Revision Date: 03/18/2025
Page | 1
STATE OF VERMONT
CONSTRUCTION INVITATION TO BID
ISSUED BY: Department of Buildings & General Services
State House Wing Garden Plantings
ISSUE DATE: April 8, 2025
BIDDERS CONFERENCE: April 18, 2025
There will be a non-mandatory pre-bid meeting at the site on April 18, 2025 – 9:00 AM (EST)
Bidders to meet on front lawn at bottom of steps.
QUESTIONS DUE: May 2, 2025 – 4:30 PM (EST)
RESPONSES DUE BY: May 16, 2025 – 4:30 PM (EST)
STATE CONTACT: James Meyers, State Senior Purchasing Agent
E-MAIL :
contact@example.gov
I N D E X
INVITATION TO BIDDERS
INSTRUCTIONS TO BIDDERS
CERTIFICATE OF COMPLIANCE
BID PROPOSAL
MINORITY/WOMEN BUSINESS ENTERPRISES (M/WBE) CONTACT REPORTING FORM
SAMPLE CONTRACT INCLUDING ATTACHMENTS A&B
ATTACHMENT C: STANDARD STATE PROVISIONS FOR CONTRACTS AND GRANTS
CONSTRUCTION SITE WASTE REDUCTION PLAN
SAMPLE CHANGE ORDER
MINORITY/WOMEN BUSINESS ENTERPRISES (M/WBE) CONSTRUCTION CONTRACT REPORT
CONSTRUCTION EMPLOYMENT REPORT
EO – 02-22 – VENDOR CERTIFICATION FORM
GENERAL CONDITIONS
DRAWINGS:
G-001 - COVER SHEET
L-101 - EXISTING CONDITIONS
L-102 - SITE PREP AND DEMOLITION
L-103 - PROPOSED CONDITION PLAN
L-104 - LAYOUT PLAN
L-105 - PLANTING PLAN
L-106 - SITE DETAILS
Revision Date: 03/18/2025
Page | 2
CONSTRUCTION INVITATION TO BID
DEPARTMENT OF BUILDINGS AND GENERAL SERVICES
STATE OF VERMONT
Contractors are invited to bid on the State House Wing Garden Plantings Project for Buildings and General
Services at 115 State Street in Montpelier, Vermont.
This project consists of, but is not limited to, the installation of new ornamental perennial gardens, site
elements, and routine horticultural maintenance at 115 State Street.
1. Contractor shall review the attached construction document set in its entirety and install the project
as described in both the plans, details, specifications, and notes therein.
2. Contractor shall demolish and prepare the site in the manner described on the Site Prep and
Demolition Plan – Sheet L-102.
2.1. Contractor shall review notes and specifications on this sheet and abide by any directive
therein for field verifications and project coordination with the BGS Landscape Architect.
2.2. Damage done to items not specifically outlined for demolition or alteration in the plan set
shall be returned to their preconstruction condition at no additional cost to the owner.
3. Contractor shall furnish all items necessary to install the project as described on the Proposed
Conditions Plan – Sheet L-103.
4. Contractor shall review the Layout Plans – Sheet L-104 – and provide labor and materials and
methodologies to achieve the desired results.
4.1. Gardens shall be laid out in a symmetrical and equal way.
4.2. Garden bed layouts shall be approved by the BGS Landscape Architect and Owner prior to
installation.
4.3. Granite block seating shall be installed as symmetrically and equally as possible, and granite
block locations shall be staked for approval of the BGS Landscape Architect and Owner prior
to installation.
4.4. Contractor shall provide any necessary technology, instruments, or methodologies required
to lay out garden beds and benches..
5. Contractor shall furnish and install all plant material specified on the Planting Plan – sheet L-105.
5.1. Upon award the contract shall coordinate as soon as possible with a nursery supplier to
determine what, if any, substitutions or changes need to be made in the planting schedule.
5.2. Changes and substitutions shall be submitted in writing to the BGS Landscape Architect for
review and written approval.
5.3. Contractor shall make every effort to supply plants from nurseries located within New
England with plant material from New England.
5.4. Contractor shall supply material data to the BGS Landscape Architect to show conformance
with material specifications outlined on this sheet, planting details, and other notes as
necessary or requested.
5.5. BGS Landscape Architect reserves the right to refuse any plant materials that arrive on site
that do not meet the quality and standards as outlined in the notes and specifications of the
attached plan set. Rejected plant material will be replaced by the contractor at no additional
cost to the owner.
Revision Date: 03/18/2025
Page | 3
5.6. Contractor shall not plant damaged or diseased or infested plants, those plants shall be
rejected and replaced at no additional cost.
5.7. Contractor shall not prune any plant prior to planting without written approval from the
landscape architect.
5.8. Contractor shall provide a 12 month warranty on all plant material and replace any plant
material that fails to establish, dies within that 12 month period, fails to flourish or flower, or
otherwise shows poor health and establishment at no additional cost to the owner.
6. Contractor shall review and provide materials and labor as described in the Site Details – L-106.
6.1. Contractor shall furnish material data and information as necessary to certify that materials
ordered to the jobsite match the specifications contained in the notes and drawings. This
includes, but is not limited to manufacturer’s and product labels, supplier product
information or mix design, concrete mix ID or other identifying information, plant labels,
etc.
6.2. Contractor shall use native soils as a part of the Landscape Backfill material as directed by
the VTrans specification cited and shall lawfully dispose of or otherwise remove any unused
soils from the site as necessary. Contractor shall provide any testing or other soils evaluation
as required to lawfully dispose of any soils.
7. Contractor shall provide materials and labor to install the Granite Seat Blocks.
7.1. Granite seat blocks and materials shall conform to any material requirements or
specifications outlined on L-106.
7.2. Contractor shall advise the owner of any issues in material selections and make any necessary
substitutions or alterations in specifications at the time of award.
7.3. Contractor shall furnish all necessary product information, manufacturer’s labels, and
material samples as required by the attached drawing set.
8. Contractor shall warranty all plant materials.
8.1. Warranty trees and shrubs, for a period of one year after date of substantial completion,
against defects including death and unsatisfactory growth, except for defects resulting from
neglect, abuse or damage by others.
8.2. Remove and replace trees, shrubs, or other plants found by the Architect to be dead or in
unhealthy condition during warranty period. Make replacements during growth season
following end of warranty period. Replace trees and shrubs which are in doubtful condition
at end of warranty period; unless, in the opinion of the Landscape Architect, it is advisable
to extend warranty period for a full growing season.
8.3. Another warranty inspection will be conducted at end of the one-year extended warranty
period, if any, to determine acceptance or rejection. Only one replacement (per tree, shrub or
plant) will be required at end of warranty period, except for losses or replacements due to
failure to comply with specified requirements.
8.4. Winter use of road salt by the Owner will not void the guarantee/warranty.
9. Contractor shall provide costs separated out into the categories as outlined in attachment B in this
document.
10. Contractor shall dispose of all wastes generated by the project in a legal manner according to all
applicable local, state, and federal laws. Plant material and other organic materials shall be
composted.
Revision Date: 03/18/2025
Page | 4
11. Contractor shall return any areas disturbed by site operations outside the limit of work to their
preconstruction condition at no additional cost to the owner. Contractor shall not disturb,
undermine, damage, remove, or otherwise alter any site element (hardscape, landscape or other)
not explicitly labeled for alteration in the attached plan set. Contractor shall return, refurbish, or
replace any site element damaged by contractor operations at no additional cost to the owner.
Blueprints, Etc. is the official source of information for documents concerning this Invitation to Bid.
Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by
phone at
+1 (555) 000-0000, by fax at
+1 (555) 000-0000 or email to:
contact@example.gov. Project Manuals
and Plans are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any
and all notifications, releases and addendums associated with this project will be posted at
http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased.
Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD
1. Please be advised that all notifications, releases, and addendums associated with this
RFP will be posted on-line in the plan room where the original solicitation resides unless
otherwise determined that a hard copy is necessary. The state will make no attempt to
contact contractors with updated information. It is the responsibility of each
contractor to periodically check the posting site for any and all notifications, releases
and addendums associated with the RFP.
2. NOTE: On occasion hard copy addendums may be required due to size or type of
media/requirements. If applicable and as determined by the Department of Buildings and
General Services, for addendums that require hard copy distribution, a copy of such addenda
will be mailed or delivered for each set of plans and specifications issued to the bidders, prior
to the bid date. However, it is the responsibility of the bidder to be sure they have received all
addenda, and bidders are required to state the number of addenda they have received on the
proposal.
3. If Bidders choose to pull information from other third-party sites, Bidders do so at their own
risk as there is one official source of information for documents as indicated above.
SINGLE POINT OF CONTACT: All communications concerning this Invitation to Bid are to be
addressed in writing to the State Contact listed for this Invitation to Bid. Actual or attempted contact
with any other individual from the State concerning this Invitation to Bid is strictly prohibited and may
result in disqualification.
QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this
RFP or wishing to comment or take exception to any requirements of the RFP must submit specific
questions in writing to
contact@example.gov no later than 4:30 PM on May 2, 2025.
All questions should include State House Wing Garden Plantings Project in the subject line. Any
comments, questions, or exceptions not raised in writing on or before the last day of the question
period are waived. At the close of the question period a copy of all questions or comments and the
State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post
this information as soon as possible after the question period ends, contingent on the number and
complexity of the questions.
Bidder’s attention is directed to:
1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly
read and comply with all requirements.
Revision Date: 03/18/2025
Page | 5
2. STATEMENT OF RIGHTS: The State shall have the authority to evaluate Responses and
select the Bidder(s) as may be determined to be in the best interest of the State and consistent
with the goals and performance requirements outlined in this RFP. The State of Vermont
reserves the right to obtain clarification or additional information necessary to properly
evaluate a proposal. Failure of bidder to respond to a request for additional information or
clarification could result in rejection of that bidder's proposal. To secure a project that is
deemed to be in the best interest of the State, the State reserves the right to accept or reject any
and all bids, in whole or in part, with or without cause, and to waive technicalities in
submissions. The State also reserves the right to make purchases outside of the awarded
contracts where it is deemed in the best interest of the State.
2.1. Presentation. An in-person or webinar presentation by the Bidder may be required by
the State if it will help the State’s evaluation process. The State will factor information
presented during presentations into the evaluation. Bidders will be responsible for all
costs associated with providing the presentation.
3. COST OF PREPARATION: Bidder shall be solely responsible for all expenses incurred in
the preparation of a response to this RFP and shall be responsible for all expenses associated
with any presentations or demonstrations associated with this request and/or any proposals
made.
4. CONFLICTS OF INTEREST:
4.1. Organizational Conflict of Interest (OCOI): An OCOI arises when a bidder as a
business entity has interests (for example, customers, partners, contracts) that could
undermine, or reasonably be perceived to undermine, its faithful and unbiased
performance of a contract with the State that may result from this solicitation.
4.2. Personal Conflict of Interest (PCOI): A PCOI arises when an interest held by an
individual, agent or employee of a bidder could undermine, or reasonably be perceived
to undermine, its faithful and unbiased performance of a contract with the State that may
result from this solicitation.
4.3. Requirements: The State does not seek to contract with any individual or business
entity having a conflict of interest which cannot be mitigated to the State’s satisfaction.
To ensure the State’s awareness of actual, potential, or reasonably perceived PCOIs and
OCOIs, bidders shall:
a) Prior to submitting a proposal, conduct an internal review of its current affiliations
and activities and identify actual, potential, or reasonably perceived relative to a contract with the State that may result from this solicitation.
b) Disclose in your proposal any actual or potential PCOI or OCOI or the existence of
any facts that may cause a reasonably prudent person to perceive a PCOI or OCOI
with respect to a contract with the State that may result from this solicitation.
Disclose, also, any actions proposed to mitigate the PCOI or OCOI.
4.4. The State shall have sole discretion to determine whether a PCOI or OCOI can be
mitigated to the State’s satisfaction and may discuss the conflict with the bidder if and
to the extent the State deems discussion necessary to its determination. The State
reserves the right to (a) reject from further consideration any proposal having a PCOI or
OCIO that cannot be mitigated to the State’s full satisfaction and (b) terminate a
contract upon discovery that a contractor failed to disclose facts pertaining to a PCOI or
OCOI in its proposal, or otherwise misrepresented relevant information to the State.
Revision Date: 03/18/2025
Page | 6
5. Unsolicited Bidder-Confidential Information Prohibited. Bidders are hereby expressly
directed not to include any confidential information in their proposal submissions, except
as specifically permitted below. By submitting a proposal in response to this RFP, bidders
acknowledge and agree to abide by the terms and conditions outlined in this document,
including the prohibition on submitting confidential information. This prohibition reduces
the burden on the State while preventing bidder-confidential information from entering the
public record.
5.1.1. Disclosure under Public Records Act. All information received by the State in
response to this solicitation will become part of the contract file and subject to public
disclosure in accordance with the State’s Public Records Act, 1 V.S.A. § 315 et seq. The
State may also choose to publicly post responses to this solicitation and the resulting
agreement(s), following conclusion of this procurement process.
5.1.2. Unsolicited Confidential Materials. This RFP does not solicit bidder confidential
information and bidders are expressly prohibited from providing confidential
information in response to this RFP. All materials furnished by bidders in response to
this RFP, including those marked as confidential by bidders, are subject to disclosure if
requested under the Public Records Act, or public posting.
5.1.3. State Not Responsible for Disclosure of Unmarked Bidder-Confidential
Information. It is the sole responsibility of the bidder to ensure that, other than where
specifically directed or permitted by this RFP and accordingly marked as described
below, no information that should not be publicly disclosed is included in their proposal
materials, including any 1) trade secrets or intellectual property, 2) proprietary financial
or business information, 3) personal information, or 4) any other information that should
not be disclosed to the public. For example, bidders should avoid including specific
details of their proprietary technologies or methodologies that they consider confidential,
and any references to previous client engagements should be presented in a manner that
does not disclose the client's confidential information.
6. Funding Source:
This project is being funded, in whole or in part, through Major Maintenance.
7. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS: The Contractor is
hereby notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as
institutions or companies that are headquartered in Russia or have their principal place of
business in Russia) is prohibited. The awarded Contractor must fill out and sign the Executive
Order 02-22 Vendor Certification as part of the Contract awarding process. This certification
is required for all subcontracts for work performed solely for the State of Vermont and
subcontracts for work performed in the State of Vermont.
8. BIDDER QUALIFICATION PROCESS DOCUMENT: The Department of Buildings and
General Services is requiring that all contractors meet certain minimum qualifications to be eligible
to bid on this project.
9. BID SUBMISSION INSTRUCTIONS:
9.1. CLOSING DATE: Bids must be received by the State by the due date specified on the
front page of this RFP. Late bids will not be considered.
Revision Date: 03/18/2025
Page | 7
9.1.1. The State may, for cause, issue an addendum to change the date and/or time
when bids are due. If a change is made, the State will inform all bidders by posting
at the webpage indicated on the front page of this RFP.
9.1.2. There will not be a public bid opening. However, the State will record the name,
city and state for any and all bids received by the due date.
9.2. ELECTRONIC BIDS ONLY:
9.2.1. All bids under this RFP must be submitted electronically in accordance with
the submission requirements herein. Electronic bids will be accepted via email
submission to
contact@example.gov. The subject line of the email
submission must reference the Project Title as indicated on the front page of this
RFP.
9.2.2. Bids must consist of a single email with a single, digitally searchable PDF
attachment containing all components of the bid. Multiple emails and/or multiple
attachments will not be accepted.
9.2.3. There is an attachment size limit of 40 MB. It is the Bidder’s responsibility to
compress the PDF file containing its bid if necessary in order to meet this size
limitation. It is also the Bidder's responsibility to ensure that their own email system
can send and receive messages up to this size.
10. Bonding is NOT required for this job.
11. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings
and General Services (BGS) may require contractor evaluations on construction projects over
$100,000 or at the discretion of the BGS Director. Evaluations will be used to compile contractor’s
performance on BGS projects to provide a history and assessment of the contractor’s performance.
12. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and
requirements of this bid solicitation.
13. BID SUBMISSION CHECKLIST:
? Technical Response
? Bid Proposal Form
? Signed Certificate of Compliance
14. ATTACHMENTS – Refer to the Index
Sincerely,
Wanda Minoli
Commissioner
Department of Buildings and General Services