Stanislaus Elementary School Septic to Sewer Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stanislaus Elementary School Septic to Sewer Project, managed by the City of Modesto, involves replacing an outdated and failing septic system at Stanislaus Elementary School, located at 1931 Kiernan Avenue, with new sewer infrastructure. The scope of work includes the installation of approximately 4,100 to 4,700 linear feet of new sewer main within public street right-of-way to connect the school directly to the city's existing sewer system on Bangs Avenue. The alignment consists of approximately 1,600 feet running easterly along the north side of the Caltrans right-of-way in the SR-219/Kiernan Avenue bike lane to Carver Road, followed by approximately 2,700 feet running southerly along the centerline of Carver Road. Construction is anticipated to begin in 2026 and conclude in 2027, with an estimated total duration of 300 calendar days. The project plan expects the contractor to lay approximately 100 feet of pipeline per day over an eight-month period. This project is exempt from CEQA review under Public Resources Code Section 21080.48, as it benefits a small, disadvantaged community water system and meets specific environmental and mitigation criteria. Administrative oversight is provided by Senior Civil Engineer Jim Alves, and the project is subject to prevailing wages or skilled workforce requirements.

General Info

City of Modesto replaces Stanislaus Elementary septic with sewer infrastructure from 2026 to 2027.

Agency

California → City of Modesto

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Kiernan Avenue and Carver Road, Modesto, CA, 95356

Set-Aside

NONE

Documents

(1)

Stanislaus Elementary School Septic to Sewer Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Modesto
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Modesto
Office AddressN/A
Contacts
Jim AlvesSenior Civil Engineer

Full Description

Show more
The Project is proposed to connect Stanislaus Elementary School (School) directly to the City of Modesto's existing sewer system. The sewer main alignment will be a total of approximately 4,100 linear feet (lf), running from the School easterly approximately 1,600 feet along the north side of Caltrans right-of-way (ROW) in the SR-219/Kiernan Avenue bike lane to Carver Road, then southerly approximately 2,700 lf along the centerline of Carver Road to connect to the City's existing sewer on Bangs Avenue.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS