Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 8, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought: Bonneville Concrete Fish Ladder Rebuild

Closed
W9127N24SS0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 13 hours ago

DEADLINE

in 4 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

North Bonneville, WA, 98639, USA

Set-Aside

NONE

Documents

2

Bonneville Lock and Dam - Concrete Ladder 60% Specifications

PDF, High priority: read this firstspecifications
High

Bonneville Lock and Dam Washington Shore Fish Ladder 60% Plans

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts
Aragon Liebzeit
Clinton Jacobsen

Full Description

Show more
1. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations. The North American Industrial Classification Code (NAICS) for this requirement is: 237990; Other Heavy and Civil Engineering Construction. The related size standard is: $45M. Formal Sources Sought Response Due - 22 September 2023 at 3:00 pm PDT. 2. Project Background. Bonneville Lock and Dam, built and operated by the U.S. Army Corps of Engineers (USACE), was the first federal lock and dam on the Columbia and Snake rivers. The project's first powerhouse, spillway and original navigation lock were completed in 1938 to improve navigation on the Columbia River and provide hydropower to the Pacific Northwest. A second powerhouse was completed in 1981, and a larger navigation lock in 1993. Today, the project is a critical part of the water resource management system that provides flood risk management, power generation, water quality improvement, irrigation, fish and wildlife habitat and recreation along the Columbia River. Since the 1960's, there has been a steady decline of Pacific Lamprey (Entosphenus tridentatus) passing the dams on the Federal Columbia River Power System. Scientists have attributed the decline to several causes including pollution, habitat loss, irrigation, intentional removal, ocean conditions, and difficulty passing dams. The purpose of this project is to improve upstream passage success for Pacific Lampreys and reduce passage delay for adult salmonids. The work is being completed as a component of the preferred alternative identified in the Columbia River System Operations (CRSO) Environmental Impact Statement (EIS) and the 2020 Columbia Basin Fish Accords. The EIS specifies that the existing serpentine control section will be replaced with a vertical slot and orifice control section, similar to those in use at Ice Harbor and John Day dams. 3. Project Scope. The scope of this contract will replace the existing serpentine control section in the Washington shore fish ladder with a vertical slot and orifice control section. Seventeen of the eighteen existing concrete baffles will be demolished and replaced with nine baffle pairs, each with a vertical slot and two orifices; a large orifice to allow passage by salmon or lamprey and a small orifice that will only allow passage by lampreys. Lamprey refuge boxes will be provided approximately in line with the lamprey orifices. Passive Integrated Transponder (PIT) tag antennas (to be fabricated and delivered by others) will be installed in the slots and both orifices of four of the baffle pairs, along with associated power supplies and fiber-optic transceiver panels, and a connection to the fisheries lab. Access to the PIT tag antennas will be provided by a contractor-designed non-ferrous walkway over the baffles which does not interfere with PIT tag detection. a. The following information represents the project objectives: Working within a rigid in-water work window and firm deadline. Working in severe winter weather. Concrete demolition and installation. Electrical panel and conduit installation. Low voltage electrical wiring and fiber optic communications. Design, procure and install walkway. Modifying existing structures. b. Anticipated Construction Schedule: CENWP intends to advertise in July or August of 2024 and award a Construction Contract in September 2024 with required construction completion by February 2025. c. Estimated Construction Cost (ECC): The current magnitude of construction is between $1M and $5M. Reference FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude. d. Number and Type of Contracts: NWP contemplates awarding one firm-fixed-price construction contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels. e. Anticipated Source Selection Process: The expected method to determine the best value to the government is undecided at this time. 4. Project Specific Constraints and Challenges. a. All construction must be completed during the in-water work window from early December 2024 through February 2025. 5. Questions for Industry. Is there anything in our draft plans and specs that would discourage you from bidding? Is there anything in our draft plans and specs that would cause enhanced pricing uncertainty? Are there any market conditions or industry practices that you feel the government needs to be aware of? Would the Government decision to use best-value tradeoff increase or decrease your firm's interest in providing an offer once the solicitation is issued? Will your firm more likely bid this project if it is issued as an Invitation for Bids (IFB)? 6. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought W9127N24SS0003: Bonneville Concrete Fish Ladder Rebuild. Please email to Clinton M. Jacobsen, Contracting Officer, at contact@example.gov and Aragon Liebzeit, Contract Specialist, at contact@example.gov before 3:00 pm Pacific Daylight Time on 22 September 2023. Interested parties responses to this Sources Sought shall be limited to 6 pages and shall include the following information: Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB). An explanation of the prime firm's capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. A description of work performed under similar project constraints and challenges listed under paragraph 3. Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1), in-water work project(s) or project(s) with limited construction timeframes during winter. These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following: Project Title Contract Number Contract award date Customer name, phone number and email address Prime or Subcontractor Initial contract dollar value Final contract dollar value Initial contract completion date Final contract completion date Customer satisfaction The Government may verify information in CPARS or PPIRS. Firm's Joint Venture information if applicable - existing and potential. Firm's Bonding Capability in the form of a letter from Surety. Firm's interest and the likelihood in bidding/proposing on the solicitation when it is issued. (Refer to planned advertise and performance dates). Responses to the government's questions in paragraph 5 and any other information the contractor feels the government needs to be aware of. 7. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain active for the duration of the solicitation process to be eligible for award of a Government contract. 8. Attachments. Draft Plans and Specifications

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Solicitation # W9127N27BA007
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project, identified by solicitation number W9127N27BA007, has an estimated construction value between 25 million and 100 million dollars. The scope of work involves replacing primary chillers, installing four new chiller skid packages with 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system integrated with fire protection systems. The project requires extensive structural modifications, the installation of air-cooled and water-cooled systems, and the use of refrigerants that are not subject to future phase-out schedules. Construction is expected to take 1,004 calendar days following the Notice to Proceed and will occur within an active powerhouse containing high-voltage electrical equipment. Due to the nature of the work, contractors must adhere to strict safety protocols and may be required to perform asbestos abatement and lead mitigation. A critical requirement for award is CMMC Level 2 (Self) certification for the prime contractor and relevant subcontractors processing Controlled Unclassified Information. This is an unrestricted, full and open competition under NAICS code 238220, with a tentative solicitation issuance date of October 29, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Solicitation # W9127N27BA009
The U.S. Army Corps of Engineers Portland District is soliciting firm-fixed-price bids for the repair and rehabilitation of Tainter Valves TV3 and TV4 at the John Day Lock and Dam in Klickitat County, Washington. The project scope includes crack and weld repair, seal replacement, and the procurement of spare bushings, with an estimated construction magnitude between $1,000,000 and $5,000,000. The work is categorized under NAICS 237990 and is a full and open competition. Mandatory requirements include adherence to EM 385-1-1 safety standards, CMMC Level 1 certification, and the provision of performance and payment bonds. Bidders must also comply with the Davis-Bacon Act and Buy American requirements. The solicitation includes mandatory price items for mobilization and the removal, transport, and repair of TV3, with optional line items for the same services for TV4. Evaluation will include a 10 percent price preference for HUBZone small business concerns and a review of subcontracting plans to ensure goals for small businesses and HUBZone firms are met. Bids must be submitted in PDF format to the designated contracting personnel by 11:00 A.M. PDT on November 19, 2026. Site visits were scheduled for November 3, 2026, requiring attendees to be U.S. citizens with a REAL ID. Performance is expected to begin within 10 calendar days of award, with specific completion timelines of 143 to 233 calendar days depending on the line item.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS