devices shall prevent unintentional contact with the guarded part and shall be removable to facilitate inspection, maintenance, and repair of the parts. All machine parts, components, mechanisms, and assemblies furnished on the machine shall comply with all the applicable requirements of 29 CFR 1910 and ANSI B11 series regulations. Noise Levels: The noise level emitted by the equipment under load shall not exceed 80 dBA when measured at the operator's workstation or at any other point three (3) feet from any of the equipment associated with the System as measured on the - A weighted scale of a standard Type II sound level meter. Chemicals: The Contractor shall furnish to the Government POC a list of all chemicals used in conjunction with installation and maintenance of the equipment, and their Material Safety Data Sheets (MSDS) 90 days prior to delivery of equipment. If time frame specified does not match with expected delivery schedule, then the Contractor shall propose an alternate schedule that makes delivery of chemical information to the Government prior to installation with a minimum of 4 weeks for review of the data and comments by all interested Government parties. If necessary, the delivery of the equipment shall be delayed allowing for the chemical review and comment period. Additional delivery delays may be required if the Government requests alternative chemicals. The Contractor shall submit this proposed schedule at time of contract award for Government approval. The Contractor shall furnish all chemicals required for the installation and start-up of the Machine. The government reserves the right to reject use of any chemicals and request alternative(s) be proposed for completion of the installation. Proper use, storage and removal of any chemical required during commissioning of test stand shall be coordinated with the Environmental Coordinator (EC). EC info will be made available to Contractor by Government POC, as needed. Prohibited Materials: Mercury restriction: The machine shall contain neither mercury, mercury compounds, nor be exposed to free mercury during manufacture. Asbestos restriction: Asbestos and materials containing asbestos shall not be used on or in the machine. Polychlorinated Biphenyl (PCB) restriction: The use of polychlorinated biphenyl on or in the machine is prohibited. Lithium restriction: Lithium batteries used in the computer system are exempt from this requirement. Ozone Depleting Chemicals (ODC) Restrictions: Class I ozone depleting substances in accordance with section 602(a) of the Clean Air Act Amendments 1990, 42 USC 7671a(a) as implemented by 40 CFR 82 Protection of Stratospheric Ozone, shall not be contained within, or used on this equipment. Environmental Protection: Under the operating, service, transportation, and storage conditions described herein the machines shall not emit materials hazardous to the ecological system as prohibited by federal, state, or local statutes in effect at the point of installation. Construction: The System shall be constructed of parts that are new, without defects, commercial-off-the-shelf (COTS), and free of repairs. Metals shall be corrosion resistant materials unless suitably protected to resist corrosion. The machine construction shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to damage from environmental hazards shall be sealed or otherwise protected. The machine shall be capable of withstanding all forces encountered during operation of the machine at its maximum rating and capacity without distortion or failure. Welding, plugging, or filling with solder or paste shall not be employed as repair or reclamation measures for defective parts. All screws, pins, bolts, and similar parts shall be installed with means of preventing loss of tightness. All parts subject to removal or adjustment, shall not be swaged, peened, staked, or otherwise permanently deformed. Castings and Forgings: All castings and forging shall be free from defects, scale, or mismatching. Processes such as welding, peening, plugging, or filling with solder or paste shall not be used on casting and forgings for reclaiming any parts of the machine. Such processes may only be used for enhancing surface finish and appearance. Welding, brazing and soldering: Welding, brazing or soldering shall be employed only where those operations are included in fabrication of the original design. These operations shall not be employed as repair or reclamation measures for defective parts. Any excess material used for such operations shall be thoroughly removed from the part(s) upon completion of the operations. Weldments shall comply with AWS D14.4. Surface Finish: All surfaces of castings, forgings, molded parts, stampings, and welded parts shall be clean and free from sand, dirt film, sprues, flash, scale flux and other harmful or extraneous materials. External surface edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. Except as otherwise specified herein, the condition and finish of all surfaces shall be commensurate with the manufacturer's standard commercial practice. Gears: All gears and pinions, if applicable, shall be designed and manufactured of a suitable ferrous material with proper width and size to transmit full-rated torque and horsepower throughout the speed ranges without failure for the expected service life of the machine. Painting: Yellow or orange safety color-coding shall be used for designated physical hazards. Screw Threads: All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28 or FED-STD-H28/21B. Interchangeability: To provide for replacement of worn parts, all parts bearing the same part number shall be functionally interchangeable and dimensionally identical within the manufacturer's tolerance limits. Records, including detailed parts drawings, shall be maintained by the equipment supplier by part number throughout the life of the equipment so that any replacement part can be supplied to the customer. Maintainability: The System shall be designed and constructed to permit effective maintenance. The machines shall be equipped with access covers (if applicable) to facilitate inspection, cleaning, repair, and replacement of parts. Lubrication: Means shall be provided to ensure adequate automatic lubrication for all moving parts. Recirculating systems shall include filters which are cleanable or replaceable. Each lubricant reservoir shall have visible or mechanical means for determining fluid level. All oil holes, grease fittings and filler caps shall be accessible. Parts consuming fluids shall be clearly identified as such along with the recommended periods of additions and the type of fluid that should be used. Installation Installation Plan: Contractor shall provide an installation plan No Later Than (NLT) 15 days After Receipt of Order (ARO) to enable the government time. The Installation Plan shall include the following: Shop drawings showing proposed ingress path and final installation layout Floor load distribution requirements Required utilities, i.e. electrical requirements, low or high pressure air, HVAC air, process water, etc. Software and network requirements Detailed plan of events from delivery, installation, final system checkout, to startup Any staging area or storage area requirements Installation: The contractor shall deliver and install the System NLT 16 weeks after approval of installation plan. Technical Data Manuals/Drawings: The technical data package shall include, at minimum, the following in hard copy or digitally on DVD: General Operation, where applicable Machine setup and installation Startup and shutdown procedures Safety guidelines Maintenance, where applicable Routine maintenance schedules and procedures Pump servicing Troubleshooting common issues Lockout/tagout procedures Material Safety Data Sheets Ingress Protection (IP) rating and environmental protection details Spare parts and consumables list Electrical and Plumbing schematics, where applicable Machine wiring diagrams Pneumatic and water flow schematics High pressure circuit layout Software User Guide, where applicable Training/Familiarization Training: Contractor shall provide a comprehensive training for up to five (5) machine operators. Training shall include the following: General familiarization Instruction and demonstration of machine operation Routine maintenance operations Any calibration requirements Special Provisions Facility: The Contractor shall install this equipment in an operational facility that is engaged in the maintenance, repair, overhaul, and fabrication of National Airspace System (NAS) assets. This shop is in operation 12 hours per day Monday through Friday and engages in overtime on the weekend on a occasional basis. Contractor shall be required to consult with Project Engineer and the GOVERNMENT POC to develop a timeline that accommodates the continued performance of user's mission function during the installation. Contractor shall be responsible for cordoning off work areas. Field Service Engineer: As a part of the contract, the Contractor shall provide a field service engineer for technical direction and coordination during receipt, installation, startup, and checkout of the machine at the MMAC. Receipt and Acceptance: The Contractor shall be responsible for receipt and acceptance of the System shipments to the MMAC, both prior to and during installation. The Contractor shall direct the unloading, staging, and site location of the System shipments. The Contractor shall provide all forklifts, cranes, equipment operators, and rigging service necessary for the System unloading and site location. Secured Area(s): Project is located in a secured area. Contractor personnel will be issued site badges by the Security Office located on the Northwest side of the MMAC. Badge issuance process shall be coordinated by the GOVERNMENT POC. Badges (including temporary badges) shall be always displayed while on the MMAC. Equipment and large items shall be required to enter base through the Truck Gate located on the south side of MMAC. The Government reserves the right to inspect any and all deliveries being made to the base before entrance is permitted. Contractor Usage: Electrical outlets (120V/60Hz/15A) and compressed air (115 psig) for power tools will be available for use by the Contractor at the work site. The Contractor shall provide extension cords and compressed-air extension hoses to connect into the utilities for construction use. All work must be coordinated with Production Management, Josh Scantlin +1 (555) 000-0000, Alan Cain +1 (555) 000-0000 or John Teas +1 (555) 000-0000. Safety and Quality Control. Contractor is responsible for ensuring and enforcing industry safety practices, and quality control of the job site. Contractor shall comply with all safety practices posted in the assigned work area and Personal Protection Equipment (PPE) requirements. PPE shall include, but is not limited to, safety glasses and hearing protection. Contractor and his/her representatives shall have appropriate environmental and safety training required by the state and federal government according to Resource Conservation Recovery Act (RCRA). The Contractor is advised that electric service is in the work area. Fall protection, PPE, and any other safety related material needed shall be provided by the Contractor for contract employees. All safety signage in the work area and OSHA regulations shall be strictly followed by the Contractor. The Contractor's onsite supervision shall be responsible for ensuring personnel related to this project observe and follow the safety guidelines and properly wear the correct PPE. Housekeeping: Contractor shall keep the work areas clean and neat in accordance with Industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this SOW. Cleanup at the end of each day is required. All tools shall be properly stored in a lockable toolbox and trash removed. All hardware shall be properly stored in appropriate containers and the work area left in orderly condition, no exceptions. Packing material, material remnants, rubbish and debris shall be removed from Government property daily, unless otherwise directed, to avoid accumulation at the work site. Materials that cannot be removed DAILY (NO EXCEPTIONS) shall be stored in areas within the staging/storage area outlined in the installation plan. Tool Control and Accountability: It is the responsibility of the contractor to maintain accountability and security of tools during installation. Field Verify: All plan information such as floor plan layouts with dimensions provided by the Government for existing and new equipment are based on available documentation. This information is to be considered approximate and shall be field verified by Contractor. Contractor shall field verify that sufficient space is provided for the equipment prior to beginning installation. Issues with available space versus space need for the installation and equipment shall immediately (within 1 clock hour) be brought to the attention of the project engineer and contracting officer. Proposal By Contractor: The information provided by the Government's SOW reflects a custom design. Contractor shall be responsible for providing to the Government (at proposal submittal) any sketches, drawings, verbiage or a combination of these items to provide an accurate picture of their proposed solution for design completion and installation. Proposal shall include, but not limited to: Scope of Supply and Deliverables: Overall System Design Equipment Details Software and Controls Installation and Setup Documentation and Training Warranty and support Technical Compliance and Performance Guarantees Project Timeline and Delivery Schedule in Gantt Chart format Cost Proposal and Terms Detailed Pricing Breakdown Base system cost Installation and commissioning Accessories Training References and Past Performance Terms and Conditions Government Furnished Property: In accordance with (IAW) Government procedures, the Contractor is authorized to share Property of the Government, without cost, with Government personnel at MMAC for the duration of this contract and only as needed for performance of this contract. The Government retains title to all Shared Property of the Government, until the Government properly disposes of this property as authorized by law and regulation. The Government will maintain accountability (property records) for Government reporting requirements. The Contractor shall ensure this property is secured at the close of each workday. This Shared Property of the Government is not considered Government Furnished Property (GFP) requiring property administration IAW FAR Parts 45 and 52.245 plus supplements. However, this Shared Property of the Government will be administered IAW the provisions of this PWS and FAR 52.237-2, Protection of Government Buildings, Equipment, And Vegetation. The Contractor shall comply with the contract terms and conditions and this SOW. Government Furnished Services (GFS) Government furnished services are applicable during the performance of this contract. The Government will furnish the following services at the MMAC: Security Forces. The Government will provide general on-base security forces service. The security forces telephone numbers are +1 (555) 000-0000 for emergencies and +1 (555) 000-0000 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on the Mike Monroney Aeronautical Center in order to be connected with the on-base 911 center. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor's responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs. Refuse Collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract(s) for the Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use Government dumpsters to dispose of construction debris. Government Furnished Drawings All work plan drawings prepared by the Government for this project are available in electronic format (Autocad 2015 or newer, .dwg) from the GOVERNMENT POC.

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

NAICS: 541511
New
Federal
FOMS SOFTWARE DEVELOPMENT
Solicitation # 6973GH-27-R-FOMSSOFTWAREDEVELOPMENT
The Federal Aviation Administration (FAA) is seeking a single vendor to provide comprehensive agile software engineering, application modernization, maintenance, and system information security support for the Flight Operations Management System (FOMS). The scope of work covers two primary components: a native iOS mobile application for iPad devices to support flight crew productivity and a Java enterprise web application suite for managing flight scheduling, planning, dispatch, and various tracking and billing functions. The anticipated contract structure includes a one-year base period with up to four one-year option periods, with performance occurring onsite at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. Technical requirements emphasize expertise in native iOS development, Java enterprise web applications, and API integration with external operational systems. Vendors must demonstrate the ability to support federal cybersecurity Authority to Operate (ATO) processes in accordance with NIST 800-53 Rev 5 and agency-specific security baselines. Additionally, personnel must meet DOT Order 1600.1F security requirements and be clearable for FAA Personal Identity Verification (PIV) badging. This sources-sought notice falls under NAICS 541511 and requires interested parties to submit an expression of interest by November 6, 2026, detailing their business size, socio-economic status, and relevant past performance from the last five years.
Custom Computer Programming Services

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 611519
New
Federal
INVESTIGATIVE INTERVIEWING TRAINING COURSE
Solicitation # 6973GH-26-R-00229
The Federal Aviation Administration is soliciting a requirements contract for an Investigative Interviewing training course designed for Airworthiness Inspectors and Engineers. The program focuses on the P.E.A.C.E. Model (Plan and Preparation, Engage and Explain, Account, Clarification and Challenge, Closure and Evaluation) to provide employees with ethical, non-coercive, and outcome-based interviewing tools. This training supports critical functions including Aviation Safety Hotline, Whistleblower, and Suspected Unapproved Parts investigations, as well as various quality system audits and enforcement investigations. The contract structure consists of a base year running from November 1, 2026, to October 31, 2027, with four subsequent option years extending through October 31, 2031. The government estimates a requirement of five classes per year, with each class limited to a maximum of 20 students and lasting approximately 40 hours. Training must be delivered via instructor-led sessions at a U.S.-based brick-and-mortar facility. The selected contractor is responsible for providing all course materials, including syllabi and reference books, and issuing PDF certificates of completion to attendees. Award will be made to a single offeror based on the Lowest Priced Technically Acceptable (LPTA) process, evaluating the training syllabus, facilities, and proposed schedule. Proposals must be submitted electronically and include separate volumes for technical factors and pricing. The contractor must adhere to strict security protocols regarding the protection of non-public and controlled unclassified information, and the training content must comply with the Consolidated Appropriations Act, ensuring it remains professional and free from religious or offensive material.
Other Technical and Trade Schools

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 237110
Federal
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
Solicitation # 6973GH-27-R-00005
The Federal Aviation Administration is soliciting proposals for the Industrial Wastewater Treatment Plant (IWTP) and Collection System Upgrade at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. This total small business set-aside project, identified by solicitation number 6973GH-27-R-00005, has an estimated price range between $10,000,000 and $20,000,000. The primary scope of work involves the construction of a new IWTP building and processing equipment, with optional bids for the demolition of existing facilities and lift stations. The project must be completed within 730 calendar days from the notice to proceed, with performance beginning within 10 calendar days of that notice. Award will be determined using the Lowest Price, Technically Acceptable (LPTA) method. To be considered, offerors must attend a mandatory pre-proposal conference and site visit held on November 2, 2026. Technical acceptability is based on five factors: experience with multi-discipline construction projects over $5 million, satisfactory past performance ratings, qualified key personnel including a superintendent with seven years of experience, specific manufacturer and installer qualifications for wastewater equipment, and subcontractor experience in wastewater projects. Proposals are due by November 19, 2026, and must be submitted in two separate volumes covering contract documentation/pricing and technical factors. The contract is subject to the Davis-Bacon Act for prevailing wages and incorporates several Buy American Act clauses regarding construction materials and steel. Required security measures include the potential for employees to sign Non-Disclosure Agreements. Contractors must provide 100 percent performance and payment bonds and utilize the Delphi eInvoicing web-portal for all payment requests. Technical execution must adhere to strict industry standards, including ACI for concrete, AISC for structural steel, and ADA requirements for accessibility, while maintaining a comprehensive Environmental, Occupational Safety and Health Management System.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS