This Solicitation opportunity from Wisconsin was posted on February 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
South Shore Water Reclamation Facility Building Roofs Replacement Phase 5
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the comprehensive removal and replacement of roofing systems at the South Shore Water Reclamation Facility in Wisconsin, specifically targeting multiple buildings and roof sections. The scope includes removing the existing fully-ballasted EPDM roofing system and installing new fully-adhered PVC roofing membranes across the Preliminary Treatment Facility, Scum Handling Building, Pickle Liquor Facility (covering three roof sections), and Sludge Dewatering Building. Additionally, the project entails replacing the fluid-applied membrane roofing system on two roofs of the Pickle Liquor Facility. The work also includes installing new ladders, fall protection systems, and re-sealing coping joints to ensure safety and durability. The project is part of the South Shore Water Reclamation Facility Building Roofs Replacement Phase 5, with a contract value estimated between $2 million and $5 million. It was publicly solicited on February 18, 2025, with a response deadline of March 27, 2025. The Milwaukee Metropolitan Sewerage District is managing the project, and interested contractors can contact Nathan Churchill for further details. The work is located within Wisconsin, and the project emphasizes comprehensive roofing upgrades to enhance the facility’s operational integrity and safety.
General Info
Place of Performance
WI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Removal and replacement of fluid applied membrane roofing system and associated work as indicated on drawings: SS 339 Pickle Liquor Facility (Roof 4 and Roof 5)
Removal and replacement of ladder, installation of fall protection, re-sealing of coping joints and associated work as indicated on drawings: SS 311 Central Control Facility
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
