Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Commerce was posted on August 18, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for furnish and install of equipment for transformers, switchgear, and network protectors Eaton Electric Powernet - System.

Closed
NB193000-11-02824Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for agency staff on inspection tools, and develop comprehensive standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel availability, fee structure, and a proven track record of performing similar projects for utilities or industrial facilities. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as non-collusion and workers compensation. The resulting contract will feature fixed pricing for an initial term with potential one-year extensions. Awardees must comply with California Labor Code prevailing wage requirements and maintain strict confidentiality regarding all agency reports and data.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including the cafeteria, recreation building, and dormitories. Key tasks include performing functional tests by simulating utility outages, replacing failed ballasts with LED-compatible versions, and applying durable labels to fixtures for future tracking. The contractor must ensure full compliance with NFPA 101 (2024 Edition) and NFPA 70 standards, integrate recurring maintenance into the center's Computerized Maintenance Management System, and provide certificates of disposal for hazardous materials. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must include a detailed cost breakout and a mandatory physical site visit. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This solicitation is set aside for small businesses and various SBA-certified categories. Award decisions will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act, Federal Contractor Minimum Wage, and FAR regulations regarding work hours, safety standards, and the Buy American Act.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month

General Info

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

National Institute of Standards and Technology(NIST), GAITHERSBURG, MD, 20899, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Holly B. KnottContract Specialist (Contractor)
Michael R. SzwedSupervisory Contract Specialist

Full Description

Show more
Sources Sought for furnish and install of equipment for transformers, switchgear, and network protectors Eaton Electric Powernet - System. The National Institute of Standards and Technology (NIST), Gaithersburg, MD, Campus, has a requirement for the above subject. This is not a Solicitation Announcement and is not a Request for Proposal and does not obligate the Government to any contract award. The purpose of this Sources Sought synopsis is to determine interest and capability of potential qualified firms relative to the North American Industry Classification Code (NAICS) 238210. Participation by small and socioeconomically disadvantaged business concerns is encouraged, as well as large businesses. To make an appropriate acquisition decision for the above project, the Government may use responses to this sources sought synopsis. Background: The electrical equipment at Building 245, Wing C needs to be replaced due to age. The power distribution was installed in 1954. The equipment has outlived its useful life, and furthermore it is prone to failing preventative maintenance. The work under this contract will replace and upgrade the service equipment with three (3) 500 kVA network transformers supporting a new 277/480 volt switchgear lineup configured as a ring-bus arrangement. The work will include extension of the existing 13.8 kV distribution system requiring work within existing manholes terminating the existing 15 kV PILC type cable. The PILC cable shall be transitioned to 15 kV EPR type cable for extension back to the new substation equipment. Historically, NIST has purchased similar electrical replacements where the GSA vendor, Eaton Corporation, provided the new electrical materials for the past eight to nine years via the GSA schedule. The most recent purchase was in FY 2008 for Building 231 replacement, which is extremely similar to the requirement in Building 245. It is currently NIST's intent to seek a Limited Source Justification to Eaton Corporation using GSA Schedule. Project information: Contractor shall provide equipment and installation to replace two existing spot network systems: 480v system and 208 systems with upgrade network system, with a limited number of outages during construction. A fully functional, operational and property commissioned system for this requirement shall be completed and in possession of the government within 52 weeks from Notice to Proceed (NTP). In addition, provide submittal register, safety plan, construction phasing plan, temporary powers, commissioning testing plan, shop drawings, and O&M manual. The fire wrapping on the 15 kV feeders may contain asbestos materials. Any required testing and/or necessary abatement shall be provided by NIST. The Contractor shall identify any suspicious materials which require testing to NIST at least 30 days prior to the scheduled work in that area. NIST will provide disposal of all liquid filled transformers. STATEMENT OF WORK Contractor shall provide the following for approval prior to commencement of work: 1) A safety plan. 2) The Government requires the contractor to have a current Experience Modification Rating (EMR) of less than one (1). A phasing construction plan with following constraints; 1) Limit to total 4 weekend outages maximum, including 2 zone outage which affects about 9 buildings, and two (2) Building 245, wing C (which affects wing C only). 2) All building outages shall begin at 6:00 pm on Friday and end at 6:00 am on the next business day. 3) One feeder (site wide) shall be down at a time. Equipment Contractor shall supply the equipment but not limited to the following: 1) Three (3) 13.8 kV fused load interrupting switches 2) Three (3) liquid filled network transformers with primary oil switches, each rated 13.8 kV : 480/277 volt, 500 KVA 3) Three (3) network protectors with draw-out breakers and three (3) associated disconnect links 4) A new indoor metal enclosed switchgear, 480-volt Magnum DS, forming a complete lineup. 5) Contractor shall also provide switchgear steel floor base at least 6" high. 6) The switchgear shall be equipped with three (3) IQ analyzers for incoming feeders and other monitoring meters. 7) A new 208V metal enclosed switchboard as part of a double ended unit substation. The switchboard is equipped with two (2) power monitoring meter IQ220 for incoming feeders. Contractor shall also provide switchgear steel floor base. 8) Two enclosed dry type transformers rated 300 KVA, 480-208/120V as parts of double ended unit substation. The transformer shall be copper winding, class H insulation. 9) A new low voltage busways, 3 runs from transformers to the switchgear, one run to complete ring bus, and one run from dry type transformer to 208V switchboard. The new busway shall be copper. 10) A new 480V panel board. 11) A new disconnect switch for breaker testing. Installation: The installation shall include all necessary labor, supervision, tools, equipment services, misc. material, and supplies as required to construct, erect, and install complete fully functional switchgear and unit substation as listed above. In addition, the work includes but is not limited to the following: 1) Provide Start up, Service, Field testing, and Project Management. 2) Provide demolition of existing equipment. The equipment shall be removed and disposed of, except for the following items that the government will salvage: - The Eaton Powernet - system and related components. - All existing Kirk Key Interlocks. - All Network Transformers (6 transformers). - All drawing out breakers. Contractor shall install all of the equipment. Contractor shall replace existing PILC cable with EPR medium voltage cable. Contractor shall provide equipment delivery, rigging and handling. Contractor shall also reconfigure the lighting, as well as re-rout existing conduit and cables to new equipment. Install with new conduits, wires, junction boxes, pull boxes, hangars, and fasteners as required. Re-rout any existing conduits or cables that are in the way of new installed equipment. Reconnect the new breaker status and alarm circuitry to the existing alarm cabinet. Eaton Powernet - communication: Contractor shall install, reconnect, reconfigure, and program the new power monitoring devices to the existing campus wide Powernet - monitoring system. Provide sign and caution board wherever required. Replace medium voltage cables. Contractor shall provide Arc flash labels to new equipment. Contractor shall provide a short circuit and coordination study. Set the breakers according to the recommended setting in the study. All work shall comply with the latest editions of NFPA 70, 70E, and 72. The Work will be constructed under a single prime contract. NOTE: All equipment including 480V switchgear and unit substation, power monitoring equipment, relays, and trip units must be able to communicate with the existing Eaton Powernet - system for remote and local monitoring and historical trending without additional new or upgrade Powernet - or third party software and servers. Circuit breakers must be free of any wiring harness or similar cord that is capable of catching the circuit breakers or switchgear frame during racking operation. Note: A temporary power panel with (12) 600 amp frame feeder breaker can be borrowed from the Government. However, Contractor is required to check for its usability and availability. How to Submit a Response: All interested parties are invited to provide the following information about your company/institution, or any teaming or joint venture parties. Interested parties are requested to submit product specifications that shall include: Contractor Information: - Name - Address - Point of Contact (POC), phone number, and email address - Product technical expert, phone number, and email address - DUNS Number - Website, if applicable - A description of relevant product equivalency 1. Page Limitations: Interested qualified organizations should submit a tailored capability statement for this requirement not to exceed 15 single sided pages including all attachments, resumes, charts, etc... (single spaced, 12 point font minimum) that clearly details the firm's ability to perform the aspects of the notice described above and in the draft SOW. All proprietary information should be marked as such. Responses will be reviewed only by NIST personnel and will be held in a confidential manner. If there are any responsible contractors who have proven experience and meet the capabilities cited to perform the requirement, they may submit experience to include contact information of location where product has been installed and is in use, capabilities and qualifications as outlined above which will be considered by the NIST. This sources sought is not a request for competitive proposals. However, all information received within seven (7) days after date of publication of this synopsis will be considered by the Government. 2. Due Date: Tailored capability statements are due no later than 12:00PM (Eastern Prevailing Time) on August 25, 2011. 3. Delivery Point: Please respond by email to the following: Point of Contact: Inquiries concerning this Notice may be directed to: Holly Knott, Contract Specialist (Contactor) Email: Holly.Knott@NIST.gov Ph.: 301-975-5935 Michael Szwed, Contracting Officer Email: Michael.Szwed@NIST.gov Ph.: 301-975-6330 Disclaimer and Important Notes: This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation. All responses must be received at NIST by the specified due date and time in order to be considered. Confidentiality: No proprietary, classified, confidential, or sensitive information should be included in your response. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s).

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS