Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Formal RFP for WWYK200131 - Repair Chilled Water System, Bldg. 2280

Closed
FA813726R0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, a total small business set-aside under NAICS code 236220, involves repairing the chilled water system at Building 2280 on Tinker Air Force Base, Oklahoma. The contractor is responsible for all aspects of the construction work including materials, labor, tools, transportation, equipment, testing, and quality control to deliver a fully functional chilled water system. The scope requires onsite verification of approximate existing conditions provided by the government and adherence to security measures such as FOD awareness training for personnel working around active flight areas. The contract explicitly excludes Controlled Unclassified Information (CUI) from contractor systems. Vendors must attend a mandatory site visit scheduled for April 10, 2026, with RSVPs and detailed base access authorization submitted by March 30, 2026. Failure to meet this requirement results in exclusion from the solicitation. The project drawings and other key documents will only be provided to eligible vendors who confirm their site visit attendance. The procurement follows a Two-Step Sealed Bidding process, beginning with the submission of technical proposals by June 8, 2026, followed by price bids only from those deemed technically acceptable. This process emphasizes a thorough technical evaluation based on management capability, experience, and compliance with contract requirements before price proposals are considered. Communication protocols and proposal preparation instructions are detailed to ensure clarity, compliance, and propriety. The contractor must coordinate all necessary personnel and subcontractors from the outset because no additional site visits will be conducted between proposal stages. Requests for Information (RFIs) arising from the site visit were due by April 21, 2026, with responses provided to all participants to clarify the technical requirements. The contracting office managing this solicitation is the Department of Defense’s FA8137 Afsc Pzioc office located at Tinker AFB. The project demands careful logistical planning, security adherence, and compliance with federal acquisition regulations to successfully fulfill the contract requirements.

General Info

Repair chilled water system at Tinker AFB; mandatory site visit, two-step bidding process, strict security compliance.

Agency

Department Of Defense → FA8137 Afsc Pzioc

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

(27)

Section M Evaluation Factors for Award (Two-Step)

PDFevaluation-factors

Section L Instructions to Bidders (2-Step) for Construction Contract

PDFinstructions-to-bidders

200131_Pre-Bid+RFIs_Utility+Site+Map+Legend_Att.+2.pdf

PDF

WWYK200131 Repair Chilled Water System Notice of Intent

PDFpresolicitation

Section M - Evaluation Factors for Award (Two-Step)

PDF5 pagesevaluation-factors

Section L - Instructions to Bidders (Two-Step) for Construction Contract RFP

DOCXinstructions-to-bidders

Section L - Instructions to Bidders (Two-Step) for Construction Contract RFP

DOCXinstructions-to-bidders

200131_Pre-Bid+RFIs_Geotechnical+Report_Att.+4.pdf

PDF

FA813726R0010 Repair Chilled Water System, Bldg. 2280 RFP

PDFrfp

Specifications Rev. 01 for Repair Chilled Water System WWYK200131

PDFspecifications

Section M - Evaluation Factors for Award (Two-Step)

DOCXevaluation-factors

Pre-Bid RFI Responses for WWYK200131 Repair Chilled Water System

PDFq-and-a

Amendment 0002 to Solicitation FA813726R0010

PDFamendment

FA813726R00100001 Repair Chilled Water System, Bldg. 2280 RFP

PDFrfp

FA813726R00100002 Repair Chilled Water System, Bldg. 2280 RFP

PDFrfp

Section L Instructions to Bidders for Construction Contract Two-Step Sealed Bidding

PDF10 pagesitb

200131 Pre-Bid RFIs Asbestos Analysis Report

PDFreport

FA813726R0010 Repair Chilled Water System, Bldg. 2280 RFP Draft

PDFrfp

WD-OK20250049 Modification 1 Oklahoma County Building Construction

PDFwage-determination

EAL List for Construction Project WWYK200131 Repair Chilled Water System

XLSXother

200131_Pre-Bid+RFIs_Project+Pics_Att.+3.pptx

PPTX

Amendment 0001 to Solicitation FA813726R0010

PDFamendment

SOW Repair Chilled Water System B2280 WWYK200131

PDFsow

Pre-Bid RFI Responses for WWYK200131 Repair Chilled Water System

PDFq-and-a

Solicitation FA813726R0010 Repair Chilled Water System Bldg. 2280

PDFrfp

Section I Additional Clauses FAR Provisions

PDFclauses

200131_Pre-Bid+RFIs_Utility+Site+Map_Att.+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

8 updates
PhaseClosed
Amendment 2

Contract was updated

Amendment 3

Contract was updated

Type Changed

special-notice → Presolicitation

Amendment 4

Contract was updated

Type Changed

Presolicitation → special-notice

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Type Changed

special-notice → Presolicitation

Type Changed

Presolicitation → special-notice

Type Changed

special-notice → Solicitation

Amendment 12

Contract was updated

Amendment 13

Contract was updated

Posted

special-notice

Amendment 0

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Organization / Agency
Department Of Defense → FA8137 Afsc Pzioc
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more

This requirement is to be solicited as a total small business set-aside.


The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma (project drawings can be provided to interested vendors for additional location and schematic information). Contact the primary or secondary point of contact to request project drawings. This is a construction-only contract.


The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.


Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.


This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.


IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems.


Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information is due by 11:59 PM CST, Monday, March 30th, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Contract documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.


Attachments include an EAL spreadsheet, please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner.  If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.


The requirement will be awarded in accordance with Two-Step Sealed Bidding procedures (FAR 52.214-25) which calls for the initial submission of technical-only proposals before submission of price bids. As such, please plan on coordinating all necessary personnel and/or subcontractors whose assessment of the requirement will have an impact on the technical proposal and subsequent priced proposal. An additional site visit will not occur between receipt of the technical proposals and submission of price bids.


The site visit is scheduled for April 10th, 2026 at 10:00 A.M. We will meet outside of the airfield walk gate just north of Bldg. 2280 at 10:00 A.M. More specific meeting details have been shared with vendors who have sent an RSVP.


The due date for the RFIs arising from the initial site visit is April 21st, 2026 at 11:59 P.M. Please submit all RFIs to the primary and secondary points of contact. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees.


All RFI responses have been received and compiled. Please see the attachments for the RFI responses and their associated documents. Utilize these in continuing to formulate your Step One Technical Proposals.


This notice signifies the release of the formal RFP for Project No. WWYK200131 - Repair Chilled Water System, Bldg. 2280. The due date for Step One Techincal Proposals has been extended to June 15th, 2026 at 5:00 PM CST. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to previously received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates.


The revised RFI responses are now attached. The responses provide additional clarification on some replies for utilization by offerors in formulating their Step One Technical Proposals. The revised responses are highlighted. Please reach out to the primary or secondary point of contact should you have more questions regarding the responses.


An amendment to the formal RFP and a revision to Section L - Instructions to Bidders has been issued to update the amount of the bid guarantee to encourage offeror participation to the maximum extent possible. The due date for Step One Technical Proposals has not been extended, and all other terms and conditions of the solicitation and Section L remain unchanged and in full force and effect. Please refer to the amended RFP and revised Section L in the attachments section of this notice for more information.


An additional amendment has been made to the formal RFP to extend the due date for Step One Technical Proposals to June 15th, 2026 at 5:00 PM CST. This is to allow offerors additional time to assess equipment selection, availability, and associated pricing. Supplemental verbiage has also been added to the specifications to provide additional guidance for connecting the controls to the front end of the chilled water system. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP and the revised specifications in the attachments section of this notice for more information.


Point of clarification: The bid guarantee isn't required until Step Two Priced Bids are due. Offerors may acquire a bonding letter from their surety as an assurance, but it is not mandatory. Failure to furnish a bid guarantee in the proper amount may be a cause for rejection of an offeror's bid.