Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SOLICITATION: Construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA (LEV)

Closed
6973GH-26-R-00088Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 13 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Federal Aviation Administration is soliciting bids for the construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) facility in Leeville, Louisiana, to replace a structure destroyed by Hurricane Ida. This is a competitive, unrestricted, firm-fixed-price contract with a solicitation number of 6973GH-26-R-00088, and the government will award to the lowest-priced offeror found to be technically acceptable and responsible. The contract requires full compliance with FAA-specific contract clauses, including organizational conflicts of interest, cancellation and recovery of funds for improper activity, differing site conditions, material and workmanship standards, and contractor performance reporting. All proposals must be submitted via email by 4:00 PM Central Time on June 30, 2026, with the subject line “SIR Response: 6973GH-26-R-00088 LEV VORTAC.” The original deadline of May 19, 2026, was extended to June 30, 2026, with additional amendments incorporated, including updated clauses on small business subcontracting, changes to construction work, and DEI discrimination prohibitions per Executive Order 14398. Offerors must submit a completed SIR, a technical approach plan, an organizational experience questionnaire, a key personnel list, a safety and security plan, and fully executed SF-24, SF-25, and SF-25A bonds. Proposals must meet strict pass/fail technical criteria across all required elements; failure in any area results in disqualification. The contractor must furnish all labor, materials, equipment, and supervision to construct the facility in accordance with detailed drawings and specifications totaling over 1,100 pages, including adherence to FAA standards for stainless steel piping, insulation systems, and electrical labeling per NFPA 70. Site-specific requirements include a superintendent with 10 years of experience, a safety officer with OSHA 30 certification, and a quality control manager, all of whom must meet FAA suitability standards. All personnel must be U.S. citizens, undergo security background checks, and obtain FAA-issued badges for unescorted site access. The work must begin within 15 days of the Notice to Proceed and be completed by December 31, 2027. The FAA owns all data and records generated under the contract, with no reimbursement for proposal development costs

General Info

FAA seeks low-price, responsive bids for VORTAC building in Louisiana; strict compliance required.

Agency

Department Of Transportation → 6973GH Franchise Acquisition SvcsView Agency

Contract Value

$9,847,047

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Golden Meadow, LA, 70357, USA

Set-Aside

NONE

Awardee

DACO CONSTRUCTION COMPANY INCView Profile

Award Issued Date

Documents

(15)

Amendment 0002 to Solicitation 6973GH-26-R-00088

PDFamendment

11+LEV VOR Road Fiber Optic Conduit As-builts

PDFas-built

Bid Bond Form 7+SF-24

PDFbid-bond

Wage Determination LA20260040 Lafourche Parish LA

PDFwage-determination

Leeville VOR Facility Replacement Project Geotechnical Report Final 2.6.2025

PDFgeotechnical-report

LEV VORTAC Pre-Proposal RFIs

XLSXq-and-a

Solicitation 6973GH-26-R-00088 for LEV VORTAC Construction

PDFrfp

Standard Form 25A Payment Bond

PDFpayment-bond

LEV VORTAC Final Specifications Volume 1 of 1

PDFspecifications

LEV VORTAC Replacement Statement of Work

PDFsow

Performance Bond Form SF-25

PDFperformance-bond

Amendment 0001 to Solicitation 6973GH-26-R-00088

PDFamendment

LEV+VORTAC+%28Final%29+-+Drawings.pdf

PDF

RFI VOR 002 Pile Design Clarification

DOCXrfi

Offeror Organizational Experience Form

PDFofferor-experience-form

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
Contacts1 person available
OfficeOKLAHOMA CITY, OK, 73125, USA
Organization / Agency
Department Of Transportation → 6973GH Franchise Acquisition Svcs
View Agency Profile
Office AddressOKLAHOMA CITY, OK, 73125, USA
Contacts
Stephen Branch

Full Description

Show more

UPDATE 6/10/26


Answers to RFI 002 are attached. 


UPDATE 5  5/22/2026


Answers to all questions are attached in new RFI document and the road As-Builts are attached.


New Attachments:


10 LEV VORTAC -  Pre-Proposal RFIs


11 LEV VOR Road As-builts 6_17-25



All terms and conditions remain unchanged.


---------------------------------------------------------------------------------------------------------



UPDATE 4   5/14/2026


SIR EXTENDED TO 6/30/26



This SAM.gov post is updated to amend the SIR as follows:



FIRST: The SIR is extended to 6/30/2026.



SECOND: The following clauses are added and replace any previous clauses incorporated by the same number:


3.6.1-4 Small Business Subcontracting Plan (INTERIM April 2026)


3.10.1-15 Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026)



THIRD: The following attachments are added to the SIR:


7 SF-24_BidBond


8 SF-25_PerformanceBond


9 SF-25A_PaymentBond



Please utilize these documents for all bonding requirements.



FOURTH: Amendment document 6973GH-26-R-00088_Amd 0002.pdf is attached to this SAM.gov post.



FIFTH: All other terms and conditions remain unchanged.




At this time, answers to all questions are still being reviewed. This post will be updated with answers once the review is complete.


------------------------------------------------------------------------------------------------------


UPDATE 3   4/27/2026


This SAM.gov post is updated to amend the SIR as follows:



FIRST: The following clause is added:
3.6.2-50 Addressing DEI Discrimination by Federal Contractors (Executive Order 14398) (INTERIM April 2026)



SECOND: The following attachments are added to the SIR:
Offeror Organizational Experience Form.pdf
LEV VORTAC Geotechnical Report - Final 2.6.2025.pdf



THIRD: The amended SIR document 6973GH-26-R-00088_Amd 0001.pdf is attached to this SAM.gov post.



FOURTH: All other terms and conditions remain unchanged.



-------------------------------------------------------------------------------------------------


UPDATE 2   04/23/2026



The Geotechnical Report for this site has been attached. This report is for infomational purposes.


Attachment Added: LEV VORTAC Geotechnical Report - Final 2.6.2025.pdf



All Terms and Conditions remain unchanged.


-------------------------------------------------------------------------------------------



UPDATE 1   04/20/2026



Organizational Experience Questionnaire added as an attachment. Ommited from original post by mistake.



All terms and conditionas remain unchanged.



---------------------------------------------------------------------------


The Federal Aviation Administration (FAA) has a requirement to construct a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA (LEV) in accordance with the Statement of Work.



An award for this requirement is anticipated to be made to the offeror with the lowest priced quote received on or before May 19, 2026 that can be determined fully responsive and responsible.




SOLICITATION



This is a competitive solicitation for a FIRM FIXED PRICE (FFP) contract. As such, any proposals received that take exception to the terms and conditions in this solicitation, proposes additional terms or conditions, or otherwise indicates within their proposal that their proposed pricing is not all inclusive of the FFP proposed, cannot be evaluated at face value in a competitive environment and will, therefore, be determined ineligible for a contract award.



Any activities or costs associated with offerors proposal development and submission thereof is at the risk of the offeror and will not be reimbursed by the FAA.



This is competitive solicitation is unrestricted.




SITE VISIT



A site visit has been scheduled for May 5, 2026 at 1000 (10am) local time at the location below. Please contact the POC below by 5/4/26 if you wish to attend. Real ID is required for all attendees. This site visit is only to see the actual site and not for answering questions. If you have any questions regarding the Statement of Work or the solicitation, please direct them by email to Stephen.N.Branch@faa.gov.



Site Visit POC: Kenneth Daily


POC Telephone: 817-600-4897


POC Email: Kenneth.Daily@faa.gov


Location: LEV VORTAC Site


Site Coordinates: 29°10'30.8"N 90°06'14.5"W


Gate Coordinates: 29°10'55.4"N 90°06'03.1"W



QUESTIONS



All questions regarding the project/specifications/plans must be received in writing via email to Stephen.N.Branch@faa.gov no later than 10 days prior to solicitation closing date to allow for responses to be provided prior to due date for receipt of proposals. Please mark all emails with "Questions 6973GH-26-R-00088 LEV VORTAC" in the subject line.




INSTRUCTIONS



Full instructions for submitting an offer are found in Section L of the solicitation document.



Make sure to complete the following in accordance with the requirements in Section L:



(a) Completed SIR document



(b) Technical Approach Plan



(c) Completed Organizational Experience Questionnaire (OEQ) attached in Section



(d) Key Personnel List



(e) Safety and Security Plan



(f) Fully Executed SF-24 Bid Bond




EVALUATION FACTORS



Offerors must be determined responsive, responsible, and technically acceptable to be eligible for award. Evaluation factors and basis for award are found in Section M of the solicitation document.



AWARD DECISION



The FAA intends to award a contract to the lowest price offeror determined to be eligible for award.



The FAA reserves the right to cancel this requirement at any time and without notice.



OFFER DUE DATE



All responses to this solicitation for quotes must be received by email to Stephen.n.branch@faa.gov on or before May 19, 2026 at 1600 (4:00 PM) Central Time. Extensions to this due date are not likely to occur.  



Please include "SIR Response: 6973GH-26-R-00088 LEV VORTAC” within the subject line of your email.

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS