Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Spares: B-2 Hose Assembly, Non-metallic NSN: 4720-01-362-3482FW

Closed
FA811926Q0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336419
New
Federal
SR-1 Freedom Reactor Radiation Shielding Design/Build
Solicitation # INL-26-053
Battelle Energy Alliance (BEA), acting as the Management and Operating Contractor for the Department of Energy owned Idaho National Laboratory (INL), is seeking qualified firms for the design and fabrication of the Reactor Radiation Shielding (RRS) system for the NASA SR-1 Freedom interplanetary spacecraft. The RRS must protect spacecraft components from neutron and gamma photon radiation while operating in a space vacuum at temperatures ranging from -273°C to 800°C. Key technical requirements include a composite weight of less than 1200 kg and the ability to withstand launch forces and vibrations. The system must interface with the reactor structure, control drum actuators, Heat Management System heat pipes, and the Power Conversion System structure. The procurement process begins with an Expression of Interest (EOI) due by September 24, 2026, with a subsequent Request for Proposal (RFP) anticipated for late September or early October 2026. The final contract will be a firm-fixed price award executed in progressive phases, with the possibility of multiple firms being awarded design contracts before a final fabrication award is made. Project completion is required by July 2027. Qualified offerors must demonstrate expertise in radiation shielding design, transport modeling, and fabrication, and must maintain quality programs consistent with ISO 9001-2015 and ANSI/ASQC C1-1996 standards to be eligible for the INL Qualified Suppliers List.
Battelle Energy Alliance–doe Cntr

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The United States Air Force, through the Air Force Sustainment Center at Tinker Air Force Base, is soliciting firm-fixed price proposals under an indefinite-delivery requirements contract for the supply of the B-2 Hose Assembly, Non-metallic, identified by NSN 4720-01-362-3482FW and part number DAA3515A011-019. The solicitation, identified as FA8119-26-Q-0002, was issued on April 2, 2026, with a closing date anticipated for May 5, 2026, and responses are due by June 4, 2026. The contract requires delivery of nine production units and one unit designated for First Article Testing, along with supporting documentation including a First Article Test Report, Certificate of Compliance, Material Certification, and a Non-Recurring Engineering charge—all to be delivered under F.O.B. Origin terms. The product is a non-metallic hose assembly intended for the forward environmental control system of the B-2 aircraft, with dimensions specified as 11.2 inches in length and weighing 0.17 pounds, and must comply with MIL-STD-2073-1E for packaging and MIL-STD-129R for marking, including heat-treated wood packaging conforming to ISPM No. 15. The contract includes mandatory first article testing requirements overseen by the 424 SCMS/GUEA engineering office, with the test unit requiring unique tooling and must be manufactured at the same production facility as the subsequent units. All deliveries for production and test units are due by April 3, 2028, while supporting documentation must be submitted no later than January 1, 2027, with the NRE charge due by March 27, 2027. Inspection and acceptance occur at the contractor’s facility, with government quality oversight enforced through higher-level contract quality requirements referenced in FAR 52.246-11 and compliance with ISO 9001-2015 and AS9100 standards. The contract is open to three approved sources: The Boeing Company, Northrop Grumman Systems Corporation, and ITL Solutions LLC, with no set-aside for small business due to insufficient qualified small business capability. All responses must be submitted in writing via email, and b

General Info

USAF solicits non-metallic hose assemblies for B-2 aircraft; Boeing, Northrop, ITL approved contractors.

Agency

Department Of Defense → FA8119 Afsc PzabcView Agency

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

NONE

Documents

(6)

Solicitation+FA8119-26-Q-0002+P0001.pdf

PDF

Solicitation+FA8119-26-Q-0002.pdf

PDF

Packaging+Requirements.pdf

PDF

First+Article+Report.pdf

PDF

ITEM_DESCRIPTION.pdf

PDF

TRANSPORTATION+DATA.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8119 Afsc Pzabc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-3015, USA
Organization / Agency
Department Of Defense → FA8119 Afsc Pzabc
View Agency Profile
Office AddressTINKER AFB, OK, 73145-3015, USA
Contacts
Jonathan Payne

Full Description

Show more

The United States Air Force through Air Force Sustainment Center (AFSC), Tinker AFB 73145  is issuing a solicitation for a firm-fixed price (FFP) indefinite-delivery requirements contract for the supply of the B-2 Hose Assembly, Non-metallic.  


The requirements set forth in this notice are defined per Purchase Request FD-2030-26-00885 as follows:


Written response required.


(1)    Action Code: 


N/A


(2)    Date: 


2 April


(3)    Year: 


2026


(4)    Contracting Office Zip Code:


73145


(5)    Product or Service Code:


4720


(6)    Contracting Office Address:


DEPARTMENT OF THE AIR FORCE (DAF) 
BLDG 3001 SUITE 1AF1-99A 
TINKER AFB, OK. 73145


(7)    Subject:


Synopsis of Supply of Hose Assembly Non-metallic


(8)    Proposed Solicitation Number:


FA8119-26-Q-0002


(9)    Closing Response Date:


Anticipated solicitation issue date: 02 April 2026
Anticipated solicitation closing date: 05 May 2026


(10)    Contact Point or Contracting Officer:


Caleb Taylor
Contract Specialist
Caleb.taylor.8@us.af.mil


JONATHAN PAYNE
Contracting Officer
Jonathan.payne.11@us.af.mil


(11)    Contract Award and Solicitation Number:


N/A


(12)    Contract Award Dollar Amount:


N/A


(13)    Contract Line Item Numbers:


Proposed Line Items:


Line Item 0001: Hose Assembly Non-metallic
NSN: 4720-01-362-3482FW
Part number: DAA3515A011-019
Quantity: 9
 
Line Item 0002: Hose Assembly Non-metallic - FIRST ARTICLE
NSN: 4720-01-362-3482FW
Part number: DAA3515A011-019
Quantity: 1


Line Item 0003: First Article Test Report
NSN: 
Part number: N/A
    
Line Item 0004: Certificate of Compliance
NSN: 
Part number: N/A


Line Item 0005: Material Certification
NSN: 
Part Number: N/A


Line Item 0006: Non-Recurring Engineering NRE
NSN: O&A
Part Number: N/A


(14)    Contract Award Date:


N/A


(15)    Contractor:


There are three approved sources for the supply of this item:
The Boeing Company (CAGE: 81205)
Northrop Grumman Systems Corporation (CAGE: 1W025)
ITL Solutions LLC. (CAGE: 7BGA2)


(16)    Description:


(a)    National Stock Number (NSN) if assigned:


4720-01-362-3482FW


(b)    Qualification Requirement:


N/A


(c)    Manufacturer, including Part Number:


DAA3515A011-019


(d)    Size, dimensions, or other form, fit or functional description:


Length: 11.2000; Width: 1.0000; Height: 1.0000; Weight (HP): 0.1700


House Assembly Non-metallic for forward environmental control system for the B-2. 


(e)    Predominant material of manufacture:


Non-metallic


(f)    Quantity, Unit of Issue, including any options for additional quantities:


Line Item 0001: 9 EA - HOSE ASSEMBLY, NONME 


Line Item 0002: 1 EA - HOSE ASSEMBLY, NONME - BUY / FIRST ARTICLE


Line Item 0003: 1 EA - FIRST ARTICLE TEST REPORT 


Line Item 0004: 1 EA - CERTIFICATE OF COMPLIANCE


Line Item 0005: 1 EA - MATERIAL CERTIFICATION


Line Item 0006: 1 EA - NON-RECURRING EXPENSE


(g)    Unit of issue: 


Line Item 0001: Each
Line Item 0002: Each
Line Item 0003: Lot
Line Item 0004: Lot
Line Item 0005: Lot
Line Item 0006: Lot
(h)    Destination information:
FOB: ORIGIN


Line Item 0001:
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB    OK 73145-8000
TINKER AFB    OK 73145-8000
73145-8000
USA


Line Item 0002:
FY2303 DDOO SOP FIRST ARTICLE
CP 405-855-3961
7330 SENTRY BLVD BLDG 469 DOOR 12
TINKER AFB    OK 73145-8000
73145-8000
USA 


Line Item 0003:
FY2303 DDOO SOP FIRST ARTICLE
CP 405-855-3961
7330 SENTRY BLVD BLDG 469 DOOR 12
TINKER AFB    OK 73145-8000
73145-8000 
USA 


Line Item 0004:
FY2303 DDOO SOP FIRST ARTICLE
CP 405-855-3961
7330 SENTRY BLVD BLDG 469 DOOR 12
TINKER AFB    OK 73145-8000
73145-8000
USA 
Line Item 0005:
FY2303 DDOO SOP FIRST ARTICLE
CP 405-855-3961
7330 SENTRY BLVD BLDG 469 DOOR 12
TINKER AFB    OK 73145-8000
73145-8000
USA 


DODAAC: SW3211
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB  OK  73145-8000
TINKER AFB  OK
73145-8000
USA
  
(i)    Delivery schedule:


Line Item 0001: Hose Assembly, Non-Metallic
Deliver 09 unit(s) on 03 APR 2028. Early delivery is acceptable


Line Item 0002: HOSE ASSEMBLY,NONME - FIRST ARTICLE
Deliver 1 unit(s) on 03 APR 2028. Early delivery is acceptable


Line Item 0003: FIRST ARTICLE TEST REPORT
Deliver 1 unit(s) on 01 JAN 2027. Early delivery is acceptable


Line Item 0004: CERTIFICATE OF COMPLIANCE
Deliver 1 unit(s) on 01 JAN 2027. Early delivery is acceptable


Line Item 0005: MATERIAL CERTIFICATION
Deliver 1 unit(s) on 01 JAN 2027. Early delivery is acceptable


Line Item 0006: NON-RECURRING EXPENSE
Deliver 1 unit(s) on 27 MAR 2027. Early delivery is acceptable


(j)    Duration of the contract period:


The period of performance (PoP) will begin on the day of contract award and end on the day of Government acceptance of supplies. 


(k)    Sustainable acquisition requirements:


N/A


(l)    For a proposed contract action in an amount estimated to be greater than $25,000 but not greater than the simplified acquisition threshold -


(m)    Description of the procedures to be used in awarding the contract:
The request for quotation will be written and be posted on the Government-Wide Point of Entry (GPE), currently https://www.sam.gov. 


(n)    The anticipated award date:


N/A


(o)    Intended source and statement of the reason justifying the lack of competition:


N/A


(p)    Technical Data:


N/A


(17)    First Article: 


Required


(18)    Place of Contract Performance:


N/A


(19)    Set-aside Status:


Two or more small businesses capable of supplying this requirement are not available. This requirement is therefore not set aside for small business or any other socioeconomic concerns.  


(20)    NOTICE:


All questions regarding this notice are to be submitted in writing via E-mail.  All questions submitted to this office are subject to be posted in this notice along with the appropriate response(s).  Vendor identities will not be disclosed.  Prospective offerors must comply with all the requirements of the solicitation and any attachments thereto to be considered responsive.  All offerors are to specify in their response whether they are a large business, small business, small disadvantaged business, 8(a) concern, women-owned small business, HUBZone small business, veteran-owned small business or service-disabled veteran-owned small business.  Also offerors must specify whether they are a U.S. or foreign-owned firm.


OMBUDSMAN (AUG 2005) (An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition).  The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel.  When requested, the Ombudsman will maintain strict confidentiality as to source of the concern.  The Ombudsman does not participate in the evaluation of proposals or in the source selection process.  Interested parties are invited to call the Ombudsman at 405-736-3273.  DO NOT CALL THIS NUMBER FOR SOLICITATION REQUESTS.


Electronic procedures will be used for this solicitation. No telephone requests. Only written or emailed requests received directly from the requestor are acceptable.

More opportunities from Department Of Defense → FA8119 Afsc Pzabc

Same awarding agency

NAICS: 336413
Federal
Repair of B-2 Transponder Set NSN: 5895-01-383-4052 FW P/N: 159000-7
Solicitation # FA8119-26-R-0011
The United States Air Force, through the Air Force Sustainment Center at Tinker AFB, is soliciting a firm-fixed price, indefinite-delivery requirements contract for the repair of B-2 Transponder Sets (NSN: 5895-01-383-4052 FW, Part Number: 159000-7). The contract structure consists of a three-year basic period, a two-year option period, and a six-month extension. The scope of work includes the disassembly, cleaning, inspection, maintenance, reassembly, and testing of the transponder sets to return them to a serviceable condition. Key deliverables include the repair of units, over and above work, data reporting, surge expedite fees, material lay-in, and repair management. Associated Aircraft Manufacturing and Sales, Inc. is identified as the only approved source for this repair due to their possession of the necessary data, tools, and certified personnel, and the acquisition is conducted under FAR Part 15 procedures. The contractor must adhere to high-level quality standards, including ISO 9001-2015 and AS9100, and comply with strict packaging and marking requirements such as MIL-STD-2073-1E and MIL-STD-130N for unique identification. All payment requests and receiving reports must be processed electronically via the Wide Area Workflow (WAWF) system. The period of performance begins upon contract award and concludes upon government acceptance of the services.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

10 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS