Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

South Main Street and Soda Bay Road Widening and Bike Lanes Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Main Street and Soda Bay Road Widening and Bike Lanes Project in Lake County, California, involves the rehabilitation and expansion of a roadway corridor located just south of Lakeport. The scope of work covers a 0.5-mile segment of South Main Street and approximately 0.8 miles of Soda Bay Road. Key infrastructure improvements include the construction of two 12-foot wide travel lanes, a continuous 12-foot wide center turning lane, and 8-foot wide paved shoulders designed as Class II bicycle facilities. Additional deliverables include the undergrounding of overhead utility lines, surface drainage improvements, and a safety correction to a horizontal curve on Soda Bay Road to increase its radius from 230 to 550 feet. The project is governed by CEQA and NEPA environmental standards, with recent addendums approved in November 2025 to allow for nighttime construction to maintain vehicle and business access. Environmental compliance includes a Streambed Alteration Agreement with the California Department of Fish and Wildlife and adherence to the Statewide NPDES General Construction Activity Permit. Construction is expected to span two seasons and may be implemented in two phases depending on funding. Critical scheduling constraints require that all in-channel and culvert work be performed during the dry season and outside the Clear Lake Hitch spawning season. The project is managed by Lake County, with oversight from the Lake County Department of Public Works and the Community Development Department.

General Info

Lake County road widening and bike lane project including utility and drainage improvements.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Lake County
Office AddressN/A
Contacts

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number LAK-61069-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lake County Department of Public Works. The project is limited to the widening of the existing roads paved area from 24 feet to 52 feet to add a center tuning lane and bicycle lane. This activity will include alterations to seven culverts: extending one 6 foot by 2 foot reinforced concrete box culvert (RCB) and one 6 foot by 2.5-foot RCB; replacing one 12 inch diameter reinforced concrete pipe (RCP) and one 24 inch diameter RCP; replacing and extending one 12 foot by 4.5 foot RCB and one 18 inch diameter RCP; and relocating one 6 foot by 3 foot RCB. The installation of inlet and outlet end treatments (flared end sections or rock slope protection) and installation or replacement of drainage inlets and concrete headwalls. The project also involves vegetation removal, including the removal of 21 mature riparian trees, infilling existing roadside drainages, establishing new stormwater drainages, and grading for an increase of 3.04 acres of impervious surface along the 1.3 mile long project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details

More opportunities from California → Lake County

Same awarding agency

NAICS: 237210
SLED
Guenoc Valley Mixed-Use Planned Development Project
Solicitation # DA24-01
The Guenoc Valley Mixed-Use Planned Development Project, identified by solicitation number DA24-01, is a phased development in Middletown, Lake County, California, led by applicant Lotusland Investment Holdings Inc. The project encompasses the construction of resort facilities, including residential units, boutique hotels, neighborhood-serving retail, restaurants, open space, and off-site workforce housing. A key component of the development is the Anasu Farms Tentative Subdivision Map, which involves eight phases and the creation of 34 new parcels, including 30 resort residential, one commercial, and three facilities parcels, along with six peripheral parcels and a community clubhouse. Infrastructure work is a critical part of the project, specifically the Guenoc Ranch Tier 2 and 3 Roads, which involves widening and realigning existing roadways to meet safety standards, constructing new crossings, and repairing or installing 11 culverts. This work is governed by Lake and Streambed Alteration Agreement EPIMS Notification Number LAK-15321-R2 from the California Department of Fish and Wildlife. The project has undergone comprehensive environmental review under CEQA, with a certified Environmental Impact Report and adopted mitigation measures. Administrative approvals include a Development Agreement approved by the Lake County Board of Supervisors on October 21, 2025, and a Water Supply Assessment.
Land Subdivision

POSTED

3 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS