Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

South Main Street And Soda Bay Road Widening And Bike Lanes Project, In Lake County California

Open
272247State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Main Street and Soda Bay Road Widening and Bike Lanes Project, solicitation number 272247, is a construction project managed by the County of Lake in California. With an estimated construction cost of 18 million dollars, the scope of work includes roadway widening using Hot Mix Asphalt and Aggregate Base, Full Depth Recycling with cement, and cold planning. The project also encompasses the replacement of a concrete box culvert with wingwalls, drainage work, the installation of fences and midwest guardrails, and the application of thermoplastic traffic stripes. Additionally, the contract includes additive alternative bid work for modifications to existing water and sewer systems. All work must adhere to the project plans, Standard Specifications, and special provisions. A critical requirement is that all labor must be paid at least the minimum wage rates established by the State of California's Director of Industrial Relations. Bids must be submitted electronically via QuestCDN.com by 3:00 p.m. on November 30, 2026. To be eligible, prospective bidders must be on the plan holder list through Quest CDN, purchase digital contract documents for 22 dollars, and pay a 42 dollar bid submission fee. Scott Hornung serves as the primary point of contact for this solicitation.

General Info

Lake County construction project for road widening and bike lanes costing $18 million.

Documents

1
PDF, High priority: read this firstifb
High

Read the document

Due in 14 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 14 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Lake
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → County of Lake
Office AddressN/A
Contacts
Scott Hornung

Full Description

Show more
Bid #272247: The project involves mobilization, traffic control, water pollution control, clearing and grubbing, roadway widening with Hot Mix Asphalt (HMA) and Aggregate Base, Full Depth Recycling - Cement, Cold Planning, replacement of a concrete box culvert with wingwalls, drainage work, fence installation, midwest guardrail, and thermoplastic traffic stripes. Additionally, additive alternative bid work includes modifications to existing sewer and water systems. The contractor is responsible for performing, placing, constructing, or installing all other necessary items and details as required by the plans, Standard Specifications, and special provisions.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project managed by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29 from Coyote Creek Bridge to Diener Drive/Road 543 and Route 53 at Route 29, involving cold planing of AC pavement and the installation of Rubberized Hot Mix Asphalt Gap Graded overlay and Hot Mix Asphalt Type A surfacing. The project has an estimated cost of 14,400,000 USD, with bidding requirements specifying a bidder's security of at least 10 percent and a performance timeline between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, including strict Buy America/Build America requirements and environmental mandates. Contractors must ensure equipment is pressure washed to prevent invasive species and provide environmental product declarations for concrete and asphalt. Key personnel requirements include a safety representative with specific certifications from the Board of Certified Safety Professionals or the National Association of Safety Professionals, as well as valid first aid and CPR certifications. Job site activities must commence within 55 days of contract approval, and all work must adhere to local codes, MASH Test Level 3 safety standards, and RWQCB water quality objectives.
California Department of Transportation

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → County of Lake

Same awarding agency

NAICS: 237990
New
SLED
Eastlake Sanitary Landfill, Phase 2 & 3 Cell Construction
Solicitation # 272221
The County of Lake is soliciting bids for the Eastlake Sanitary Landfill Phase 2 and 3 Cell Construction project located in Clearlake, California. This stipulated sum, single-prime contract involves the construction of a liner system across approximately 7 acres. The scope of work includes excavating and stockpiling soils and rock, installing a complex multi-layer liner system consisting of a 60-mil HDPE primary and secondary geomembrane, a geosynthetic clay liner, and a leachate collection and removal system. Additionally, the contractor is responsible for relocating existing stormwater and landfill gas pipes, extending electrical and force mains to a new sump location, and providing a site-specific health and safety plan. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit sealed bids by December 16, 2026, including a 5% bid bond and various certifications, such as prevailing wage and noncollusion affidavits. The successful contractor must provide 100% performance and payment bonds and adhere to strict California labor codes and equal employment opportunity standards. Technical requirements include specific ASTM standards for geosynthetic clay liners and MSS SP25 for valve marking. Payment is managed through monthly partial payment estimates approved by the Engineer, with final payment issued 35 days after the filing of a Notice of Completion.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS