Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Specialized Trailer Modification & Fabrication

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for Specialized Trailer Modification and Fabrication supports the Department of Defense under the Afnwc Pzbb rocket engine transport projects. The contractor is responsible for performing structural modifications to trailer bodies, which includes the installation of side doors, atmosphere sampling ports, and specialized tie-downs. These tasks require the use of metal fabrication, cutting, and welding equipment, as well as the performance of structural calculations to validate all modifications. The work will be performed at Hill Air Force Base, zip code 84056, under NAICS code 332312. The project was posted on September 15, 2026, with a response deadline of September 30, 2026. The final deliverable consists of modified trailer bodies featuring fully integrated doors, tie-downs, and ports.

General Info

Subcontract for DoD trailer modifications and fabrication at Hill Air Force Base.

NAICS

332312 - Fabricated Structural Metal Manufacturing

Place of Performance

Hill Air Force Base, UT, 84056, USA

Set-Aside

NONE

Documents

This scope was carved out of FA8214PTT2COTS.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

COTS Trailer/Modification Propulsion System Rocket Engine Transport Trailer (PTT2)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8214 Afnwc Pzbb
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural modifications for prime contractors on Afnwc Pzbb rocket engine transport projects. Installs side doors, specialized tie-downs, and atmosphere sampling ports using metal fabrication, cutting, and welding equipment. Performs structural calculations to validate modifications. Delivers modified trailer bodies with integrated doors, tie-downs, and ports.

More opportunities from Department Of Defense → FA8214 Afnwc Pzbb

Same awarding agency

NAICS: 336419
Federal
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production
Solicitation # FA821426RB004
The Department of the Air Force, Air Force Nuclear Weapons Center, is soliciting the production and delivery of 25 flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program. These kits, which consist of a Flight Destruct System and an Integrated Instrumentation System, directly support the Air Force Global Strike Command Minuteman III Intercontinental Ballistic Missile Force Development Evaluation Operational Test Launch Program. The government intends to award a Firm-Fixed-Price contract to The Boeing Company as a sole source, citing their unique technical data and infrastructure. The total estimated program value is approximately 955 million dollars, with a period of performance spanning from October 2027 through September 2035. The contractor is responsible for the assembly, testing, and just-in-time delivery of the kits to Vandenberg Space Force Base, California, precisely 120 days prior to scheduled launches, with the first delivery expected in January 2032. All hardware must comply with strict Range Commanders Council commonality standards and military packaging and marking specifications. The contract mandates rigorous quality control, including the submission of a Quality Assurance Program Plan and Acceptance Test Reports. Additionally, the contractor must adhere to stringent operations security, cybersecurity, and data rights requirements to protect critical information and ensure government access to necessary technical data.
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

POSTED

2 months ago

DEADLINE

in 4 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS