SR-280 Sinkhole Repair DO (EA 04-0V800)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 4 is seeking to repair roadway and drainage failures on State Route 280 in San Mateo County at post miles 6.82 and 7.1. These repairs are necessary to address sinkholes caused by winter storms that currently endanger public health and safety. At post mile 7.1, located between San Carlos Vista Point and Edgewood Road, the project involves repairing a concrete collar at a culvert, replacing a concrete roadway slab, and addressing a large washout. At post mile 6.82, located at the Edgewood Road off-ramp, the existing culvert will be lined. The scope of work includes the excavation of both sinkholes, backfilling with structural material, and compaction. Roadway restoration will consist of installing a hot mix asphalt dike and tack coat, paving damaged areas with asphalt concrete, and replacing all necessary pavement striping and delineation. Additionally, the project requires the implementation of permanent erosion control on the slope, the use of temporary k-railing, and comprehensive traffic control. This project is classified as a Class 1 Existing Facilities categorical exemption under PRC 21084 and 14 CCR 15301, as no environmental impacts are anticipated.

General Info

Emergency repair of sinkholes on SR 280 due to culvert failures, with excavation, backfilling, culvert repair, and resurfacing.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes repairing the roadway and drainage at post miles (PM) 6.82 and 7.1 on State Route (SR-) 280 in San Mateo County. Due to winter storms, sinkholes occurred at PM 7.1 between San Carlos Vista Point and Edgewood Rd and at PM 6.82 on the off-ramp at Edgewood Rd. Both sinkholes are on the shoulder of the mainline and were covered by steel plates. The sinkholes post a risk to SR-280 and endanger the health and safety of the public. The failed drainages post a future risk of subsequent sinkholes if they are not repaired. The sinkhole at PM 7.1 is adjacent to a 48-inch diameter culvert and 42-feet south of a drainage inlet (DI). The Damage Assessment Team concluded that the slope became over-saturated during a rain event and resulted in a large washout approximately 15-feet wide by 3-feet deep. The embankment has a 1.25H:1V slope. The existing ditch at the toe of the slope connected to the drainage inlet that was covered by the washout material necessitated the closure of Lane No. 1 to traffic. A culvert inspection determined that the failure of a concrete collar created the sinkhole. The sinkhole at PM 6.82 was caused by a culvert failure near the Edgewood Rd off-ramp near Lane No. 1. Geotechnical preliminary investigation recommends excavation of both sinkholes, backfilling with structural material, and then compaction. At the PM 7.1 sinkhole, the concrete slab on the roadway will be replaced and the concrete collar at the culvert will be repaired. At the PM 6.82 sinkhole, the existing culvert will be lined. The project will also install a hot mix asphalt (HMA) dike and tack coat. The damaged roadway will be paved with asphalt concrete (AC) and any damaged or removed pavement striping and delineation will be replaced. Permanent erosion control will be placed on the slope. Traffic control and temporary k-railing will be required during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; extensive pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, lighting, and landscaping. Additionally, the project requires environmental and support services such as storm water pollution prevention, quality control, and waste management, as well as the supply of ready mix, precast concrete, and manhole materials. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. All quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Bridge Front Upgrade Project (Re-Bid)
Solicitation # ITB27-6310-01B
The City of Lauderdale Lakes is soliciting bids for the Bridge Front Upgrade Project (ITB27-6310-01B) through its Public Works Administration. The scope of work involves the installation of decorative walls and pavers, swale regrading, minor drainage modifications, curb and pavement restoration, and signing and marking. All work must adhere to applicable building codes, City standards for dust nuisance abatement, and ADA guidelines for detectable warnings. Bids must be submitted via the City's eProcurement portal by December 9, 2026, at 3:00 PM. Qualified firms must demonstrate a track record of completing at least two similar projects in Florida and provide necessary licensing, certificates of competency, and a federal tax ID. Required submission documents include a bid bond, certificates and affidavits for bonds, and forms for subcontractors and principal materials manufacturers. The City evaluates respondents based on the licensing of supervising personnel, owned equipment, and confirmation of a drug-free workplace. The contract includes strict compliance requirements, including the Florida Trench Safety Act, E-Verify for employment eligibility, and certifications regarding scrutinized companies and foreign concerns. The successful contractor must provide performance and payment bonds in accordance with Florida Statutes and maintain all required insurance, submitting renewals 30 days prior to expiration. Payments are processed through the City's Accounts Payable Department within 30 days of invoice receipt, with a 15-day window for the City to notify the contractor of any disputed amounts.
Public Works Administration

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS