Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sources Sought/Synopsis East West Infrastructure Connector Construction Project

Closed
PANNAD-26-P-0000030268Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Baltimore District, is conducting market research for the East-West Infrastructure Connector (EWIC) construction project at Fort George G. Meade, Maryland, with an estimated value between $40 million and $60 million. This is a sources sought notice intended solely for acquisition planning and not a solicitation for bids or proposals. The project will be executed under a Firm-Fixed Price Design-Bid-Build delivery method and falls under NAICS code 237310 for Highway, Street, and Bridge Construction, with a size standard of $45 million. The scope includes major roadway realignments of Venona and Rockenbach Roads, extensive underground telecommunications and electrical duct bank installations, a Physical Security and Anti-Terrorism fence, a new pedestrian sallyport, a signalized intersection, paving, demolition, site restoration, tree planting, erosion and sediment controls, stormwater management facilities, and ADA-compliant walkways. The option component involves approximately half of the electrical duct bank work. All work must occur within a secure military installation, requiring U.S. citizenship and security clearance for all personnel, and the government will handle MDE and wetland permits while contractors secure all other local permits. Prime contractors interested in responding must submit a capabilities narrative not exceeding 25 pages detailing corporate information, business size and socioeconomic status, proposed business structure, and extensive evidence of relevant past performance, particularly in underground duct bank installation, PSAT fencing, and construction within secure federal environments. The submission must address technical and managerial competencies including self-performance percentages, stakeholder coordination with utilities and concurrent projects, complex traffic management plans with night/weekend operations, and the feasibility of using multiple simultaneous crews to accelerate schedules. Responses must also evaluate the ability to meet contractually enforceable intermediate milestones, manage security requirements including cost impacts, ensure CMMC compliance across prime and subcontractor tiers, and assess subcontractor market readiness for CMMC. Contractors must include their total bonding capacity with surety verification and provide an independent assessment of whether a 30-month period of performance is realistic. All submissions must be emailed to designated USACE points of contact no later than July 28, 2026, and must strictly follow the outlined structure and formatting requirements. This notice is exclusively for potential prime contractors; subcontractor responses will not be accepted.

General Info

U.S. Army seeks prime contractors for $40M–$60M EWIC project at Fort Meade with security clearance, duct banks, PSAT fence, and CMMC compliance.

Agency

Department Of Defense → W2SD Endist BaltimoreView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

St James, MD, 20755, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts2 people available
OfficeBALTIMORE, MD, 21201-2526, USA
Organization / Agency
Department Of Defense → W2SD Endist Baltimore
View Agency Profile
Office AddressBALTIMORE, MD, 21201-2526, USA

Full Description

Show more

SOURCES SOUGHT/SYNOPSIS EAST WEST INFRASTRUCTURE CONNECTOR (EWIC) CONSTRUCTION CONTRACT


Sources Sought #: PANNAD-26-P-0000 030268


Agency: U.S. Army Corps of Engineers (USACE), Baltimore District, Fort Meade, MD


Title: Market Research and Sources Sought for East-West Infrastructure Connections (EWIC) Construction Project


Classification Code: Y – Construction of Structures and Facilities


Product Service Code (PSC): Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS


NAICS Code: 237310 – Highway, Street, and Bridge Construction (Size Standard: $45.0 Million)


Estimated Construction Cost: The estimated magnitude of this construction project is between $40,000,000 and $60,000,000


1.0 SYNOPSIS & RESPONSE INSTRUCTIONS


This is a Sources Sought notice and is for informational purposes only. This is not a request for proposals, quotations or bids. There will not be a solicitation, specifications, or drawings available at this time.


The U.S. Army Corps of Engineers, Baltimore District, East Campus Integrated Program Office (ECIPO) requests letters of interest from potential prime construction contractors. The information received will be used for acquisition planning purposes to determine the appropriate procurement strategy and to identify and resolve business and technical risks. The Government will not award a contract based on this notice, nor will it reimburse respondents for any costs associated with preparing or submitting a response.


The anticipated project will be a Firm-Fixed Price Design-Bid-Build (DBB) construction project for the construction of the East-West Infrastructure Connection at Fort George G. Meade, MD. The magnitude of this project is between $40,000,000 and $60,000,000. The North American Industry Classification System code (NAICS) for this procurement will be 237310 with a standard size of $45.0M.


2.0 PROJECT DESCRIPTION


The USACE Baltimore District anticipates a requirement for the construction of the East-West Infrastructure Connections (EWIC) project within a secure campus at Fort Meade, MD. The project is in a dynamic operational environment with multiple adjoining projects and stakeholders.


The anticipated scope of work includes a base scope and one option. The option is for approximately half of the electrical duct bank installation. The total scope includes, but is not limited to:


  • Heavy Civil & Roadway Construction: Realignment and construction of Venona Road and Rockenbach Road.
  • Underground Utility Systems: Installation of extensive new underground telecommunications and electrical duct banks, including a minor sanitary line relocation, complete with associated manhole infrastructure.
  • Physical Security: Installation of a significant Physical Security and Anti-Terrorism (PSAT) fence and a new pedestrian sallyport.
  • Traffic Systems: Construction and commissioning of a new signalized intersection.
  • Paving & Site Work: Application of asphalt surface course, demolition (including an existing vehicle control point), clearing, grubbing, grading, final restoration of a soil stockpile area, and tree planting in conformance with reforestation requirements.
  • Supporting Facilities: Implementation of comprehensive erosion and sediment controls, stormwater management (SWM) facilities, streetlight removal and relocation, and ABA/ADA accessible walkways.

Project Constraints & Key Information:


  • Permitting: The Government will secure all necessary Maryland Department of the Environment (MDE) and wetland-related permits prior to contract award. The construction contractor shall be responsible for obtaining all other permits required to perform the work.
  • Intermediate Milestones: The project will feature critical, contractually enforced intermediate milestones.
  • Security: All work will be performed within a secure, access-controlled military installation. All contractor and subcontractor personnel must be U.S. citizens and are subject to security screening.

3.0 SUBMISSION REQUIREMENTS


Interested PRIME CONSTUCTION CONTRACTORS shall submit a capabilities narrative, limited to 25 pages, addressing the following information. Please format your response to address each question in the order listed below.


PART I: CORPORATE INFORMATION


  1. Company Profile: Name, address, CAGE Code, Unique Entity ID (UEI), and technical point(s) of contact.
  2. Business Size & Status: Identify your business size under NAICS 237310 and any applicable socioeconomic categories (8(a), HUBZone, SDVOSB, WOSB).
  3. Intended Business Arrangement: State your firm’s interest in proposing on this project as a Prime Contractor. Describe your likely business arrangement (e.g., standalone Prime, Joint Venture, Prime with key subcontractors).

PART II: TECHNICAL & MANAGERIAL CAPABILITY


  1. Corporate Experience: Submit a minimum of three (3) and no more than five (5) relevant construction projects completed within the last ten (10) years. For each project, provide a detailed narrative describing the work and how it relates to the EWIC project scope, specifically addressing experience with underground duct bank installation, PSAT fencing, and roadway construction in a secure operational environment.
  2. Prime Contractor Role & Self-Performance: Describe the specific scopes of work your firm would intend to self-perform and provide the approximate percentage of the total contract value this represents. Acknowledging the impact of tiered subcontractor markups on total project cost, explain how your self-performance and subcontracting strategy provides the best value to the Government.
  3. Complex Stakeholder Coordination: Describe your firm's experience managing projects on active, complex sites like military installations. Specifically detail your approach and past performance in coordinating with multiple entities such as public utilities (e.g., Baltimore Gas and Electric), communication infrastructure providers, and adjacent, concurrent construction projects.
  4. Maintenance of Traffic (MoT) Phasing: Describe your firm's experience in developing and managing complex, phased MoT plans, particularly in environments with limited laydown/staging areas. Provide examples of how you have planned for and executed work requiring night and weekend hours to meet MoT constraints.
  5. Execution Strategy & Multiple Crews: The Government is assessing the viability of an accelerated schedule by employing multiple, independent crews that could work simultaneously. Describe your firm’s capability and interest in executing the project using this methodology. Comment on the opportunities and challenges (e.g., management, supervision, logistics, security coordination) this approach presents.
  6. Management of Intermediate Milestones: Describe your experience managing projects with critical, contractually defined intermediate milestones (e.g., completing the Rockenbach Road realignment within the first year). How does your firm's project management approach ensure these milestones are met?
  7. Secure Environment Operations: Describe your experience managing projects within secure, access-controlled federal or military installations. Quantify, if possible, the typical cost impact (as a percentage of total project cost) associated with meeting these enhanced security requirements.
  8. Cybersecurity Maturity Model Certification (CMMC):
    a. Describe your firm's strategy for ensuring CMMC compliance for itself and its subcontractors.
    b. Provide your assessment of the local subcontractor market's administrative capacity to comply with CMMC requirements. Quantify the anticipated impact of CMMC compliance on competition and cost at the subcontractor level.
  9. Period of Performance (PoP): The Government's preliminary acquisition plan assumes a 30-month Period of Performance from NTP to completion. Please comment on the feasibility of this duration. Provide your firm's independent assessment of a realistic PoP and detail any key factors that could extend or compress this timeline.
  10. Bonding Capability: Provide your firm's total bonding capacity and per-project limit, evidenced by a letter from your surety.

Narratives shall be no longer than twenty-five (25) pages.  Email responses are required and should be submitted NLT close of business 28 July 2026 to Ms. Erica Eaton at erica.a.eaton@usace.army.mil and Jeffrey May at Jeffrey.B.May@usace.army.mil. Comments must be in the exact format as indicated above, and must include submitter’s name, phone number, and email address.


Comments will be shared with the Government, Customer and the Project Delivery Team, but otherwise will be held in strict confidence.


PLEASE NOTE:  AT THIS TIME, WE ARE ONLY INTERESTED IN RESPONSES FROM POTENTIAL PRIME CONTRACTORS.


More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 238160
New
Federal
DISA FY26 ROOF REPAIRS AT FORT MEADE, MARYLAND
Solicitation # W912DR26QA057
Solicitation W912DR26QA057 is a competitive, firm-fixed price contract issued by the U.S. Army Corps of Engineers, Baltimore District, for roof repairs at the DISA Headquarters complex at Fort Meade, Maryland. This total small business set-aside under NAICS 238160 is estimated between 1,000,000 and 5,000,000 dollars and will be awarded based on the Lowest Price Technically Acceptable process. The scope of work includes inspecting and repairing EPDM roofing across six buildings and associated structures, resetting lightning protection aerials, repairing or replacing gutters, and sealing cracks in exposed concrete foundation walls. The project duration is 545 calendar days from the notice to proceed, with all work performed during normal business hours in accordance with Unified Facilities Criteria and Guide Specifications. Due to the secure nature of the DISA facility, the contract mandates stringent security requirements. All personnel must be U.S. citizens with a minimum Secret security clearance verifiable in DISS, or be provided with a contractor-funded escort. The contractor must maintain a valid Facility Security Clearance and CAGE code, and personnel are required to complete mandatory training, including AT Level I, iWATCH, OPSEC, and TARP. Personally owned electronic devices are prohibited within the facility unless a waiver is granted. Amendment 0001 specifically provides site visit information, scheduling an organized visit for August 26, 2026, to facilitate contractor site investigation.
Roofing Contractors

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS