Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Steel Decking & Gangway Fabrication

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the fabrication and installation of a steel-frame deck and gangway system for prime contractors working on Lake County Community Development Department projects in Lakeport, California. The scope of work requires the construction of a 10-foot by 20-foot steel-frame deck and a corresponding gangway lift system designed to connect to a floating dock. The project specifies the use of structural steel framing and lift mechanisms to ensure the new installation matches the exact dimensions of a previously permitted structure. The contractor is responsible for the full delivery and installation of the completed steel-frame deck and gangway lift system at the designated site in Lakeport.

General Info

Fabricate and install a steel-frame deck and gangway system in Lakeport, California.

Agency

California → Lake County

Place of Performance

Lakeport, CA, 95453

Set-Aside

NONE

Documents

This scope was carved out of PL-25-417.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vaughn Lakebed Encroachment Permit PL-25-417

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Lake County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs a steel-frame deck and gangway system for prime contractors on Lake County Community Development Department projects in Lakeport, California. Constructs a 10-ft by 20-ft steel-frame deck and a gangway lift system for floating dock connection. Uses structural steel framing and lift mechanisms to match identical size of previous permitted structure. Delivers completed steel-frame deck and gangway lift system.

Similar Contracts

Same NAICS industry code

NAICS: 238390
New
Federal
Weatherproofing Units
Solicitation # N6339427Q4006
This solicitation, N6339427Q4006, is a total small business set-aside for the procurement, delivery, and on-site assembly of a turnkey weatherproofing system for forty-one wood-framed modular workspace units at Naval Base Ventura County in Port Hueneme, California. The project covers 58,772 square feet of aggregate surface area, consisting of thirty 12x36 foot units and eleven 12x16 foot units. The required system must utilize a minimum 10-mil virgin polyethylene resin film with UV inhibitors and flame-retardant additives meeting NFPA 701 standards. Protection must extend from the bottom chassis to the roofline, excluding the bottom 3-foot poly stilts, using non-penetrating fastening methods such as 3/4-inch woven polyester strapping with a 1,500 lb break strength. The contractor is responsible for all surface preparation, precision fitting, and the provision of all necessary equipment, including scissor lifts and safety gear. Performance includes a twelve-month maintenance period with recurring inspections every 60 to 90 days and emergency repair responses. Award will be based on the lowest priced, technically acceptable offer, with technical capability evaluated against specific part numbers and past performance assessed on a pass/fail basis. The period of performance is scheduled from December 7, 2026, to December 6, 2027. All electronic invoicing must be processed through the Wide Area Workflow system, and final acceptance is contingent upon a joint site walkthrough and a comprehensive quality assurance demonstration.
Commanding Officer

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS