Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Stonelake Landing Dutch Bros (PLNG23-022)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Elk Grove

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Elk Grove, CA

Set-Aside

NONE

Documents

(1)

PLNG23-022 Notice of Exemption for Stonelake Landing Dutch Bros Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Elk Grove
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Elk Grove
Office AddressN/A
Contacts
Joseph DagumanAssociate Planner
Paul FrankRepresentative

Full Description

Show more
The Stonelake Landing Dutch Bros Project (the “Project”) consists of a Conditional Use Permit with an Exception for Hours of Operation and a Design Review Amendment with a Deviation for Landscaping and Screening of the Drive-Through Aisle to modify the site layout for Parcel 7 (Building F) within the previously-approved Stonelake Landing Shopping Center (EG-04-738) for the construction of a new ±790 square-foot restaurant building with an outdoor patio area and drive-through service. The CUP requires an exception as the proposed hours of operation for the drive-through are 24 hours a day, seven days a week. This Project will supersede the prior Design Review for Building F that was originally approved with the Stonelake Landing Shopping Center Project (EG-04-738). The Project shall comply with the City’s Climate Action Plan (CAP) for nonresidential development, including CAP measures related to energy efficiency (BE-4), solar readiness (BE-7), off-road construction fleet (TACM-8), and electric vehicle charging (TACM-9).

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS