Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Spaceport Operational Construction Consortium (SpOCC) Request for Information

Open
SLD30-SLD45_SpOCCFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Spaceport Operational Construction Consortium (SpOCC) is a market intelligence effort led by Space Launch Delta 30 and Space Launch Delta 45 to transition Vandenberg Space Force Base and Cape Canaveral Space Force Station into high-capacity spaceports. This large-scale infrastructure recapitalization aims to eliminate operational bottlenecks and enable launch-on-demand capabilities through a multi-phase investment portfolio. The government is seeking industry feedback on two primary pillars: Owner’s Advisory (OA) services for capital program evaluation and technical integration, and Construction Consortia & Acquisition Support (CCAS) to manage pre-qualified construction performers and execute awards under 10 USC 2808(a). The scope of work includes the development of project challenge statements, solicitation release, contractor selection, and the full lifecycle of project execution, acceptance, and closeout. The government is exploring various agreement structures to determine the most efficient way to manage these services across both geographic locations, while also seeking guidance on consortium management fees, conflict of interest safeguards, and the integration of acquisition support. This request for information is open to all qualified firms, with no specific set-aside status designated.

General Info

Industry feedback sought for upgrading spaceports via advisory services and construction consortia.

NAICS

541611 - Administrative Management and General Management Consulting Services

Place of Performance

Lompoc, CA, 93437, USA

Set-Aside

NONE

Documents

1
PDF, Low priorityother
Low

Read the document

Due in 23 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 23 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4610 30 Cons Pk
Contacts2 people available
OfficeVANDENBERG SFB, CA, 93437-5212, USA

Full Description

Show more

PROGRAM/PROJECT OVERVIEW: Space Launch Delta (SLD) 30 at Vandenberg Space Force Base (VSFB), California and SLD 45 at Cape Canaveral Space Force Station (CCSFS) and Patrick Space Force Base (PSFB), Florida are undergoing a fundamental shift in operations, transitioning into high-capacity spaceports. To support a dramatic and sustained surge in national security and commercial launch cadence, SLD 30 and SLD 45 Spaceport of the Future (SpOTF) teams are spearheading an unparalleled, large-scale infrastructure recapitalization effort. This represents a massive, multi-phase investment portfolio aimed at completely overhauling base infrastructure to eliminate operational bottlenecks and enable "launch on demand" capabilities.

To meet this demand, the Government is conducting market intelligence to explore industry interest, refine capability requirements, and formulate acquisition strategies across two pillars: 
1. Owner’s Advisory (OA) Services: An objective, holistic, advisory partner supporting capital program evaluation, independent Subject Matter Expert (SME) reviews, program level optimization (standardizations, environmental credit utilization), and technical integration.
2. Construction Consortia & Acquisition Support (CCAS): An agile collaborative structure to manage pre-qualified pools of construction industry performers, provide assistance in drafting, soliciting, and executing Other Transaction (OT) construction awards under 10 USC 2808(a), and perform pre- and post-award agreement administration, including construction inspection services.

Program Setup Questions:
1.  Which of the following options do you think would provide the best results for the Government? Why?
     • Option 1: Government executes a single agreement for OA and CCASS which includes performance at both SLD 30 and SLD 45
     • Option 2: Government executes two agreements, one for OA services and one for CCAS services, with each agreement including performance at both SLD 30 and SLD 45
     • Option 3: Government executes two agreements, one agreement for OA and CCAS services at SLD 30 and one agreement for OA and CCAS at SLD 45
     • Option 4: Government executes three separate agreements, one for OA services at both SLD 30 and SLD 45, and separate agreements for CCAS services at SLD 30 and SLD 45
     • Option 5: Government executes four separate agreements, separate agreements for OA and CCAS services at each of SLD 30 and SLD 45
2.  Would a single CCAS agreement providing service at both the SLD 30 and SLD 45 be reasonable? Why or why not?
3.  What issues or challenges would you expect with a single CCAS agreement covering both SLD 30 and SLD 45?
4.  Are there any benefits you would expect with a single CCAS agreement between SLD 30 and SLD45?
5.  Would a single OA agreement providing service at both SLD 30 and SLD 45 be reasonable? Why or why not?
6.  What issues or challenges would you expect with a single OA agreement covering both SLD 30 and SLD 45?
7.  Are there any benefits you would expect with a single OA agreement covering both SLD 30 and SLD 45?
8.  Are there any issues or challenges with coordination, standardization, or other aspects that you would expect or that should be considered by the Government if two separate OA agreements are made?

Consortium Questions:
9.  Two consortium structure options are presented in the SpOCC Structure Options attachment. 
     a. Which consortium structure do you think would provide the Government with the best results?
     b. Are there other structures you think could provide the Government with better results? If yes, please describe.
10.  Would you be willing to set up a consortium for these requirements?
     a. If yes, how long would you estimate the initial set up would take from agreement award to being ready to execute the first “order”?
11.  What information or support would need from the Government to aid in its set up?
12.  What type of management fee model (e.g. flat annual retainer, tiered percentage fee on issue agreements, membership dues, etc.) would you envision to ensure that management fees remain fair, reasonable, and fully transparent to the Agreements Officer? What mechanisms could be utilized to prevent duplicate payments or excessive administrative overhead?
13.  How would the management fee impact total project costs and how can fee structures be limited to maximize funding applied directly to each project’s design and construction?
14.  Are there startup costs outside of the management fee model that you would foresee?
     a. If yes, what types of costs and rough order of magnitude would you expect?
15.  How could a consortium attract commercial firms that do not normally engage in FAR/RFO-based construction contracts?
16.  Are there issues or challenges you would expect with incorporating the Acquisition Support with the Construction Consortia?
17.  Would you recommend Acquisition Support be separated from Construction Consortia requirements either as separate actions  or completely separate Other Transaction Agreements (e.g. One OTA to Company A for the Construction Consortia and one OTA to Company B for Acquisition Support)?
18.  What issues or concerns do you foresee if the Government implements a requirement for the Consortium Manager or construction contractors to obtain or have a security clearance in order to provide escort services (either in-house or contracted) for the construction efforts they would oversee?
19.  Are there any safeguards you would recommend to prevent conflicts of interest throughout the process to include the Consortium Manager providing post-award inspection services?
20.  Given the limitations of a contractor performing inherently governmental functions (IGF), what recommendations can you provide to best provide acquisition support while minimizing additional administrative burden on Government personnel (e.g. minimizing additional reviews, mitigating performance delays, etc.)?
21.  What issues or concerns would you foresee with establishing and maintaining qualified on-base personnel to provide acquisition support?
     a. Would a requirement to establish and maintain on-base personnel affect your management fee model recommendation?
22.  How can Construction Manager and Quality Assurance services be included within the Consortium to complement, rather than duplicate, Government Title II Quality Control inspection, and what specific pre-commissioning and turnover responsibilities should the Construction Manager hold?
23.  What recommendations would you suggest to delineate authority and daily operational responsibilities between the Government Agreements Officer, the Consortium Manager, and Government Project Managers?
24.  Are there any industry standards that could reduce additional review work for the owner/government when drafting solicitations?
25.  Are there any industry standards that could reduce additional review work for the owner/government after award?
26.  What governance models could be implemented to prevent the Consortium Manager from operating as a traditional "Prime" layer that insulates performing contractors from Government technical oversight (e.g. What models could be utilized to mitigate the Government’s loss of technical oversight due to not having privity of contract with subcontractors)?
27.  How can the Consortium structure pre-qualified builder pools to execute projects (similar to IDIQ MACC) rather than solely providing acquisition support?


OA Questions:
28.  If a firm provides Owner’s Advisory services, pre-award requirements development, or challenge statement drafting, how should the Government structure OCI clauses to prevent organizational conflicts of interest while maintaining a competitive pool for physical construction?
29.  How can an Owner’s Advisory team best evaluate the SpOTF portfolio at a macro level to ensure alignment with launch-on-demand throughput goals?
30.  What program control frameworks (e.g., integrated master scheduling, digital twins, portfolio risk modeling) are recommended?
31.  What proven approaches can an OA implement to drive standardization across diverse facilities (e.g., standardizing propellant storage designs, telemetry conduit, industrial power skids)?

SUBMISSION INSTRUCTIONS: Please submit your responses by 17 December 2026 at 1400 hrs. (2:00 PM) Pacific Standard Time (PST) to Jeffrey Grelck at Sign up to see this detail and Alyson Kolding at Sign up to see this detail
The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this potential program under 10 U.S.C. § 2808a.

Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates.

Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. 

Notice of Artificial Intelligence (AI) Utilization in Support of Review: Respondents are advised that the Government may utilize Department of War (DoW)-authorized, accredited Artificial Intelligence (AI) and Machine Learning (ML) tools operating within a secure Impact Level 5 (IL5) or higher Government environment to assist the review and consolidation of responses submitted under this Request for Information (RFI). Authorized AI support tasks are strictly administrative and analytical, such as summarizing technical content, cross-referencing information, and organizing data.

In accordance with DoW Ethical Principles for Artificial Intelligence (Responsible, Equitable, Traceable, Reliable, and Governable), AI tools will not be used to autonomously make programmitic decisions or develop requirements. All requirements and decisions  will be independently conducted, verified, and documented by designated Government personnel and the Contracting/Agreements Officer.

Similar Contracts

Same NAICS industry code

NAICS: 541611
New
SLED
Request for Proposal 26-09 Behavioral Health Consulting Services
Solicitation # RFP 26-09
The Alameda County Behavioral Health Department (ACBHD) is soliciting proposals for professional consulting, technical assistance, and administrative services to support the implementation of the Behavioral Health Services Act (BHSA) and other initiatives such as CalAIM. The selected contractor will serve as a fiscal and administrative agent, managing the engagement and payment of various consultants. This is a three-year Standard Services Agreement with a total allocated budget of $3,145,668, with an option to extend for an additional two years. The contract is scheduled to start on July 1, 2027. To qualify, bidders must have at least six years of experience within the last ten years providing behavioral health consulting to government entities and fulfilling fiduciary responsibilities as a fiscal administrative agent or sponsor. Proposals are evaluated based on the greatest value, where qualitative competence is weighted more heavily than cost. The budget allows for a maximum administrative fee of 20% of the total award, with the remainder allocated to external consultants. Bidders must submit a proposal narrative of no more than eight pages, a budget workbook in Excel, and a PDF copy of the full response via the OpenGov portal by December 8, 2026. There is no set-aside status for this solicitation.
Alameda County Health

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 541611
New
SLED
Colville Fuels, Coyote Ridge Golf Course — Consultant
Solicitation # Coyote-Ridge-Consultant-RFP-Final-with-Exhibits.pdf
Colville Fuels, LLC is seeking a qualified consultant to conduct a comprehensive operational, market, and capital needs assessment for the Coyote Ridge Golf Course in Washington. The primary objective is to develop an actionable operating and capital plan for FY 2027 and an integrated five-year development plan spanning FY 2027 through FY 2031. Key deliverables include an evidence-based SWOT analysis of golf, retail, and food-and-beverage operations, a market and demographic analysis, an on-site capital needs assessment, and a feasibility evaluation for an RV park, including its financial performance and operational impact. Proposals are due by November 20, 2026, and will be evaluated on a 100-point scale covering technical experience, the RV park approach, and the work plan, with an additional 0 to 15 points awarded for Indian preference. The contract is subject to the Colville Tribal Code Chapter 10-3 and TERO compliance requirements. Selected respondents must provide a fixed fee or not-to-exceed cost proposal with defined payment milestones. Final contract terms will be negotiated upon selection, and the agreement will include a no-assignment provision requiring written consent from Colville Fuels. There is no specified set-aside status for this solicitation.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 541611
New
SLED
Confederated Tribes of the Colville Reservation, Tribal Government Strategic Planning and Long-Term Governance Development
Solicitation # FINAL-RFP-for-Strategic-Planning-for-Tribal-Government.pdf
The Confederated Tribes of the Colville Reservation is seeking a qualified strategic planning consultant to develop a comprehensive, long-term strategic plan for the Tribal Government. This project focuses on evaluating governmental structures, financial sovereignty, constituent services, and economic development to enhance the Tribe's inherent sovereignty and self-determination. The scope of work is designed to be tribally driven and culturally informed, requiring the consultant to coordinate with tribal legal counsel on treaty interpretation and jurisdiction. Key deliverables include a project work plan, a traditional territories and rights strategy, and a final strategic plan featuring a vision statement, mission statement, and a measurable implementation framework. The contract is anticipated to be a labor hour type contract with an estimated performance duration of twelve months. Evaluation is based on a 100-point scale, and the Tribes may select a solution other than the lowest cost to ensure a reliable and effective result. Notably, a preference is given to Indian organizations and Indian-owned economic enterprises, with a specific award provision for responsible Indian Bidders whose proposals are within 10% of the lowest non-Indian proposal price. Administrative requirements include strict adherence to the Tribal Occupational Safety and Health Act (TOSHA) and the maintenance of confidentiality regarding all tribal data. All documents and reports produced during the engagement will become the property of the Colville Tribes. Contractors must provide detailed résumés for key personnel, who cannot be removed from the project without approval from the Tribes' COR. Payment is due within 30 days of a final invoice, and the contract prohibits assignment without written consent from the Tribes.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541611
New
Federal
IHS Evaluation Services IDIQ
Solicitation # 7571PS27Q00030
The IHS Evaluation Services IDIQ is a commercial Indefinite-Delivery, Indefinite-Quantity contract issued by the Department of Health and Human Services, specifically the Omas Strategic Buying Center - Professional Services. This procurement is a 100% Set-Aside for Indian Small Business Economic Enterprises (ISBEE) pursuant to the Buy Indian Act. The contract provides evaluation services to support the Indian Health Service (IHS) Division of Planning, Evaluation and Research (DPER) and various IHS programs. The total potential period of performance is 66 months, consisting of a 12-month base period, four 12-month option periods, and a final 6-month service extension. The contract utilizes a best-value award basis, where technical approach, key personnel and personnel management, and quality assurance are equally important and collectively carry more weight than price. Key labor categories include Project Managers, Project Directors, Subject Matter Experts, Researchers, Evaluation Specialists, Technology Specialists, and Editorial Specialists. Task orders are primarily issued as Firm-Fixed-Price, with a minimum guarantee of $1,000 for the initial kick-off and onboarding task order. All electronic deliverables must be Section 508 compliant and culturally appropriate. Invoicing is managed electronically through the Invoice Processing Platform (IPP), and travel is reimbursed on a cost-reimbursable, not-to-exceed basis.
Omas Strategic Buying Center - Professional Services

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → FA4610 30 Cons Pk

Same awarding agency

NAICS: 532120
New
Federal
30 CES FIRE DEPARTMENT - STRUCTURAL FIRE PUMPER VEHICLE LEASE
Solicitation # PRESOLICITION_NOTICE
The 30th Contracting Squadron at Vandenberg Space Force Base, California, is seeking a short-term commercial lease for one Type I Structural Fire Pumper Vehicle to support the 30th Civil Engineer Squadron Fire Department. This requirement is intended to maintain mission-essential firefighting capabilities and ensure 24/7 fire safety readiness in accordance with DAFI 32-2001. The lease is for a period not to exceed 119 days, with the vehicle required to be delivered to the 30 LRS Transportation Squadron within ten calendar days of the contract award. The vehicle must feature an enclosed, climate-controlled four-door cab with seating for at least six firefighters and comply with NFPA 1900 standards. This effort is a Small Business Set Aside - Total. The resulting contract will be a Firm-Fixed Price agreement. The contractor is responsible for all scheduled preventive maintenance and major repairs, with a requirement to dispatch a certified technician within 24 hours of a breakdown; a comparable replacement must be provided if the vehicle is out of service for more than 72 consecutive hours. Invoicing will be handled electronically via the Wide-Area Workflow (WAWF) system. Interested vendors must submit capability statements by December 8, 2026. Note that funds are not presently available, and no award will be made until funding is secured.
Truck, Utility Trailer, and RV (Recreational Vehicle) Rental and Leasing

POSTED

2 days ago

DEADLINE

in about 1 year
View Details
NAICS: 561210
Federal
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation # FA461027R0001
The Facility Readiness and Maintenance Execution (FRAME) contract is a 100% Small Business Set-Aside IDIQ effort managed by the 30th Contracting Squadron at Vandenberg Space Force Base, California. This follow-on acquisition to the Launch Operations Support Contract (LOSC) provides comprehensive maintenance, repair, modification, and modernization for over 130 facilities and equipment supporting Space Launch Delta 30 and various range users. The scope includes critical infrastructure such as water and gas mains, power distribution, HVAC, roofing, and the inspection and certification of cranes and elevators. Notably, the South Vandenberg Power Plant is no longer a requirement under the FRAME contract. Performance locations extend beyond Vandenberg SFB to include Pillar Point Air Force Station, Oak Mountain, and Santa Ynez Peak. The acquisition utilizes a best-value source selection process via a tradeoff method, prioritizing Technical factors over Past Performance and Cost/Price. A critical compliance gate is the Mission-Essential Contractor Services Plan, which must be rated acceptable for an offeror to be eligible for award. Technical evaluation focuses on Program Management, Maintenance and Repair, and Pressure Vessels. The contract structure includes various CLINs for program management and services using FFP, CPFF, and CPIF pricing models, with a specific incentive plan based on technical performance factors. The tentative schedule anticipates a final RFP issuance in January 2027, with proposals due in March 2027 and a performance start date of April 1, 2028.
Facilities Support Services

POSTED

21 days ago

DEADLINE

in 2 months
View Details
NAICS: 334515
Federal
Sources Sought - Modular Fiber Optic Test Platform
Solicitation # FA461026SS0001
The 30th Contracting Squadron is conducting market research via a Request for Information (RFI) to identify sources capable of providing a Modular Fiber Optic Test Platform for the installation, maintenance, and troubleshooting of fiber optic networks. This effort is a Total Small Business Set-Aside. The required system must be field-portable and consist of a battery-powered mainframe with at least four slots, 128 GB of internal flash memory, and a strict prohibition against integrated Wi-Fi, Bluetooth, or any RF-transmitting hardware. The platform must include two specific optical test modules: a quad-wavelength OTDR module supporting 850/1300 nm and 1310/1550 nm with intelligent link mapping for icon-based schematic views and pass/fail diagnosis, and a dispersion analyzer module capable of measuring both Chromatic Dispersion and Polarization Mode Dispersion. All optical test ports must feature a modular interface for tool-free connector adapter swapping. The complete system, including a fiber optic loopback mirror with a UPC polish connector, must be delivered in a single, hard-sided transit case. Interested vendors must submit their company details, CAGE code, UEI number, business size, and a capability statement not exceeding five pages by December 12, 2026.
Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

POSTED

11 months ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS