Stocker Street Creative - ENV-2024-326-MND

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stocker Street Creative project, identified as ENV-2024-326-MND, involves the demolition of five unoccupied office buildings totaling approximately 123,354 square feet and the construction of a comprehensive studio and sound stage production campus on a five-acre site in Los Angeles, California. The new development consists of six buildings, totaling approximately 256,758 square feet, including a seven-story office and production support building with a rooftop restaurant, a security office, two sound stage facilities with a mill shop, and a 122,358-square-foot parking garage with 344 stalls. The project also features a 31,000-square-foot community open space and requires significant grading, including 27,800 cubic yards of cut and 6,000 cubic yards of fill. The project is managed by the City of Los Angeles and has undergone extensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. Key technical assessments have been completed, including geotechnical and soils reports, air quality and greenhouse gas studies, and a transportation assessment that includes signal and striping improvements at the intersection of Santa Rosalia Drive, Angeles Vista Boulevard, and Stocker Street. Environmental mitigation includes the planting of 61 new trees to offset the removal of 29 mature trees and the implementation of noise and vibration controls. While cultural and paleontological assessments found no significant on-site resources, the project maintains compliance with local building codes and safety standards, including coordination with the California Highway Patrol regarding traffic safety and emergency response access.

General Info

Los Angeles project: demolishing five buildings to build a studio and production campus.

Agency

California → City of Los Angeles

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Stocker Street between Don Felipe Drive and Santa Rosalia Drive, Los Angeles, CA, 90008

Set-Aside

NONE

Documents

(14)

3701-3761 Stocker Street Cultural Resources Assessment

PDFcultural-resources-assessment

Appendix E - Geotechnical Report and Soils Report Approval Letter

PDFgeotechnical-report

ENV-2024-326-MND Stocker Street Creative Project Initial Study/Mitigated Negative Declaration

PDFmitigated-negative-declaration

Appendix B - Arborist Report for Stocker Campus Plaza

PDFarborist-report

Notice of Completion for Stocker Street Creative Project

PDFnotice-of-completion

SCH Summary Form for Stocker Street Creative Project

PDFenvironmental-summary

City of Los Angeles CEQA Notice of Determination for Stocker Street Creative Project

PDFnotice-of-determination

Appendix A - Air Quality Study for Stocker Street Creative Project

PDFair-quality-study

Appendix F - Greenhouse Gas Emissions Study for Stocker Street Creative Project

PDFstudy-report

CHP Comments on Stocker Street Creative Environmental Impact Report SCH#2025110100

PDFcomment

Appendix D - Paleontological Resources Assessment for Stocker Street Creative Project

PDFpaleontological-resources-assessment

NOI to Adopt Mitigated Negative Declaration for Stocker Street Creative Project

PDFnotice-of-intent

Appendix H - Transportation Assessment for City Planning Project

PDFtransportation-assessment

Appendix G - Noise and Vibration Study for Stocker Street Creative Project

PDFstudy

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts

Interested Companies (1)

Show more
Terry A. Hayes Associates
Culver City, CA

Full Description

Show more
The Project consists of the demolition of five substantially unoccupied office buildings, totaling approximately 123,354 square feet and the construction of a campus for studio and sound stage production, totaling approximately 256,758 square feet exclusive of the parking garage (114,405 square feet), on an approximately five-acre site that slopes approximately 35 feet northwest to northeast. The integrated campus would consist of six new buildings (Buildings A through F). Building A would be a three-story (45 feet, 54 feet including architectural features and 56 feet including the equipment screen wall), 34,710-square-foot office building that would include 500 square feet of retail space and a 8,452-square-foot food court on the first floor. Building B would be a seven-story (110 feet), 138,725square-foot building with 42,697 square feet of studio production support facilities on the first two floors and 84,548 square feet of office space above. The roof (partial 7th floor) would include an enclosed 9,081-square-foot restaurant with an adjacent approximately 7,500-square-foot open/garden area that would provide outdoor seating for the restaurant and be used for special events. Building C would be a one-story (14 feet), 300-square-foot security office that would include a restroom, breakroom and surveillance monitors and computer equipment. Building D would be a one-story (63 feet), 31,941-square-foot building with 30,000 square feet of studio sound stages and 1,941 square feet of back-of-house facilities. Building E (82 feet) would be a 42,363-square-foot building with a basement with office space, a 12,957-square-foot mill shop with a mezzanine for set production, and 19,200 square feet of studio sound stages. Building F would be a five-story (45 feet and 54 feet including architectural features), 122,358-square-foot open parking garage with 344 parking stalls, a 2,683-square-foot community room at street level, and 5,270 square feet of back-of-house facilities. There would also be a 31,000-square-foot open space area between Buildings A, B, and F designed for community gatherings and special events. The floor area ratio (FAR) for the Project site would be 1.49:1 on the portion zoned C2-1 and 0.53:1 on the portion zoned C2-1 SP. Project grading activities would include 27,800 cubic yards of cut and 6,000 cubic yards of fill; 21,800 cubic yards of soil would be exported from the Project site subject to a haul route permit. The Project would not include the removal of any street trees. The Project would include the removal of 29 mature trees on-site; however, a total of sixty-one new trees would be planted on site as part of the Project.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Federal
FY27 SPECIAL PROJECT USNH YOKOSUKA ALTERATION, JAPAN
Solicitation # N4008427R1027
This is a sources sought notice issued by the Naval Facilities Engineering Systems Command Far East for a major renovation project at U.S. Naval Hospital Yokosuka in Japan, with a projected scope valued between $100 million and $250 million. The notice is not a solicitation for proposals but a market research effort to identify qualified contractors capable of performing a Design-Bid-Build construction project involving three interrelated packages: Package A, the base electrical infrastructure work requiring 578 calendar days; Package B, alterations to Buildings 1400 and 1407 at 1,627 calendar days; and Package C, renovation of the operating room in Building 1400 at 986 calendar days. Package A must be completed before work on Packages B and C can commence, and those two are optional, subject to future funding and exercise after award. The work encompasses extensive civil, structural, architectural, mechanical, electrical, plumbing, fire protection, cybersecurity, hazardous material abatement, antiterrorism, and sustainability measures across multiple hospital departments including the Emergency Department, Inpatient Pharmacy, Radiology, Sterile Processing, Surgery Suites, and Laboratory, requiring full compliance with UFC and NFPA standards, ABA accessibility standards, MHS World Class Checklist, and Japanese regulations. Contractors must be legally authorized to conduct business in Japan, possess a valid construction license issued by the Ministry of Land, Infrastructure and Transport or a prefectural authority, and be capable of executing complex renovations within an active military medical facility without disrupting critical operations. The U.S. Government will not extend United States Official Contractor status or civilian component certification under the U.S.-Japan Status of Forces Agreement, meaning contractors and their personnel must operate under local Japanese law without U.S. diplomatic protections. Responses must be submitted electronically via the designated Contractor Information Form, limited to 12 single-sided pages or six double-sided pages with 12-point font, including up to five detailed project examples that demonstrate relevant experience, capability, and capacity. All submissions must be received by 1530 JST on August 10, 2026, and no reimbursement will be provided for response costs. Proprietary information will be safeguarded and used solely for acquisition planning; no contract award will result from this notice, no evaluations or feedback will be issued, and no binding obligations are formed regardless of the substance of submissions. The contract type, when awarded, will be firm-fixed-price with performance occurring entirely on the
Navfacsyscom Far East

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, Project 7190530, involves upgrading the life health safety systems in Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs within an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 380 calendar days after the award. The basis for award is the lowest price, and the successful offeror will be issued a task order under MACC contract N4008525D. Key administrative requirements include the submission of proposals by September 24, 2026, at 3:00 PM local time. Bonding requirements are tiered based on proposal value, with bid, payment, and performance bonds required for proposals exceeding 150,000 dollars. The contract is subject to the Davis-Bacon Act and the Buy American Act, and it mandates specific paid sick leave for employees. Invoicing must be processed through Wide Area WorkFlow, and the contractor is required to maintain a comprehensive quality control system covering both onsite and offsite operations. Final acceptance is contingent upon a series of inspections, including punch out, pre-final, and final acceptance inspections.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS