Southwest Pipeline Pool 5 Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Oakdale Irrigation District is initiating the Southwest Pipeline Pool 5 Replacement Project to replace an aging pipeline that has reached the end of its useful life. To avoid future conflicts with the North County Corridor's planned phase 2 route, the project involves realigning and installing approximately 1,646 linear feet of 27 inch PVC pipeline to replace the existing 30 inch concrete pipeline across specific parcels. Additionally, the project includes replacing existing valves on the pipeline with two new turnouts. Construction is scheduled to occur between November 1, 2026, and March 1, 2027, during the period when the pipeline is dewatered. The project will not increase the service area or the capacity of the Southwest Pipeline. This forecast is managed by the Oakdale Irrigation District in California, with Scot A. Moody serving as the primary point of contact.

General Info

Oakdale Irrigation District will replace 1,646 feet of pipeline from November 2026 to March 2027.

Agency

California → Oakdale Irrigation District

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Eleanor Avenue and Claribel Road, CA

Set-Aside

NONE

Documents

(1)

filed ceqa

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Oakdale Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Oakdale Irrigation District
Office AddressN/A
Contacts
Scot A MoodyGeneral Manager

Full Description

Show more
The Oakdale Irrigation District (OID) Southwest Pipeline through APNs: 062-030-011/012 and 062-031-004 (Parcels) has reached the end of its useful life and is in need of replacement. The existing pipeline alignment is in the path of the North County Corridor’s (NCC) planned phase 2 route. In order to avoid potential future impacts from the NCC, the existing pipeline is proposed to be realigned and replaced through the Parcels as part of the Southwest Pipeline Pool 5 Replacement Project (Project). Approximately one thousand six hundred forty-six (1,646) linear feet of 27” PVC pipeline is proposed to be installed in place of the existing 30” concrete pipeline. Construction will take place between November 1, 2026 and March 1, 2027 when the pipeline is dewatered. Neither the capacity nor service area of the Southwest Pipeline will be increased as a result of the Project. The Project is proposed to also include the installation of two (2) turnouts in place of existing valves on top of the Southwest Pipeline.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
Alturas Wastewater Treatment Plant Improvement Project
Solicitation # EPIMS-MOD-63461-R1
The City of Alturas is undertaking infrastructure improvements to enhance its wastewater management system by installing a new pipeline that will transport raw wastewater to offsite treatment ponds and land application areas. To minimize environmental disruption, the project employs horizontal directional drilling beneath three water bodies—the North Fork Pit River, South Fork Pit River, and an unnamed ephemeral tributary—each requiring a bore approximately 3,000 feet in length at depths between 60 and 80 feet. This approach avoids direct excavation within streambeds and reduces impacts on aquatic habitats. The project has been authorized under a Lake and Streambed Alteration Agreement issued by the California Department of Fish and Wildlife, in compliance with Fish and Game Code section 1602, ensuring regulatory oversight and environmental safeguards are met during construction. The initiative is part of broader efforts to modernize Alturas’s wastewater infrastructure, promoting public health and environmental stewardship by diverting untreated effluent from local waterways. The City of Alturas serves as the project applicant and primary point of contact, with Warren Farnam listed as the primary planner and Dyana Judnick of the California Department of Fish and Wildlife serving as the environmental scientist overseeing regulatory compliance. The project was forecasted for future consideration on June 10, 2026, and all activities are confined to the city’s jurisdiction in Modoc County, California, with no federal funding or set-aside provisions identified. The alignment and drilling methodology reflect a commitment to minimizing surface disturbance while achieving functional wastewater conveyance goals.
City of Alturas

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
The U.S. Army Corps of Engineers, Japan District is preparing to solicit bids for the construction of a new 100,000-barrel cut-and-cover JP-8 bulk fuel storage tank at Yokota Air Base, Japan, under project title DESC2103C Phase II. The project includes the installation of a reinforced concrete pump house on top of the tank housing four 600-gpm issue pumps and one 50-gpm water draw-off pump, along with a high-level valve, independent level alarms, and a fully integrated automatic tank gauging system connected to the existing filter separator building’s control infrastructure. Additional components include piping, valves, vaults, a product saver tank, and a steel tank with a concrete outer wall and rolling cover for equipment access, all topped with a low-slope concrete roof featuring built-up roofing and overhangs. The total project value is estimated between ¥2.5 billion and ¥10 billion Japanese yen, classified under NAICS code 237120 for oil and gas pipeline and related structures construction. The contract will be awarded as a firm-fixed-price construction agreement using the Lowest Price Technically Acceptable source selection method. Only local sources physically located and licensed to perform construction in Japan are eligible to bid; U.S.-based contractors without local presence will not be considered. Offerors must hold a valid Japanese civil or architectural construction license, verifiable through the Ministry of Land, Infrastructure, Transport and Tourism’s website, and must be registered in both the System for Award Management (SAM) and as a Joint Venture entity if applicable. Solicitation is anticipated in August 2026 with proposals due by August 31, 2026, and all submissions must be made electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. All amendments and updates will be posted to SAM.gov and PIEE, and it is the offeror’s responsibility to monitor for changes. No United States Official Contractor status under the U.S.-Japan Status of Forces Agreement will be extended to contractors normally resident in the United States. Contract performance is required entirely within Japan, and compliance with all Japanese laws, labor standards, and regulations is mandatory.
W2SN Endist Japan

POSTED

2 days ago

DEADLINE

in 5 months
View Details