Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on August 30, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought for Scheduling Contract for the National Geospatial-Intelligence Agency Next NGA West Campus (N2W)

Closed
W912DQ-16-R-4004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

TBD, MO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Kansas City
Contacts2 people available
OfficeKANSAS CITY, MO, 64106-2896, USA
Office AddressKANSAS CITY, MO, 64106-2896, USA
Contacts
Hilary M. WinansContract Specialist
Jay B. DenkerContracting Officer

Full Description

Show more
The following is a Sources Sought announcement to seek market research information on businesses with capability of providing the services described in the below scope of work. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SOURCES SOUGHT. No reimbursement will be made for any costs associated with providing information in response to this sources sought or any follow up information requests. This notice is a market research tool used for planning purposes only to determine the availability of capable contractors able to do the following: A new indefinite delivery indefinite quantity (IDIQ/IDC) contract is being contemplated for third party scheduling subject matter expert (SME) with knowledge, skills and abilities to perform independent schedule development, analysis and assessment to assist in the administration of U.S Army Corps of Engineers construction contracts. The primary scheduling SME efforts would be associated with a new $1B design and construction project for the National Geospatial-Intelligence Agency West campus located in St. Louis, Missouri. Scheduling SME efforts would occur during both the design and construction phases of the project. Task orders may be issued on other projects as needed by the district. The following is a listing of potential tasks based on current need. These tasks would be further developed and issued to the successful offeror as subsequent task orders. These are preliminary and may be modified based on coordination with the Contracting Officer. a. Participate in Pre-Construction review efforts by analyzing a construction contractor's construction schedule submittals at various identified milestones during the design phase. Provide a written report on the completed analysis. This could include but is not limited to: i. Verifying compliance with Project Schedule Specification 01 32 01.00 10 ii. Overall feasibility analysis. Ensure constructability based on, reasonable and realistic sequence of activities as it relates to construction methods, proposed durations, and activity relationships. b. Develop an independent government construction schedule based on interpreting provided plans and specifications in accordance with Project Schedule Specification 01 32 01.00 10. The independent government construction schedule shall be created in Primavera P6 software. The submittal shall include a written narrative identifying all assumptions and the ".xer" export file from P6 for Government review. c. Provide independent third party evaluation of an AE developed schedule and a Construction Contractor developed schedule. Submit a written report documenting the comparative analysis. The analysis should ensure constructability based on, reasonable and realistic sequence of activities as it relates to construction methods, proposed durations, and activity relationships. Brief the on-site USACE staff of your findings. d. During the construction phase of a project, review and evaluate the contractor's monthly schedule update submission. Analyze the schedule for variance from the previous month submission. Verify the contractor's schedule against actual site conditions. For each monthly update, provide a written narrative describing the analysis and conduct an on-site briefing to senior USACE construction staff. Participate in periodic schedule update meetings and weekly progress meetings as requested by on-site USACE personnel. e. During the construction phase of a project, complete forensic schedule analysis on an as needed basis. Conduct analysis and provide recommendations on responsibilities for impacts of submitted modifications, RFIs, claims, and other changes which have impacted the schedule. Provide recommendations to the Government on merits of the contractor's assertions that these have adversely impacted contractor performance and that the contractor is due compensable time extension(s). Provide written analysis and onsite presentations as needed. f. At the beginning of the construction phase of a project, review the construction contractor's Initial Project Schedule submittal. Review schedule for constructible, reasonable and realistic sequence of activities as it relates to construction methods chosen and overall compliance with Project Schedule Specification 01 32 01.00 10. Provide written narrative highlighting items of non-compliance. Conduct additional reviews as applicable until the schedule is approved. g. During the construction phase of a project, review recovery schedule submittals which would occur should a contractor fall behind the approved construction schedule. The recovery schedule must demonstrate how the rate of progress will be regained. Review the recovery schedule for constructible, reasonable and realistic sequence of activities and overall compliance with Project Schedule Specification 01 32 01.00 10. Provide written narrative highlighting items of non-compliance. Conduct additional reviews as applicable until the recovery schedule is approved. The North American Industrial Classification System (NAICS) code for this procurement is 541330 (Engineering Services), which has a small business size standard of $15,000,000.00 in average annual receipts. The Small Business size standard for this code is $15,000,000.00. To be considered a Small Business under this NAICS code, the respondent's average revenue for the last three fiscal years cannot be more than $15,000,000.00. If the respondent's average revenue for the last three fiscal years is over $15,000,000.00 the respondent is not considered a Small Business. If the contract is set-aside for Small Business, FAR 52.219-14, Limitation on Subcontracting, will be included in the contract. This clause requires that at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. ADDITIONAL PROJECT INFORMATION Prior experience in the following areas is required: 1) Reviewing and verifying schedule submittals comply with UFGS Project Schedule Specification 01 32 01.00 10 and ensure constructability based on, reasonable and realistic sequence of activities as it relates to construction methods, proposed durations, and activity relationships. 2) Developing construction schedules based on interpreting provided plans and specifications in accordance with UFGS Project Schedule Specification 01 32 01.00 10 utilizing P6 software. 3) Reviewing and evaluating the contractor's monthly schedule update submission for accuracy and matches field conditions. 4) Completing forensic schedule analysis and provide recommendations on responsibilities for impacts of submitted modifications, RFIs, claims, and other changes which have impacted the schedule. 5) Reviewing recovery schedule submittals which would occur should a contractor fall behind the approved construction schedule. How to Respond to this Sources Sought Notice: If your company has recent experience similar to that mentioned in the above scope of work, please respond to the information below by email to: hilary.m.winans@usace.army.mil by 2:00 pm Central Standard Time (CST) Friday, November 6, 2015. 1. Description of up to five (5) five similar projects completed by your company within the past seven (7) years, including as much of the following information as possible: (a) dollar amount of the overall construction effort and dollar amount of the contract; (b) brief description of the technical requirements of that scheduling effort; (c) a description of the work that was self-performed; (d) description of the final output that your firm provided to support the project and the benefits that this provided for the designer, constructor, and owner, (e) a description of role on the contract (prime, sub, etc). (f) name, address, point of contact, and phone number of customer organization for which the work was done. If possible at least one example should highlight experience in developing a full construction schedule, one should highlight experience with forensic schedule analysis, and one should highlight experience completing a full schedule review of another's work product. One existing sample of each of the three efforts listed is allowed to be submitted. When submitting an example of a project schedule, it should be a simple P6 Activity/Gantt chart view with the accompanying schedule log file. 2. Firm's business size and, if applicable, small business category: Large Business, Small Business, (Section 8(a), Historically Underutilized Business Zones (Hub-Zone), Women Owned, Service Disabled Veteran Owned (SDVOSB), etc. 3. Firm's Joint Venture information, if applicable - existing and potential. The response must be specific to the qualifications listed above to show that the respondent meets the requirements and possesses the necessary skills and experience. If a response does not show that the respondent meets the qualifications and/or does not possess the necessary skills and experience, the respondent will not be considered by the Government. Again this is not a request for proposal or quotation; there is no solicitation available at this time. A determination by the Government to proceed with the acquisition as a set-aside for 8(a) program, HUBZone, Small Business, etc. or unrestricted is within the discretion of the Government. Contracting Office Address: US Army Engineer District, Kansas City, ATTN: CENWK-CT, 647Federal Building, 60l East 12th Street, Kansas City, MO 64106-2896 Place of Performance: TBD Point of Contact(s): Jay.b.denker@usace.army.mil Jay B. Denker, 816-389-3934 Hilary.m.winans@usace.army.mil Hilary Winans, 816-389-3500

More opportunities from Department Of Defense → W071 Endist Kansas City

Same awarding agency

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
Other Heavy and Civil Engineering Construction

POSTED

about 15 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Federal
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
Solicitation # W912DQ27BA002
The U.S. Army Corps of Engineers, Kansas City District, is soliciting bids for the Atchison Storm Sewer Separation Improvements project in Atchison, Kansas. This small business set-aside construction project, identified by solicitation number W912DQ27BA002, has an estimated value between 1 million and 5 million dollars. The scope of work involves the construction of new and improved storm sewers, the removal of existing storm and sanitary sewers, and the installation of reinforced concrete pipe, reinforced concrete box culverts, and storm water inlets or junction boxes. The contractor is responsible for providing all necessary labor, equipment, and supervision, as well as performing incidental restoration of pavements, sidewalks, driveways, and parkways. The project is structured as a firm-fixed-price contract with two primary line items: the 16th Street Alignment and an optional 15th Street Alignment. Performance requires adherence to City of Atchison Public Works Specifications and ASTM standards, with all testing laboratories validated by the USACE Material Testing Center. Key administrative requirements include the submission of an initial project schedule within 42 calendar days of the notice to proceed and the hosting of a partnering session within 45 calendar days of award. Bids must be submitted by November 13, 2026, and must include a completed Standard Form 1442 and required bid bonds. This heavy construction project is subject to the Davis-Bacon Act and EM 385-1-1 safety and health information.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 24 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS