Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SR 241 Loma Improvements Project Design Services

Closed
K001644State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 12 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Foothill/Eastern Transportation Corridor Agency is seeking a qualified firm to provide comprehensive engineering services for the SR 241 Loma Improvements Project. The scope of work includes general engineering analysis, planning, final design, and design services during construction. The contractor is responsible for preparing Plans, Specifications, and Estimates (PS&E) in compliance with F/ETCA and Caltrans standards, with multiple submittal stages at 35%, 65%, 95%, 100%, and final bid documents. Additionally, the contractor must develop detailed plans, specifications, and construction cost estimates covering all project construction aspects. Furthermore, the contractor is tasked with preparing all necessary engineering reports to secure the Caltrans Encroachment Permit, responding to and resolving agency review comments, and delivering the final bid package ready for advertisement. This solicitation was posted on June 1, 2026, with a response deadline of July 13, 2026. The contract involves close coordination with the Contracts Department of the Transportation Corridor Agencies in California, and all inquiries should be directed to the primary contact, Kathy Nguyen. No bid bond is required for this project.

General Info

Engineering services for SR 241 project including design, PS&E, permits, reviews, final bid package preparation.

Place of Performance

125 Pacifica, Suite 100 Irvine, California 92618, CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Contracts Department of Transportation Corridor Agencies
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: The Foothill/Eastern Transportation Corridor Agency is seeking a qualified firm for general engineering analysis, planning, final design and design services during construction for final design services of the Loma Improvements Project as more specifically described in Exhibit A to the Form of Contract (Section III).
• CONTRACTOR shall prepare the PS&E for the Project to F/ETCA and Caltrans standards, requirements, and guidelines. It is anticipated that PS&E submittals for 35%, 65%, 95%, 100% and Final Bid Documents will be required. • CONTRACTOR shall determine the plans, specifications and construction cost estimates required to cover all aspects of the Project construction. • CONTRACTOR shall prepare all engineering reports for the approval of the Project by F/ETCA and Caltrans in order to obtain a Caltrans Encroachment Permit to construct the Project. • CONTRACTOR will respond and resolve all remaining reviewing agency comments and prepare the final Bid Package for advertisement.
Bid Bond: 0.00%

More opportunities from California → Contracts Department of Transportation Corridor Agencies

Same awarding agency

NAICS: 541512
SLED
Website Design, Development, and Maintenance Services
Solicitation # K001645
Solicitation K001645, issued on October 14, 2026, by the Foothill/Eastern Transportation Corridor Agency and the San Joaquin Hills Transportation Corridor Agency, seeks a qualified firm to provide strategic planning, design, development, and maintenance services for the agencies' online presence. The scope of work primarily focuses on the front-end, public-facing components of TheTollRoads.com, the 241-91ExpressConnector.com microsite, and FasTrak.org. Key deliverables include UX/UI enhancements based on analytics, annual toll calculator updates, SEO optimization, and the potential implementation of new websites. The contractor is also responsible for providing CMS troubleshooting and training support for the back-end secure site. The contract term begins on the effective date and continues through June 30, 2030. Proposals are due by November 12, 2026, via the PlanetBids portal and must include a technical proposal and a compensation proposal. Evaluation is based on the proposer's technical approach, experience, and ability to meet strict accessibility standards, specifically WCAG 2.2 AA compliance and ADA remediation. Award will be based on a ranking of responsive proposals, with the agency potentially conducting interviews before negotiating with the highest-ranked firm. Selected contractors must maintain records for six years following final payment and adhere to strict confidentiality and equal employment opportunity policies. Invoicing occurs monthly, with undisputed payments issued within 30 days of receipt.
Computer Systems Design Services

POSTED

15 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS