Space Port of the Future Infrastructure (SPOTFi) Campus

Active
W9127826SC075Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Space Port of the Future Infrastructure (SPOTFi) Campus project is a Department of Defense initiative managed by the USACE South Atlantic District to develop a high-quality workplace environment at Cape Canaveral Space Force Station, Florida. This program utilizes a Progressive Design-Build (PDB) delivery model via an Other Transaction Agreement (OTA) authorized under 10 U.S.C. 2808a, meaning it is not subject to the FAR. The scope of work involves the construction of six key facilities, including one security forces station, two administrative facilities, two storage warehouses, and one vehicle maintenance facility, with a total program funding cap of 409 million dollars. All facilities must be completed by April 2030 to avoid interfering with launch operations. The procurement process is a two-step qualifications-based selection. Step 1 requires the submission of a white paper evaluated on relevant experience, PDB expertise, understanding of project goals, design management for ICD/ICS 705 compliance, and team organization. Step 2 involves a pitch presentation focusing on collaborative validation, risk management, and open-book pricing. The project is divided into two phases, with Phase 1 covering design and pre-construction services and Phase 2 covering final design and construction. Key technical requirements include adherence to the Space Launch Delta 45 Installation Facilities Standards and strict compliance with environmental regulations regarding asbestos and PCB handling. Performance is monitored through a three-phase control system, and the agreement includes liquidated damages of 2,660 dollars per day for unexcused delays.

General Info

USACE PDB project for six Cape Canaveral facilities, 409 million budget, due April 2030.

Agency

Department Of Defense → W074 Endist MobileView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Cape Canaveral Space Force Station, FL, AL

Set-Aside

NONE

Documents

(5)

W91278269A075 - SPOTFi Request for White Paper

PDFrfp

W91278269A075 Attachment 2: Standard OTA Agreement Articles

PDFcontract-document

W91278269A075 Attachment 3: Division 01 Specifications

PDFspecifications

W91278269A075 Attachment 4: Cape Canaveral IFS Supplement

PDFspecifications

W91278269A075 - FY27 Spaceport of the Future Infrastructure (SPOTFi) Program

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
Contacts2 people available
OfficeMOBILE, AL, 36602-3630, USA
Organization / Agency
Department Of Defense → W074 Endist Mobile
View Agency Profile
Office AddressMOBILE, AL, 36602-3630, USA
Contacts
Jessica Raulerson

Full Description

Show more
W9127826SC075 Space Port of the Future Infrastructure (SPOTFi) Campus, Cape Canaveral Space Force Station (SFS), FL. This is the official Other Transaction Agreement (OTA) Commercial Solutions Opening (CSO) for projects previously identified as W9127826RA075 and W91278269A075.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 380 calendar days from the date of award. The contract will be awarded based on the lowest price. Key requirements include adherence to the Buy American Act and the Davis-Bacon Act, as well as the provision of paid sick leave for employees. Depending on the proposal value, bid, payment, and performance bonds may be required. The contractor is responsible for implementing a Quality Control Plan and providing deliverables such as a facility operating plan, testing and performance data, and manufacturer-provided training information. Invoices must be submitted via Wide Area WorkFlow, and the final invoice requires a Contractor's Final Release and specific sea transportation certifications. Proposals are due by September 24, 2026, at 3:00 PM local time.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 561210
New
Federal
Solicitation - BWT Operation and Maintenance
Solicitation # W9127826RA005
The Mobile District of the U.S. Army Corps of Engineers is soliciting a five-year, single-award, firm-fixed-price, indefinite delivery indefinite quantity task order contract for the operations and maintenance of government-owned facilities and equipment across the Black Warrior-Tombigbee and Alabama River Waterways projects. Geographically spread across 13 Alabama counties, the scope of work includes the maintenance and minor construction of nine locks and dams, two hydroelectric generating plants, resource offices, boat houses, and various recreation assets across nine lakes. Key services encompass general facility maintenance, custodial services, grass mowing, riprap and earthen slope repair, hazardous material disposal, and the operation of a specialized floating plant consisting of towboats and barges. The contract period of performance is scheduled from March 1, 2027, to February 29, 2032. This procurement is a total set-aside for small businesses under NAICS 561210, with a size standard of 47 million dollars in average annual gross revenue. Award will be based on a best-value tradeoff analysis, prioritizing past performance and technical approach over price. The contractor will be required to adhere to USACE Safety Manual EM 385-1-1 and utilize the Wide Area WorkFlow system for invoicing. Government-furnished property, including vehicles and heavy equipment, will be provided to support the mission. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal, and the evaluation process will focus on the contractor's ability to ensure the reliable operation of critical navigation infrastructure.
Facilities Support Services

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS