This Subcontract opportunity from Georgia was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Steel Decking Replacement and Rehabilitation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
CBP7857 Center Gate Replacements
Solicitation # CBP7857
Management and Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide fence and gate repair services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work includes providing all labor, materials, equipment, and supervision to repair or replace designated drive gates, specifically focusing on the Building 29 South Drive Gate. Contractors must perform field verification of dimensions and hardware, execute structural repairs or full assembly replacements if damage exceeds 50 percent, and provide two sets of operation and maintenance manuals along with manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by November 17, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form accompanied by a detailed cost breakout on company letterhead. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond guarantee of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds within five business days of the Intent to Award Letter. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wage rates for Washoe County, Nevada, and the submission of certified payroll reports. Award decisions will be based on overall best value. Final acceptance of the work is contingent upon a substantial completion inspection, the resolution of a punch list, and the submission of a Notice of Final Completion and a Certificate of Release of Liens.
Sierra Nevada Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 9 hours
NAICS: 238190
New
SLED
Buena Vista Stormwater Pump Station Platform Repairs
Solicitation # US24005
The City of Stockton is soliciting bids for the Buena Vista Stormwater Pump Station Platform Repairs under solicitation US24005. The project requires a contractor to provide all labor, materials, and equipment to replace floor grating over existing sump pits A and B. Following Option 2 of the project plans, the contractor will abandon the existing grating configuration and install a new steel framed platform. The scope includes mobilization, demolition, installation of new framing and grating, and repairs to the top of the concrete wall. All work must be performed in accordance with the City of Stockton Standard Specifications, Caltrans Standard Specifications, and the California Building Code, specifically Chapter 17 for special inspections. The contract will be awarded to the lowest responsive bidder, with responsiveness contingent upon the disclosure of subcontractors and the provision of a bid guaranty of at least 10 percent of the total base bid price. The successful bidder must provide both Labor and Materials and Faithful Performance Bonds for 100 percent of the contract price and adhere to prevailing wage rates. Performance is managed by a Construction Manager, with payments issued monthly based on percentage completion. Bidders must submit sealed bid packets, including a Non-Collusion Declaration and proof of DIR registration, to the Office of the City Clerk by 2:00 p.m. on December 3, 2026.
City of Stockton

POSTED

about 18 hours ago

DEADLINE

in 16 days
NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm-fixed-price construction project for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The scope of work focuses on repairing or replacing eroded shear braces on the north wall and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders and is a total small business set-aside. The estimated magnitude of the project is between 100,000 and 250,000 USD, with a performance period of 195 calendar days from the notice to proceed. Eligible contractors must have attended the mandatory initial site visit on October 22, 2026, to be considered for award. Proposals are due by November 19, 2026, at 12 PM CST and must include a technical volume with a project narrative and a detailed price proposal broken down by CSI Master Format System divisions using AF Form 3052. Evaluation is based on technical capability and management, where only low-risk approaches are acceptable, and price reasonableness, balance, and realism. The contract mandates strict adherence to quality and safety standards, including the submission of a Quality Control Plan within 15 days of the notice to proceed and compliance with EM 385-1-1 and OSHA regulations. Key personnel requirements include a Project Manager with at least ten years of experience and a Quality Control Manager with at least five years of experience. Additionally, the contractor must comply with environmental requirements for Tinker AFB, including Oklahoma State Abatement Licensing and specific insurance for hazardous waste transport. Performance is subject to liquidated damages of 227.75 USD per calendar day of delay.
FA8137 Afsc Pzioc

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract entails the full replacement and rehabilitation of existing steel decking on a roof structure, involving the removal of damaged sections and the installation of new steel decking with necessary reinforcements to ensure structural integrity and longevity. This work requires precision in dismantling obsolete materials and integrating new components that meet industry standards for durability and safety, with attention to alignment, load-bearing capacity, and compatibility with existing roofing systems. This is a subcontract under NAICS code 238190, issued by Augusta University in Georgia, with a response deadline of May 29, 2026, at 3:00 PM. The project is scheduled for execution at an unspecified location within the state, and while detailed contact or address information is not provided, interested parties must submit proposals by the stated deadline to be considered. The contract does not specify any set-aside status, and all bids are expected to meet the technical and performance requirements outlined in the solicitation.

General Info

Steel decking replacement and reinforcement on roof; specialty trade; Augusta University; response by May 29, 2026.

Documents

This scope was carved out of PE-51200-RFQ-2026-000000036.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Christenberry Fieldhouse Roof Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • CBP7857 Center Gate ReplacementsOpen now, due in 1 day
  • Memorial Stadium - East Bleachers Improvements-RenovationsOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Augusta University
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → Augusta University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full replacement and rehabilitation of existing steel decking on the roof structure, including removal of damaged sections and installation of new decking with reinforcement as needed.

More opportunities from Georgia → Augusta University

Same awarding agency

NAICS: 238210
SLED
Interdisciplinary Research Building ¿ Replacement of the Fire Alarm System
Solicitation # PE-51200-RFQ-2027-000000040
Augusta University, through the Board of Regents of the University System of Georgia, is soliciting Construction Manager/General Contractor (CM/GC) services for Project No. J-473 to replace the fire alarm system in the Interdisciplinary Research Building (IRB). The IRB is a 211,000 gross square foot facility that houses a significant portion of the Health Science campus's research laboratories, lab services, and animal facilities. The existing system is over 30 years old and contains obsolete components. The scope of work includes the complete replacement of the fire alarm panel, sensors, horns, strobes, detectors, and the communication backbone, as well as integrating the new system into the existing campus fire alarm mesh network. The estimated construction cost for the project is 3,670,000 dollars, and the contract will be structured as Actual Cost plus a Fixed Fee, not to exceed a Guaranteed Maximum Price. The selection process is a two-step evaluation consisting of a Statement of Qualifications to identify finalists, followed by project proposals and interviews. Eligible firms must hold a valid Georgia General Contractor's License, maintain an Experience Modification Rating of 1.2 or less, and demonstrate financial liquidity with a current ratio of 1.0 or higher. Required submittals include various certifications, a contractor affidavit for E-Verify, and a proposer's disclosure statement. The selected CM/GC will be responsible for construction methods, safety, and scheduling coordination, and must provide comprehensive quality assurance and closeout management plans.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 months ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS