This Solicitation opportunity from Ohio was posted on January 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the replacement of select pool equipment at the Sterling Recreation Center, with an emphasis on expediting the design and construction processes to ensure the pool is open and fully operational by the summer recess of 2026. The Design-Builder is tasked with evaluating the feasibility of separate bid packages in coordination with the Director of the Mayor's Office of Capital Projects to optimize the economic interests of the City of Cleveland. The City has engaged an Architect and Engineering Consultant to provide ongoing advisory and construction administration support, including reviewing submittals, RFIs, and conducting field verifications throughout the project lifecycle.
Existing documentation, including design criteria and hazardous materials surveys, will guide the design and construction efforts. The project scope has received necessary approval from the Ohio Department of Health, and the selected design professional must submit sealed and stamped drawings to secure permits from the Cleveland Department of Building and Housing. The solicitation is managed by the Mayor’s Office of Capital Projects in Ohio, with Katie Chew serving as the primary project manager contact. The response deadline for interested parties is February 4, 2026.
General Info
Replace pool equipment at Sterling Recreation Center, ensure summer 2026 opening, optimize bids, secure permits.
PDF, High priority: read this first26 pages · supplemental-general-conditions
HighAI Summary for 14_PART_C_-_SUPPLEMENTAL_GENERAL_CONDITIONS: This document titled 'PART C SUPPLEMENTAL GENERAL CONDITIONS' provides supplemental provisions that amplify or modify the General Conditions of a contract. It includes detailed definitions and explanations of key terms such as Allowance, Alternate, Architect, Change Order, Contract Amount, Construction Duration, and others relevant to the administration and execution of a construction contract. The document clarifies the roles, responsibilities, and procedures related to contract modifications, project management, and completion criteria. It is a critical part of the contract documents, dated as part of the project manual, and essential for understanding the contractual framework and obligations for the project.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for 24_PW_RATES - Prevailing Wage Rates Cover Letter: A cover letter regarding prevailing wage rates for Cuyahoga County, Ohio. It directs contractors to the Ohio Department of Commerce website for current rates and specifies that the contractor is responsible for compliance and record-keeping throughout the contract duration.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for 25_AP-101_Sterling Recreation Center Pool Layout & Piping Plans: This document, dated 8/22/2025, contains detailed architectural and engineering plans for the Sterling Recreation Center pool layout and piping. It includes general notes, pool depth markings, no diving warnings, and site development information. The plans are prepared by Brandstetter Carroll Architects Engineers Planners for the City of Cleveland's Department of Public Works, intended for the Ohio Department of Health permit application.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for AR-2543 Sterling Recreation Center Pool Improvements: The City of Cleveland's Mayor's Office of Capital Projects is seeking a qualified Design-Build Team to provide professional architecture, engineering, and construction services for the Sterling Recreation Center Pool. The project involves replacing pool equipment, including circulation pumps, boilers, filter media, and chlorine/acid systems, with a goal of opening by Summer 2026. The solicitation was released on January 16, 2026, with a proposal submission deadline of February 4, 2026.
PDF
PDF, High priority: read this first28 pages · policy-manual
HighAI Summary for City of Cleveland City-Wide Asbestos Policy Manual (2017.05.19): This City-Wide Asbestos Policy Manual, effective May 19, 2017, provides comprehensive guidance for managing asbestos-containing materials (ACM) in City of Cleveland properties. It is designed to assist department and property managers in ensuring safety and regulatory compliance during maintenance, renovation, or demolition activities involving ACM. The manual outlines roles such as the Project Manager and Competent Person, details asbestos hazard management procedures, compliance requirements, training, medical surveillance, and emergency response protocols. It also includes attachments with forms and contact lists. The policy aims to prevent asbestos fiber release and protect employees, tenants, contractors, and visitors in accordance with federal, state, and local regulations.
PDF
PDF, High priority: read this first56 pages · contract-document
HighAI Summary for City of Cleveland Design/Build Contract Sample: A sample Design/Build agreement between the City of Cleveland and a Consultant Company. The document outlines the contractual relationship for a fast-track project, defining the contract documents, order of precedence, administration by the Director of Capital Projects, and key definitions such as 'Design Documents' and 'As-builts'.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for City of Cleveland Prevailing Wage Notification: This document notifies bidders and contractors that the contract is subject to Ohio Prevailing Wage Laws (Chapter 4115 O.R.C.). It outlines requirements for paying prevailing hourly wages and fringe benefits, submitting certified payrolls, and providing a final wage affidavit. Failure to comply may result in contract termination, debarment, or suspension of City of Cleveland certifications.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for City of Cleveland Professional Services Reimbursables Policy (01/01/2023): This document outlines the City of Cleveland's policies for reimbursable expenditures in Professional Services Contracts, effective January 1, 2023. It defines the distinction between Direct Labor and Reimbursables, specifies what costs must be included in labor multipliers (overhead, fringe benefits), and establishes requirements for the submission, approval, and invoicing of reimbursable expenses. It also provides detailed guidance on office expenses and equipment eligibility.
PDF
PDF, High priority: read this first1 page · equal-opportunity-clause
HighAI Summary for Contracting Officer's Equal Opportunity Clause 187.22: This document contains the Equal Opportunity Clause as per Section 187.22(b) Codified Ordinances. It outlines the contractor's obligations to prevent discrimination based on race, religion, color, sex, sexual orientation, gender identity or expression, national origin, age, disability, ethnic group, or veteran status during contract performance. The clause mandates affirmative action in employment practices, posting of nondiscrimination notices, communication with labor unions, and inclusion of the clause in subcontracts. It also emphasizes the City's policy to promote participation of local, minority-owned, and female-owned businesses in contracts, and grants the Director access to relevant compliance reports. The document is essential for ensuring compliance with equal opportunity and nondiscrimination requirements in City contracts.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for MOCAP Minimum Consultant Design Requirements and Deliverables (DASD): This document outlines the minimum required deliverables for consultants working with the City of Cleveland's Mayor’s Office of Capital Projects (MOCAP) for the Division of Architecture and Site Development (DASD). It defines specific requirements across multiple project phases, including Due Diligence and Existing Conditions, Program Verification and Preliminary Design, Schematic Design, and Design Development. The document specifies technical review requirements, drawing and specification standards for various disciplines (Architectural, Structural, MEP), and cost estimation formats.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Ohio Instructions for Preparing Certified Payroll Reports (2024.12.27): Guidance document from the Ohio Department of Commerce providing detailed instructions for contractors and subcontractors on how to complete certified payroll reports in compliance with Ohio's Prevailing Wage Law (Ohio Revised Code Chapter 4115). It specifies requirements for reporting employee data, work classifications, hours worked, base rates, and fringe benefit payments.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for Ohio Prevailing Wage Affidavit of Compliance: A legal affidavit form from the Ohio Bureau of Wage and Hour Administration used by contractors to certify that wages paid on a specific project comply with the prevailing wage requirements of Chapter 411.5 of the Ohio Revised Code. This document must be submitted to the public authority before the release of surety or final payment.
PDF
PDF, High priority: read this first4 pages · wage-determination
HighAI Summary for Ohio Prevailing Wage Contractor Responsibilities (2024.12.27): A summary of the legal responsibilities for contractors operating under Ohio's prevailing wage laws (Chapter 4115 of the Ohio Revised Code). The document outlines project cost thresholds for applicability, penalties for violations, requirements for apprentice ratios, payroll record-keeping, and detailed instructions for submitting certified payroll reports.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Ohio Prevailing Wage Notice - Valerie Harvey: This document is a Prevailing Wage Notice from the Ohio Department of Commerce, Bureau of Wage & Hour Administration, providing information on accessing wage rates electronically for public projects. It highlights the availability of wage rates and notifications via email for public authorities, contractors, architects, and engineers. Contact information for Valerie Harvey at the City of Cleveland Mayor’s Office of Capital Projects is provided for inquiries. The notice aims to facilitate efficient access to prevailing wage information for inclusion in bid specifications.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Ohio Prevailing Wage Notification to Employee (2024.12.27): A prevailing wage notification document for employees in the state of Ohio, dated December 27, 2024.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for Ohio Prevailing Wage Threshold Levels (2024.01.01): Official notice from the Ohio Department of Commerce regarding prevailing wage threshold levels effective January 1, 2024. It specifies the monetary thresholds for building construction ($250,000 for new; $75,000 for reconstruction) and road/bridge construction ($98,974 for new; $29,653 for reconstruction) that trigger the requirement for prevailing wage determinations in public improvements.
PDF
PDF, High priority: read this first13 pages · specifications
HighAI Summary for Part B - General Conditions (Revised August 28, 2025): This document outlines the General Conditions for a public improvement contract with the City of Cleveland, Ohio, revised August 28, 2025. It defines the contract documents, key terminology, and establishes legal and operational requirements including time of completion, liquidated damages, insurance, prevailing wage rates, and indemnification.
PDF
PDF, High priority: read this firstrfp-mailing-list
HighAI Summary for RFP Mailing List for Professional Architecture/Engineering Design Consulting - City of Cleveland: This document is an RFP mailing list dated 12/15/25 from the City of Cleveland Mayor's Office of Capital Projects, Division of Architecture and Site Improvement. It provides a master list of companies offering professional architecture and engineering design consulting services. The list includes company names, addresses, telephone numbers, contacts, and emails, intended for distribution to potential bidders or consultants for the design-build services project for the Sterling Rec Center Pool.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Section 01 74 19 Construction Waste Management and Disposal: Technical specifications detailing the administrative and procedural requirements for salvaging, recycling, and disposing of nonhazardous demolition and construction waste. It establishes a performance requirement to achieve a 50% salvage/recycling rate by weight and mandates the submission of a Waste Management Plan and progress reports.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for State of Ohio Certified Payroll Report (Part A & B): Standard State of Ohio forms (F330-03A and F330-03B) for Certified Payroll Reporting in public facility construction. The document includes templates for reporting hours worked, wage rates, fringe benefits, and worker identification to ensure compliance with prevailing wage laws.
PDF
PDF, High priority: read this first1 page · justification-and-authorization
HighAI Summary for Sterling Recreation Center Pool Design-Build OEO Subcontracting Goal Waiver: This document is a Subcontracting Goal Change Request Form for the Sterling Recreation Center Pool Design-Build project with an estimated budget of $300,000. It requests a full waiver of subcontracting goals (0% MBE, 0% FBE, 0% CSB) due to the limited number of qualified pool designers and renovation contractors in NE Ohio, none of which are registered OEO contractors. The form includes project details, established and proposed subcontracting goals, and a justification for the waiver. The OEO review section indicates approval or denial options for the waiver and goal changes, with contact information for assistance.
PDF
PDF, High priority: read this first32 pages · rfp
HighAI Summary for Sterling Recreation Center Pool Improvements RFP: This document is a Request for Proposal (RFP) issued by the City of Cleveland for the Sterling Recreation Center Pool Improvements project. Released on January 16, 2026, it seeks qualified Design-Build Team Partners to provide architecture, engineering, and construction services for pool equipment replacement and related improvements. The project aims for fast-track design and construction to open the pool by Summer 2026. The document includes an overview, program and scope of services, proposal schedule, submission requirements, selection criteria, and compliance information. Attachments cover sustainable building policy, construction waste management, wage determinations, and design-build agreement samples. Key contacts and timelines for questions and proposal submissions are provided.
PDF
PDF, Low priority4 pages · policy
LowAI Summary for City of Cleveland Subcontractor Addition and Substitution Policy: This document outlines the policies and procedures for City of Cleveland contractors to add or substitute subcontractors. It mandates prior Board of Control (BOC) approval before any subcontractor begins work, requires verification from the Office of Equal Opportunity (OEO) for certified small, minority, or female business enterprises, and specifies a three-week lead time for submission of requests to avoid project delays.
PDF
PDF, Low priority10 pages · policy
LowAI Summary for City of Cleveland Sustainable Municipal Building Policy (April 2013): Issued in April 2013, this policy mandates the incorporation of green building practices into the design, construction, and maintenance of City of Cleveland facilities. It establishes goals for energy, water, and greenhouse gas reductions, and requires LEED Silver certification or higher for new construction and major renovations over 10,000 square feet.
Description of Need: The project is to replace select pool equipment. The goal is to fast-track design and construction, and open the pool by Summer of 2026, and be fully occupiable and operational at the onset of Summer recess. Possible Separate Bid Packages: Based on any opportunity agreed upon with the Director of the Mayor's Office of Capital Projects, the Design-Builder shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City. City's Consultants : The City of Cleveland has retained a bridging criteria Architect and Engineering Consultant(s) ("Consultant" "City's Consultant" "Architect" "Engineer" "A-E" "Criteria Designer") through the end of Construction, of which will remain contractually under the City of Cleveland or its' Designee. The Consultants shall advise and consult with the City, and may perform such tasks as submittal and RFI review, field verification, meeting attendance, and other customary Construction Administration activities. Existing Documentation Brief: MOCAP and the Owner's Representative Team have compiled design criteria documents which capture the owner's intended function for the pool and its pool systems affected by this work. This information will serve as a basis for the overall project intent. See the attached Hazardous Materials Survey from May 2020, and post abatement inspection & air clearance sampling report from March 2024. See also the attached drawing AP-101 dated 8/22/2025 and the included scope of work and services for reference. Ohio Department of Health approval was obtained in October 2025 for the scope of work & drawing AP-101 by Brandstetter Carroll, Inc. The selected Design Professional is required to take ownership of the scope of work and provide sealed & stamped drawings to obtain permit approvals though Cleveland Department of Building and Housing.
More opportunities from Ohio → Mayor's Office of Capital Projects
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.