Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for Fishtrap Lake Intake Structure and Dam Rehabilitation

Closed
W9123726X1BK8Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Huntington District, is conducting a Sources Sought notice to identify qualified firms capable of performing rehabilitation work on the Intake Structure and Dam at Fishtrap Lake in Shelbiana, Kentucky. This is not a solicitation but a market research effort to evaluate contractor capabilities for a future procurement under NAICS code 237990, with no set-aside status currently determined. The project entails furnishing all materials, labor, equipment, and supervision to complete base contract tasks that include removal and replacement of critical mechanical and electrical components such as the intake structure's air circulator, water pump, sluice gate level monitors, motor control center, wiring, electrical distribution systems, and installation of emergency stop wiring circuits. In addition, several options are outlined: Option 1 involves rehabilitation and fabrication of service gate cylinders; Option 2 covers comprehensive crane rehabilitation including replacement of motors, brakes, controls, and structural components; Option 3 addresses replacement of the elevator’s power and control systems; and Option 4 provides for full replacement of hydraulic cylinders instead of rehabilitation. Notably, Option 1 and Option 4 are mutually exclusive and Option 1 must be awarded with the base contract if selected. Interested contractors must submit a concise response by May 13, 2026, limited to 10 pages (or 20 pages front and back), including company identification, capability statements demonstrating relevant experience over the past ten years, professional qualifications with registered personnel details, bonding and insurance capacity, and verification of any applicable Small Business Administration certifications covering Small Disadvantaged Business, HUBZone, Woman-Owned, or Service-Disabled Veteran-Owned categories. Submissions are to be made electronically to the designated contract specialist and contracting officer. The solicitation number is W9123726X1BK8, and no pricing, contract value, performance period, or FAR clauses are currently defined, as this notice is strictly for capability assessment with no formal evaluation factors or basis of award specified. Work will be performed following applicable product and industry standards at the Shelbiana site, with government oversight for acceptance. The existing electrical infrastructure features a 12 KV open delta distribution line owned by Kentucky Power Company, requiring special consideration due to limited access for maintenance equipment. This notice ensures the Government gathers market information to inform acquisition strategy for critical rehabilitation of this civil infrastructure asset.

General Info

US Army seeks firms for Fishtrap Lake dam rehabilitation; requires qualifications, no pricing, options included.

Agency

Department Of Defense → W072 Endist HuntingtonView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Shelbiana, KY, 41562, USA

Set-Aside

NONE

Documents

(1)

Sources Sought for Intake Structure and Dam Rehabilitation at Fishtrap Lake

PDFsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts2 people available
OfficeHUNTINGTON, WV, 25701-5000, USA
Organization / Agency
Department Of Defense → W072 Endist Huntington
View Agency Profile
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more

Action Code: X



Date: 04/13/2026



Year: 2026



Contracting Office Zip Code: 25701-2070



Product or Service Code: Z1PZ



Contracting Office Address:



US Army Corps of Engineers, Huntington District


502 8th Street


Huntington, WV 25701-2070



Subject: D – SOURCES SOUGHT for Intake Structure and Dam Rehabilitation for Fishtrap Lake in Shelbiana, Kentucky.



Proposed Solicitation Number: W9123726X1BK8



Closing Response Date: 05/13/2026



Contact Points:



Lillie V. Bodie, Contract Specialist, lillie.v.bodie@usace.army.mil; (304) 399-5139


Danielle ‘Logan’ Roar, Contracting Officer, danielle.L.roar@usace.army.mil; (304) 399-5348



Contract Award Number: N/A



Contract Award Dollar Amount: N/A



Contract Line-Item Number: N/A



Contract Award Date: N/A



Contractor: N/A



This is a SOURCES SOUGHT notice to determine the capabilities of firms. This notice does not constitute a solicitation announcement, nor does it restrict the Government to an ultimate acquisition approach.  No solicitation or technical scope of services is available currently.  The Government will use the responses to this SOURCES SOUGHT notice to make acquisition decisions.  All businesses are strongly encouraged to review this SOURCES SOUGHT and submit according to the directions in this notice.



NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS are available for this notice.  Responses to this Sources Sought notice will be used by the Government to make appropriate acquisition decisions.


The purpose of this notice is to gain knowledge of potentially qualified large and small business sources to include small businesses in the following categories: Small Business, Small Disadvantaged Business, Certified HUBZone, Woman-Owned, and Service-Disabled Veteran-Owned.


Contractors shall demonstrate through professional registration, company, and personnel resumes, executed examples, and supporting customer feedback documentation, its ability to meet the requirements for work related to the Intake Structure and Dam Rehabilitation for Fishtrap Lake.



The general description of the work is to furnish all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to Fishtrap Lake, Intake Structure and Dam Rehab. Complete the work in accordance with appropriate product specifications, industry standards, and contract work order plans and specifications.


The current electrical commercial power source is a 12 KV distribution line owned by Kentucky Power Company (KPC). The existing line is located on the hillside and is not accessible by KPC boom trucks.


The existing line is an “open delta” configuration, meaning that there are only two phases present instead of the normal three phases. In the open delta configuration, the third phase is derived at the stepdown service transformers.



The contract includes the following work tasks:



Base


  1. Removal and replacement of the Intake Structure Air Circulator.
  2. Removal of the Intake Structure Water Pump.
  3. Installation of the roof damper motor.
  4. Removal and replacement of four sluice gate level monitors.
  5. Removal and replacement of new line shafts, line shaft couplings, bearings, and brake wheels and shoes.
  6. Removal and replacement of the Motor Control Center.
  7. Removal and replacement of wiring.
  8. Installation of an E-Stop circuit wiring for the hydraulic pumps.
  9. Removal and replacement of the electrical distribution equipment.


Option 1 (Cylinder Rehab)


Disassembly and removal of the three (3) service gate cylinders and one (1) low flow gate cylinder. One new service gate cylinder will be fabricated and installed in place of one of the existing service gate cylinders. The other two cylinders and the low flow cylinder will be rehabbed and reinstalled. If enacted, Option 1 must be awarded alongside the Base Contract. See Option 4 or work in lieu of this task.



Option 2 (Crane Rehab)


Removal and replacement of the existing motors, bearings, brakes, wiring, controls, rail clips, bumpers, wire rope, lubricants, grease fittings, couplings, hardware, festoon, lights, and limit switches.


Rebuilding of the hook block.


Cleaning and painting of the crane trolley, bridge, and runway.



Option 3 (Elevator Rehab)


Removal and replacement of all power and control systems for the existing elevator.



Option 4 (Hydraulic Cylinder Replacement)


Replacement of all three service gate cylinders in lieu of rehabilitation. This option will not be awarded in conjunction with but in lieu of Option 1.


The project work will be performed in accordance with direction included herein.



The submission is limited to 10 pages (20 total, 10 front and back), to include:



Contractor’s name, DUNS number, address, point of contact, phone number, and e-mail address.



Contractor's interest in proposing on a solicitation, if issued.



Contractor's capability to perform a contract of this complexity and examples of comparable work performed within the past 10 years based on the above criteria.  Describe any similar activities listed in this announcement that your company is unable to perform.



Describe the professional qualifications of your company.  Provide the number and qualifications of registered professional personnel and laborers that you intend to utilize for work on this project.



Describe your company's capacity to obtain any required bonding, such as proposal, payment, and performance and your company’s ability to meet insurance requirements.



  1. Verification of any Small Business Administration (SBA) certification(s), if applicable.


All interested contractors should provide a response by close of business, May 13, 2026.  Submit your response to Lillie V. Bodie via email at lillie.v.bodie@usace.army.mil and Danielle L. Roar via email at danielle.L.roar@usace.army.mil.  Electronic submission is required.


Place of Contract Performance: Shelbiana, Kentucky


Set Aside Status: Unknown at this time.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 236220
New
Federal
Tom Jenkins Office/Shelter roof replacement
Solicitation # W9123726QA090
Solicitation W9123726QA090 is a total small business set-aside for the removal and replacement of roofing systems at the Tom Jenkins Dam in Glouster, Ohio. The scope of work requires the installation of a new fully adhered white EPDM membrane roof for the office and a new architectural asphalt shingle roof with synthetic underlayment for the shelter. All work must be completed within 60 calendar days from the Notice to Proceed, with a performance period scheduled from September 21, 2026, to November 21, 2026. The project requires a minimum 20-year warranty on both roofs and strict adherence to EM 385-1-1 safety standards and Davis-Bacon wage determinations for Muskingum County. The contract is a firm-fixed-price arrangement with an estimated value between 100,000 and 250,000 dollars. Award will be granted to the lowest price offeror who meets all technical requirements and is deemed responsible. Key administrative updates via Amendment 0004 have removed the requirement for performance and payment bonds and modified applicable FAR clauses. All proposals must be submitted electronically through the PIEE Solicitation Module by September 15, 2026. The contractor is responsible for providing a site-specific Abbreviated Accident Prevention Plan and maintaining a quality control system to ensure all materials are new and installations are leak-free.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 332312
New
Federal
Miter Gate Rack Arm Fabrication for Captain Anthony Meldahl Lock and Dam
Solicitation # W9123726QA084
Solicitation W91237-26-Q-A084 is a request for a firm-fixed price supply contract issued by the U.S. Army Corps of Engineers, Huntington District, for the fabrication and delivery of one rack arm assembly for the Captain Anthony Meldahl Lock and Dam in Felicity, Ohio. The scope of work includes the fabrication of one rack, one rack support, and all associated appurtenances according to contract drawing 22/5. This is a supply-only procurement, meaning the contractor is responsible for fabrication, assembly, and testing, while the government will handle the final installation. The award will be based on the lowest price among offers that meet all technical requirements, and the project is designated as a total small business set-aside under NAICS code 332312. Key requirements include the submission of detailed shop drawings for approval and the implementation of a quality control system. Final shop assemblies must be witnessed by a government inspector, and the contractor must provide 14 days' notice prior to final testing. The delivery is required within 180 calendar days from the date of award, with terms set as FOB Destination. Packaging must adhere to strict standards for long-term storage, including the use of rust preventatives, weathertight wooden crates, and marking in accordance with MIL-STD-130 and MIL-STD-129. All responses must be submitted electronically via the PIEE Solicitation Module in a searchable PDF format.
Fabricated Structural Metal Manufacturing

POSTED

3 days ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
Bolivar Dam Gatehouse Roof Replacement
Solicitation # W9123726QA073
Solicitation W9123726QA073 is a sealed bid invitation for a total small business set-aside construction project to replace the roof membrane of the Intake Structure Building at Bolivar Dam in Bolivar, Ohio. The contractor is responsible for providing all personnel, equipment, transportation, and materials required to remove and dispose of the existing membrane, gravel, and reglet flashing, and install a new 3,060 square foot roofing system. Specifications require the use of Johns Manville 060 PVC single-ply white membrane or an equivalent, along with two layers of 2.6 inch polyisocyanurate insulation board. The project must be completed within 60 calendar days from the issuance of the Notice to Proceed, which is contingent upon the approval of bonding, insurance, security clearances, and an Accident Prevention Plan. The contract is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates and federal mandates for paid sick leave and minimum hourly wages. Safety compliance is mandatory according to OSHA 29 CFR 1910 and 1926, as well as the U.S. Army Corps of Engineers EM 385-1-1 manual. Administrative requirements include active registration in the System for Award Management and compliance with Buy American and cybersecurity standards, including CMMC level requirements. Proposals must be submitted through the PIEE Electronic Quote Submissions portal by the deadline of September 14, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS